Вы находитесь на странице: 1из 1

1 2 3 4 5 6 7 8

NOTES :
U
F B T F

s
C D E F G H I J K L M N O P

WT-21
16000

E REV DATE BY DESCRIPTION E


0 01 - 08 - 20 Viero Widyanto For Approval

92112-HW-2"-BOP.+3940
91117-CW-2"-BOP.+3800
93128-SMH-0.5" BOP +2000
93105-SMH-1"-BOP.+2140

93106-SML-1.5""-BOP.+2140

93106-SML-3"-BOP.+5165

UP
2
BOP. +2053 D=2 1/2"
S=2 1/2"
92110-HW-1.5"-BOP.+6550
N-1
92111-HW-3"-BOP.+2053 P-92.01B
N-8

301
BOP. +2053 S=2 1/2" D=2 1/2"

ROAD CONCRETE P-92.01A

±0.000 3
FORMALIN DEARATOR P-92.01.02A P-92.01.02B

4
PLANT 3
+4.100
OWNER :
92117-HW-1.5"-BOP.+2055

RENCANA
LOKASI PARAFORM
D
PLANT PT. DOVER CHEMICAL D
302 FLOOR CONCRETE
+1.500
( MERAK PLANT )

NAMA TANGGAL PARAF

DRAW BY : Viero Widyanto

FLOOR CONCRETE
Drum

Elv ±0.000
Drum

+1.500 SCRUBBER CHECKED BY : Lastarida Sinaga


Elv +0.600

TK

CONTROL
TK. PENGUIN

PANEL
10 KL
WEAK BASE ANION WEAK BASE ANION
5000 LT

CHECKED BY : Adi Siswandana


Elv +0.750

C Elv -0.050

DEACID PLANT
DRAIN TANK C
Panel Panel Panel

Paving Block
Elv -0.100
CHECKED BY : Achmad Wahyudi R
H I J K
Underground
PVC 2"

EL : 0.00
EL : 0.00
CHECKED BY : Andres Suranto

CHECKED BY : Heru Sulistiyo

ROAD CONCRETE ROAD CONCRETE


±0.000 ±0.000 CHECKED BY : Margono Somowijoyo
B B
APPROVED BY : Chai Ming Hooi
PROJECT NAME :
PROJECT INSTALLATION PIPING DESTILLATE
FORMALIN PLANT 3 & PARAFORM PLANT
PT. DOVER CHEMICAL MERAK
DWG TITLE :
LAYOUT LOKASI PROJECT INSTALLATION
PIPING DESTILLATE
A LAYOUT LOKASI PROJECT DWG NO : 007 - DC - PFA & FP3 - PIPING - PLANT B - ( SHEET 01 OF 10 A
)
INSTALLATION PIPING DESTILLATE FILE NO : M & E - DC - WO - PRJ - FP30015 - VII - 2020
SCALE : DWG SIZE : A4 REV NO :
1 : 200 R-0
0 1 2 3 4 5 6 7 8 9 10

Вам также может понравиться