ABSTRACT

NOT SATISFIED DETAILS (QUALITY CONTROL) - AUGUST 2016

NAME OF QC DIVISION: MADURAI NAME OF C&M DIVISION: DINDIGUL

NO OF TESTS NOT SATISFIED


TOTAL NO OF
NO OF WORKS TESTS RECTIFIED
QC SUB NO OF TESTS UPTO DURING THE TOTAL RECTIFIED
SNO CHECKED UPTO CONDUCTED UPTO Previous NOT RECTIFIED REMARKS
DIVISION SATISFIED PREVIOUS MONTH OF ( UPTO AUG THIS Month
AUG 2016 UPTO AUG Month
2016 MONTH AUG 2016) 2016)

1 2 3 4 5 6 7 8 9 10 11 12

1 Dindigul 24 206 195 9 2 11 9 2

20 182 173 9 0 9 9

TOTAL 24 206 195 9 2 11 9 2

Divisional Engineer (H)


Quality Control Division
Madurai
ABSTRACT
ADE NOT SATISFIED DETAILS (QUALITY CONTROL) - JUNE 2017

NAME OF QC DIVISION: MADURAI NAME OF C&M DIVISION: DINDIGUL


.
NO OF TESTS NOT SATISFIED
TOTAL NO OF
NO OF WORKS TESTS RECTIFIED
QC SUB NO OF TESTS UPTO DURING THE TOTAL RECTIFIED
SNO CHECKED UPTO CONDUCTED UPTO Previous NOT RECTIFIED REMARKS
DIVISION SATISFIED PREVIOUS MONTH OF ( UPTO JUN THIS Month
JUN 2017 UPTO JUN Month
2017 MONTH JUN 2017) 2017)

1 2 3 4 5 6 7 8 9 10 11 12

1 Dindigul 61 503 473 27 3 30 27 3

TOTAL 61 503 473 27 3 30 27 3


ABSTRACT
NOT SATISFIED DETAILS (QUALITY CONTROL) - SEPTEMBER 2016

NAME OF QC DIVISION: MADURAI NAME OF C&M DIVISION: DINDIGUL

NO OF TESTS NOT SATISFIED


TOTAL NO OF
NO OF WORKS TESTS RECTIFIED
QC SUB NO OF TESTS UPTO DURING THE TOTAL RECTIFIED
SNO CHECKED UPTO CONDUCTED UPTO Previous NOT RECTIFIED REMARKS
DIVISION SATISFIED PREVIOUS MONTH OF ( UPTO SEP THIS Month
SEP 2016 UPTO SEP Month
2016 MONTH SEP 2016) 2016)

1 2 3 4 5 6 7 8 9 10 11 12

1 Dindigul 30 274 261 11 2 13 11 2

20 182 173 9 0 9 9

TOTAL 30 274 261 11 2 13 11 2

Divisional Engineer (H)


Quality Control Division
Madurai
NOT SATISFIED TEST DETAILS FOR THE MONTH OF JUNE 2017

NAME OF QC DIVISION : MADURAI NAME OF C&M DIVISION: DINDIGUL


Item of Tests

Field density
Slump Cone

Compaction
Undulations

Temparatur
No. of test

Thickness

Gradation

Rectified
Not
Content
Binder

Rectified/
Width
S.No Name of work(Division Wise) Not

Total
Test

e
Satisfied

Name of Q.C Subdivision: Dindigul

Widening from Intermediate lane to Double lane and


Strengthening of Dindigul - Manakkattur Road at km
1 1 1 1 Rectified
5/0 - 7/0, Strengthening at km 4/0 - 5/0 including CD
Works in km 4/0-7/0 (MD 590)

Strengthening of Puliyarajakkapatti -Pudupatti Road at


2 1 1 1 Rectified
km 0/0 - 5/880 including CD Works

Re-Construction of Minor Bridge at Km 7/2 of


3 1 1 1 Rectified
Vedasandur - Kovilur Road

Total 3 0 0 0 2 1 0 0 0 0 3
ADE RECTIFICATION REPORT

NAME OF QC DIVISION: MADURAI NAME OF C&M DIVISION: DINDIGUL Period : JUNE 2017

Name of Name of Instruction for


Sl. Est Amt in Nature of Inspected Date of Defects Date of Date of
Execution Execution Name of work Item of work rectificatio of Remarks
No lakhs Work by Inspection Noticed rectification Compliance
circle Division Defects Noticed

Name of the QC Sub Division:Dindigul

Widening from Intermediate lane to Remove


Double lane and Strengthening of upper limit Copy of
Madurai Dindigul Dindigul - Manakkattur Road at km CRIDP Unsatisfied material and QC register
1 180.00 BM 1 DE 11.06.2017 gradation satisfy the 11.06.2017 11.06.2017
(H) C&M (H) C&M 5/0 - 7/0, Strengthening at km 4/0 - 2016-17 page
5/0 including CD Works in km 4/0- proper enclosed
7/0 (MD 590) gradation.

Remove
upper limit Copy of
Strengthening of Puliyarajakkapatti
Madurai Dindigul CRIDP Unsatisfied material and QC register
2 -Pudupatti Road at km 0/0 - 5/880 150.00 BC 1 DE 14.06.2017 gradation satisfy the 14.06.2017 14.06.2017
(H) C&M (H) C&M 2016-17 page
including CD Works proper enclosed
gradation.

Reduce the
Copy of
Re-Construction of Minor Bridge at XIII Water contest
Trichy (H) Madurai Retaining Unsatisfied QC register
3 Km 7/2 of Vedasandur - Kovilur 148.50 Finance 1 DE 26.06.2017 to achive the 26.06.2017 26.06.2017
N&RR (H) N&RR wall slump page
Road 2016-17 required
enclosed
slump.
2
1
S No

Total
Name of the Execution

C &M
MADURAI

Dindigul
Division

Dindigul RR
No.of Works inspected

1
2

3
at site
No of CMP / Ready mix site

2
-
inspected
NAME OF QC DIVISION :

1
2

3
Gradation

2
-
Binder content

-
Thickness

-
22 11
width

-
9

22 11 9
Density
Compressive strength /
-

1
Rebound hammer test
-

1
Slump
No of tests conducted

0
-
-

Impact Test
2

2
-

Vicosity
2

Temperature
3
50

Total
-

2 53 1

Gradation
2

2
-

Binder content
-
22

Thickness
11

width
-
9

22 11 9

Density
Compressive strength /
-
ABSTRACT

Rebound hammer test


-
-

Slump
No. of test satisfied

0
-
-

Impact Test
2

2
-

Vicosity
2

Temperature
2
48

Total
-
2

2 50 2

Gradation
0
-
-

Binder content
0
-
-

Thickness
INSPECTION REPORT OF ADE FOR THE MONTH OF JUNE 2017

width
-

0
-

Density
Compressive strength /
0
-
-

Rebound hammer test


-

Slump
0
-
-

Impact Test
No.of test Not satisfied

0
-
-

Vicosity
-

0
-

Temperature
1
2

Total

Remarks
then Rectified
then Rectified
then Rectified

3 Not satisfied
1 Not satisfied
2 Not satisfied
NAME OF C&M DIVISION : DINDIGUL
FORM-1
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF ADE) FOR THE MONTH OF JUNE 2017
NAME OF THE QC DIVISION: MADURAI NAME OF C&M DIVISION : DINDIGUL

Item of work value Remarks


S Date of Name of Exe.Dn As per
Name of work Test location with Name As per Estimate Satisfied /
No inspection Exe.sub.dn test at
of Test (*) JMF Not satisfied
site
NAME OF THE QC SUB DIVISION: DINDIGUL
GSB
Km 5/078.50 (R/S) - 1.00m Thickness 155 mm 156 mm Satisfied

Km 6/256.00 (R/S) - 1.00m Thickness 155 mm 158 mm Satisfied


06.06.2017 WMM
Km 5/078.50 (R/S) - Thickness 250 mm 251 mm Satisfied
1.00m Width 1500 1500 Satisfied
Km 6/256.00 (R/S) - Thickness 250 mm 250 mm Satisfied
1.00m Width 1500 1500 Satisfied
BM

Widening from Intermediate lane to Double Km 4/386.50 (L/S) - 1.10m Thickness 50 mm 51 mm Satisfied
Dindigul (H) lane and Strengthening of Dindigul -
1 C&M / Dindigul Manakkattur Road at km 5/0 - 7/0, Km 5/417.00 (R/S) - 1.20m Thickness 50 mm 50 mm Satisfied
(H) C&M Strengthening at km 4/0 - 5/0 including CD DBM
Works in km 4/0-7/0 (MD 590)
Km 6/288.00 (L/S) - 2.90m Thickness 50 mm 51 mm Satisfied
BC
16.06.2017 Thickness 30 mm 30 mm Satisfied
Km 4/386.50 (L/S) -
1.10m Width 7000 7000 Satisfied
Field Density Min 100 % 100.20% Satisfied
Thickness 30 mm 31 mm Satisfied
Km 5/417.00 (R/S) -
Width 7000 7000 Satisfied
1.20m
Field Density Min 100 % 100.30% Satisfied
Thickness 30 mm 30 mm Satisfied
Km 6/288.00 (L/S) -
2.90m Width 7000 7000 Satisfied
Field Density Min 100 % 100.10% Satisfied
Item of work value Remarks
S Date of Name of Exe.Dn As per
Name of work Test location with Name As per Estimate Satisfied /
No inspection Exe.sub.dn test at
of Test (*) JMF Not satisfied
site
BM
Km 0/282.00 (L/S) - 1.00m Thickness 50 mm 51 mm Satisfied

Km 1/392.00 (R/S) - 0.90m Thickness 50 mm 50 mm Satisfied

Km 2/550.00 (L/S) - 1.00m Thickness 50 mm 52 mm Satisfied

Km 3/726.00 (R/S) - 0.95m Thickness 50 mm 50 mm Satisfied

Km 4/621.00 (L/S) - 1.00m Thickness 50 mm 51 mm Satisfied

Km 5/331.00 (R/S) - 0.95m Thickness 50 mm 50 mm Satisfied


BC
Thickness 30 mm 30 mm Satisfied
Km 0/282.00 (L/S) -
1.00m Width 3750 3750 Satisfied
Dindigul (H) Field Density Min 100 % 100.20% Satisfied
Strengthening of Puliyarajakkapatti -Pudupatti
2 19.06.2017 C&M / Dindigul Thickness 30 mm 32 mm Satisfied
Road at km 0/0 - 5/880 including CD Works
(H) C&M Km 1/392.00 (R/S) -
0.90m Width 3750 3800 Satisfied
Field Density Min 100 % 100.10% Satisfied
Thickness 30 mm 31 mm Satisfied
Km 2/550.00 (L/S) -
1.00m Width 3750 3750 Satisfied
Field Density Min 100 % 100.30% Satisfied
Thickness 30 mm 30 mm Satisfied
Km 3/726.00 (R/S) -
0.95m Width 3750 3750 Satisfied
Field Density Min 100 % 100.20% Satisfied
Thickness 30 mm 31 mm Satisfied
Km 4/621.00 (L/S) -
1.00m Width 3750 3800 Satisfied
Field Density Min 100 % 100.40% Satisfied
Thickness 30 mm 30 mm Satisfied
Km 5/331.00 (R/S) -
0.95m Width 3750 3800 Satisfied
Field Density Min 100 % 100.10% Satisfied
FORM-2
FOR BITUMINOUS WORKS (AT CMP SITE OF ADE) FOR THE MONTH OF JUNE 2017

NAME OF THE QC DIVISION: MADURAI NAME OF C&M DIVISION : DINDIGUL


value Remarks
Name of Item of work
Date of
S No Exe.Dn Name of work CMP location with Name of As per code and As per test Satisfied /
inspection
Exe.sub.dn Test (*) JMF at CMP site Not satisfied

NAME OF QC SUB DIVISION : DINDIGUL

BC

Binder 5.4 % + 0.3 5.18% Satisfied


Widening from Intermediate lane to
Dindigul (H) Double lane and Strengthening of Not As per Not satisfied
Plant at Km 6/2 of Gradation As per JMF
C&M / Dindigul - Manakkattur Road at km 5/0 JMF then Rectified
1 14.06.2017 Thadicombu -
Dindigul (H) - 7/0, Strengthening at km 4/0 - 5/0
Aravakurichi road
C&M including CD Works in km 4/0-7/0 Viscosity Min 350 cP 453.83 cP Satisfied
(MD 590)

Temperature of 150 o C - 165 o C


142 o C Satisfied
Mix + 10 oC

BM

Binder 3.5 % + 0.3 3.24% Satisfied

Dindigul (H) Not As per Not satisfied


Strengthening of Puliyarajakkapatti Plant at Km 6/2 of Gradation As per JMF
C&M / JMF then Rectified
2 11.06.2017 -Pudupatti Road at km 0/0 - 5/880 Thadicombu -
Dindigul (H)
including CD Works Aravakurichi road
C&M Viscosity Min 350 cP 462.00 cP Satisfied

Temperature of 150 o C - 165 o C


` 144 o C Satisfied
Mix + 10 oC
FORM-3
FOR CONCRETE WORKS (FIELD INSPECTION REPORT OF ADE) FOR THE MONTH OF JUNE 2017

NAME OF QC DIVISION : MADURAI NAME OF C&M DIVISION : DINDIGUL

Item of value Remarks


Date of Name of Exe.Dn work with As per
S No Name of work Name of Test (*) As per test Satisfied /
inspection Exe.sub.dn Grade of Codal
concrete at site Not satisfied
Provision
NAME OF QC SUB DIVISION : DINDIGUL
Retaining wall
40mm Metal As per As per
Satisfied
Madurai (H) Gradation JMF JMF
Re-Construction of Minor Bridge at Km 7/2 of
1 26.06.2017 N&RR / Dindigul M15 Not Satisfied
Vedasandur - Kovilur Road Slump 25 31.00
(H) N&RR then Rectified
Compressive 15.41
13 N/mm2 Satisfied
strength (7days) N/mm2
FORM-4
FOR CONCRETE WORKS (AT READY MIX PLANT SITE ) FOR THE MONTH OF JUNE 2017

NAME OF QC DIVISION : MADURAI NAME OF C&M DIVISION : DINDIGUL

value Remarks

Ready
Date of Name of Exe.Dn Grade of
S No Name of work Mix Plant Name of Test (*) As per test
inspection Exe.sub.dn Concrete As per
location at Ready Satisfied /
codal
Mix Plant Not satisfied
Provision
site

-----------------------NIL------------------
QUALITY CONTROL

ASSISTANT DIVISIONAL ENGINEER - FORM 1 TO 4

JUNE 2017
QC DIVISION : MADURAI (H) QC

C&M DIVISION : DINDIGUL (H) C&M

QC SUB DIVISION : DINDIGUL (H) QC