100 TOP MOST POWER PLANT


Engineering – Electrical Brainly - World's La
FREE
Engineering Objective Type
Questions and Answers
Posted on July 20, 2017 by engineer 23 (335,451)
Comments Solve Math Proble
Ads by Google
Answer and Practice Solve
A Questions and Answers Problems
Coal Power Plant

INSTALL
POWER PLANT Engineering MCQS :-
1. The commercial sources of energy are
(a) solar, wind and biomass
(b) fossil fuels, hydropower and nuclear energy
(c) wood, animal wastes and agriculture wastes
(d) none of the above
Ans: b
2. In India largest thermal power station is located at
(a) Kota
(b) Sarni
(c) Chandrapur
(d) Neyveli
Ans: c

4. The percentage O2 by Weight in atmospheric air is


(a) 18%
(b) 23%
(c) 77%
(d) 79%
Ans: b

5. The percentage 02 by volume in atmosphere air is


(a) 21%
(b) 23%
Custo
(c) 77%
(d) 79%
Ans: a
Engineering Questions
6. The proper indication of incomplete combustion is Engineering Questi
(a) high CO content in flue gases at exit 5,461 likes

(b) high CO2 content in flue gases at exit


(c) high temperature of flue gases
Like Page
(d) the smoking exhaust from chimney
Ans: a
Be the first of your friends to like this

7. The main source of production of biogas is


(a) human waste Find us on Google Plus
(b) wet cow dung
Engineering In
(c) wet livestock waste
Follow
(d) all above
Ans: d 747 followers

8. India’s first nuclear power plant was installed at


(a) Tarapore
(b) Kota
(c) Kalpakkam
(d) none of the above
Ans: a

9. In fuel cell, the ______ energy is converted into


electrical energy.
(a) mechanical
(b) chemical
(c) heat
(d) sound
Ans: b

10. Solar thermal power generation can be achieved by


(a) using focusing collector or heliostates
(b) using flat plate collectors
(c) using a solar pond
(d) any of the above system
Ans: d

READ MORE QUESTIONS —–>


PART 1   PART2   PART 3
Ads by Google

A Questions and Answers

Coal Power Plant

← 75 TOP CAO LAB VIVA 50 TOP HEAT TRANSFER LAB


Questions And Answers – CSE VIVA Questions and Answers
Pdf →

23 THOUGHTS ON “100 TOP MOST POWER PLANT


ENGINEERING – ELECTRICAL ENGINEERING OBJECTIVE
TYPE QUESTIONS AND ANSWERS”

jaganath lenka
JUNE 25, 2017 AT 1:26 PM

Вам также может понравиться