(a) Fixed obligation for the preparation of PC Sum 1.00 35,000.00 35,000.00
risk assessments, safe work procedures,
the project H&S file, the H&S plan and any
other H&S matters that the contractor
deems necessary, All protective clothing
(boots, vests, gloves, hardhats etc.)
including handing of records to the
Employer
(b) Fixed obligations for completing and L/Sum 1.00 12,000.00 12,000.00
checking the Project H&S file and handing
it over to the Client on completion of the
works
(c) Time related obligations for updating Month 3.00 6,000.00 18,000.00
and amending the risk assessments, the
safe work procedures, the project H&S
file, the H&S plan and for full compliance
with all H&S matters during construction of
the works under the contract
C 30
KWA-ZULU NATAL
DEPARTMENT OF TRANSPORT
BETTERMENT AND REGRAVELLING: L1059 (2 km)
SECTION 1500
1600 OVERHAUL
C 36
KWA-ZULU NATAL
DEPARTMENT OF TRANSPORT
BETTERMENT AND REGRAVELLING: L1059 (2 km)
SECTION 2100
2100 DRAINAGE
59,520.00
C 32
KWA-ZULU NATAL
DEPARTMENT OF TRANSPORT
BETTERMENT AND REGRAVELLING: L1059 (2 km)
SECTION 2200
22.01 Excavation
22.02 Backfilling:
22.18 Brickwork:
(a) 230 mm thick Inlet catchpits excluding m² L.I 16.00 2,100.00 33,600.00
cover as per SD 0405 (600 &900 dia
pipes)
C 34
KWA-ZULU NATAL
DEPARTMENT OF TRANSPORT
BETTERMENT AND REGRAVELLING: L1059 (2 km)
SECTION 3300
C 36
KWA-ZULU NATAL
DEPARTMENT OF TRANSPORT
BETTERMENT AND REGRAVELLING: L1059 (2 km)
SECTION 5200
5200 GABIONS
52.02 Surface preparation for bedding the m² L.I 15.00 60.00 900.00
gabions
52.03 Gabions:
(i) Length 1m, depth 1m, width 1,5m and m³ L.I 15.00 1,050.00 15,750.00
nominal diameter of mesh wire 2.7mm,
mesh size 80mm x 100mm
The tender rate shall include full
compensation for supplying of all
materials,including rocks fill, wire mesh
cages, galvanizing PVC coating ,tying and
loading transporting and
ooflading,assembling and filling,of cages
and any other work necessary for
constructing the gabion.
52.04 Filter fabric (kaytech grade A4 or similar) m² L.I 36.00 70.00 2,520.00
C 37
KWA-ZULU NATAL
DEPARTMENT OF TRANSPORT
BETTERMENT AND REGRAVELLING: L1059 (2 km)
SECTION 5900
D10.02 Equipment
AMOUNT
SECTION DESCRIPTION
(RANDS)
16 OVERHAUL 146,376.00
C 41
KWA-ZULU NATAL
DEPARTMENT OF TRANSPORT
BETTERMENT AND REGRAVELLING: L1059 (2 km)
SUMMARY OF SECTIONS
SECTION DESCRIPTION
AMOUNT (RANDS)
Subtotal 1,347,193.10
5% CPA 67,359.66
Subtotal 1,414,552.76
TOTAL 1,626,735.67