Вы находитесь на странице: 1из 10

SAP FICO

User manual
Published by Team of
SAP Consultants
at
SAPTOPJOBS
Visit us at www.sap-topjobs.com

Copyright 2009-11@SAPTOPJOBS

All rights reserved. No part of this publication may be reproduced, stored in a retrieval
system, or transmitted in any form, or by any means electronic or mechanical including
photocopying, recording or any information storage and retrieval system without permission
in writing from SAPTOPJOBS
COST CENTER ACCOUNTING
MATERIAL LEDGER
END USER TRAINING DOCUMENTS

CKMM - Change Material Price Determination

Functionality

This transaction code is used to change the Material price determination indicator in the
material master. This indicator is 2 or 3. 2 is activity based and 3 is single and multi level
You may need to change the price determination indicator of a material.

Scenario

You may need sometime to change the price determination indicator of a material. It
is used on ad-hoc basis to change:
• Price control: ‘S’ standard’, ‘V’ moving average.
• Price determination: ‘2’ transaction-based, ‘3’ single-level / multilevel.
.

Requirements

Material Ledger is activated.

Menu Path Accounting → Controlling → Product Cost Controlling →


Actual Costing/Material Ledger → Environment → CKMM -
Material Price Determination
Transaction Code CKMM

1. Double Click on CKMM - Material Price Determination

Page 2 of 10
COST CENTER ACCOUNTING
MATERIAL LEDGER
END USER TRAINING DOCUMENTS
Change Price Determination for Material Ledger

2. Update the following fields:

Field Name Field Description Values


Material Code identifying a product or component ACT-BCD
Plant Code identifying the operational unit of the company 6000
where the material is manufactured and stored
Price control The price control identifies how the material is valuated S
Old price Specifies how the material price determination should 3
determination proceed
New price Specifies how the material price determination should 2
determination proceed
New price control Indicates the price control used to valuate the stock of a S
material.

3. remove tick <checkbox> Only display unchanged materials


.

4. Click the Enter button.

Page 3 of 10
COST CENTER ACCOUNTING
MATERIAL LEDGER
END USER TRAINING DOCUMENTS
Warning

5. Click the Yes Button.

Page 4 of 10
COST CENTER ACCOUNTING
MATERIAL LEDGER
END USER TRAINING DOCUMENTS
Change Price Determination for Material Ledger

6. Click Execute .

Page 5 of 10
COST CENTER ACCOUNTING
MATERIAL LEDGER
END USER TRAINING DOCUMENTS
Warning

7. Click the Yes Button.

Page 6 of 10
COST CENTER ACCOUNTING
MATERIAL LEDGER
END USER TRAINING DOCUMENTS
Change Price Determination for Material Ledger

8. Click Back .

9. Click <checkbox> Test run .

10. Click Execute .

Page 7 of 10
COST CENTER ACCOUNTING
MATERIAL LEDGER
END USER TRAINING DOCUMENTS
Warning

11. Click the Yes Button.

Page 8 of 10
COST CENTER ACCOUNTING
MATERIAL LEDGER
END USER TRAINING DOCUMENTS
Change price determination for material ledger

12. The system displays a status log of the transaction.

13. Click Back to exit.

Page 9 of 10
COST CENTER ACCOUNTING
MATERIAL LEDGER
END USER TRAINING DOCUMENTS

SAP FICO
User manual
Published by Team of
SAP Consultants
at
SAPTOPJOBS
Visit us at www.sap-topjobs.com

Copyright 2009-11@SAPTOPJOBS

All rights reserved. No part of this publication may be reproduced, stored in a retrieval
system, or transmitted in any form, or by any means electronic or mechanical including
photocopying, recording or any information storage and retrieval system without permission
in writing from SAPTOPJOBS

Page 10 of 10

Вам также может понравиться