Вы находитесь на странице: 1из 4

SOJITZ - L&T CONSORTIUM

CIVIL,BUILDING AND TRACK WORKS,CONTRACT COMBINED PACKAGE


CTP-1 & CTP-2
Format No.
REWARI - IQBALGARH (Phase 1)
SLT/QMS/B/LAB - 07
Project :Civil, Building & Track work for 626 Km Double Railway line ( Rewari - Iqbalgarh)
Client :DFCCIL ( SPV set up under Ministry of Railway)
Engineer :
Contractor :SOJITZ - L&T Consortium

CALIFORNIA BEARING RATIO TEST


(As per IS 2720, Part-16)

Laboratory job no. RPFI No


Type of material Date of sampling
Source Sampled by
Location/Ch. Date of testing
Proposed use Tested by

MOISTURE CONTENT AND UNIT WEIGHT OF TEST SAMPLES

S.No DESCRIPTION MOULD NO. MOULD NO. MOULD NO.

A. No.of Layers

B. No.of Blows per layer

C. Condition of sample (SOAKING) Before After Before After Before After

D. Weight of Mould (gm)

E. Weight of wet Sample + Mould (gm)

F. Weight of Wet Sample (E-D) (gm)

G. Volume of Mould/Sample (cc)

H. Wet Density of Soil (F/G) (gm/cc)

J. Moisture Determination:

K. Container No.

L. Weight of Container (gm)

M. Weight of Wet Sample + Container (gm)

N. Weight of Dry Sample + Container (gm)

P. Weight of Water (M-N) (gm)

Q. Weight of Dry Sample (N-L) (gm)

R. Water Content [(P/Q)X100] (%)

S. Dry Density {H/[1+(R/100)]} (gm/cc)

LOAD PENETRATION TEST DATA

Penetration Proving ring Corrected load Proving ring Corrected Proving ring Corrected
GENERAL INFORMATION
(mm) reading (kg) reading load (kg) reading load (kg)

0.0
Type of compaction used : Static/Dynamic
0.5

1.0
Period of soaking: days
1.5

2.0
Wt. Of surcharge used (kg) :
2.5

Proving ring capacity (KN) : 4.0

5.0
Proving ring Identification :
7.5

10.0
Proving ring factor :
12.5

Corrected unit load from graph (kg) for 2.5mm

Corrected unit load from graph (kg) for 5.0mm

CBR at 2.5mm (%)

CBR at 5.0mm (%)

CBR reported (%)

For SLT Rep For Pmc Rep For WDFC Rep

Name : Name : Name :

Signature : Signature : Signature :

Date: Date: Date:


SOJITZ-L&T CONSORTIUM
CIVIL,BUILDING AND TRACK WORKS,CONTRACT COMBINED PACKAGE
CTP-1 & CTP-2
Format No.
REWARI-IQBALGARN (Phase-1)
SLT/QMS/B/LAB
- 07
Project: :Civil, Building & Track work for 626 Km Double Railway line ( Rewari - Iqbalgarh)
Client: :DFCCIL ( SPV set up under Ministry of Railway)
Engineer: NKC
Contractor: :SOJITZ - L&T Consortium
CALIFORNIA BEARING RATIO TEST
(As per IS 2720, Part-16)(Graph of Load v/s Penetration)
Laboratory job no. RPFI No
Type of material Date of sampling
Source Sampled by
Location Date of testing
Proposed use Tested by

S.No 100 DESCRIPTION MOULD NO. 1 MOULD NO.2 MOULD NO. 3


A Condition of sample while SOAKING BEFORE AFTER BEFORE AFTER BEFORE AFTER
B Wt.of mould(gm) 6243 6243 6455 6455 6327 6327
C Wt.of wet soil+mould(gm) 10744 10928 11275 11353 11207 11267
D Wt.of wet soil(E-D)(gm) 4501 4685 4820 4898 4880 4940
E Volume of mould/sample (cc) 2250 2250 2250 2250 2250 2250
F Wet density (F/G)(gm/cc) 2.000 2.082 2.142 2.177 2.169 2.196
G Moisture determination
H Container no. 14 1 15 3 16 4.000
Load(KN)

I Wt.of container(gm) 29.5 26 28 31 30 25.500


J Wt.of wet soil+cont.(gm) 129 133.5 162 135.5 101.5 136.500
K Wt.of dry soil+cont.(gm) 119.5 120.5 150 124.5 95 126.000
L Wt.of water(M-N)(gm) 9.5 13 12 11 6.5 10.500
M Wt.of dry soil(N-L)(gm) 90 94.5 122 93.5 65 100.500
N Water content[(P/Q)x100](%) 10.56 13.76 9.84 11.76 10.00 10.448
O Dry density{H/[1+(R/100)]}(gm/cc) 1.809 1.830 1.950 1.948 1.972 1.988
P Level of Compaction (%) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

LOAD - PENETRATION TEST DATA ACTOR OF PROVING RING:


Blows-10 Blows-30 Blows-65
0 Reading Reading Reading
GENERAL INFORMATION
0 1 Penetrati
2 Proving
3 4with 5 Proving
6 7 with 8 Proving
9 10with 11 12 13 14
ring ring ring Remarks
on (mm) calibratio calibratio calibratio
reading reading
Penetration(mm) reading
n factor n factor n factor

100

Period of soaking: 2 13 91.2 12 84.1 26 182.3


4 days 2.5 18 126.2 17 119.2 40 280.5
Wt.of surcharge 3 22 154.3 23 161.3 55 385.7
used (kg): 5 4 30 210.4 35 245.4 86 603.0
Proving ring 5 37 259.4 58 406.7 122 855.5
capacity: 25
7.5 57 399.7 95 666.1 181 1269.2
KN
Least count of
Load(KN)

10 79 553.9 160 1121.9 241 1689.9


proving dial guage:
Corrected unit load 12.5 97 680.2 224 1570.7 289 2026.5
0.002MM
from graph(kg)
Corrected for
unit load 120 120 205
2.5mm
from graph(kg) for 260 360 450
5.0mm
CBR at 2.5mm (%) 8.8 8.8 15.0
CBR at 5.0mm(%) 12.7 17.5 21.9

CBR reported (%) 17%

Remarks
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Penetration(mm)

For SLT Rep For PMC Rep For WDFC Rep


Name: Name : Name :
Sign : Sign : Sign :
Date: Date: Date:
SOJITZ-L&T CONSORTIUM
CIVIL,BUILDING AND TRACK WORKS,CONTRACT COMBINED PACKAGE
CTP-1 & CTP-2
Format No.
REWARI-IQBALGARN (Phase-1)
SLT/QMS/B/LAB
- 07
Project: :Civil, Building & Track work for 626 Km Double Railway line ( Rewari - Iqbalgarh)
Client: :DFCCIL ( SPV set up under Ministry of Railway)
Engineer: NKC
Contractor: :SOJITZ - L&T Consortium
CALIFORNIA BEARING RATIO TEST
(As per IS 2720, Part-16)(Graph of Load v/s Penetration)
Laboratory job no. RPFI No
Type of material Date of sampling
Source Sampled by
Location Date of testing
Proposed use Tested by

100 MOISTURE CONTENT AND UNIT WEIGHT OF TEST SAMPLES


MDD (gm/cc)- 0 OMC (%) 0

S.No DESCRIPTION MOULD NO. 1 MOULD NO.2 MOULD NO. 3


A Condition of sample while SOAKING BEFORE AFTER BEFORE AFTER BEFORE AFTER
B Wt.of mould(gm) 6243 6243 6455 6455 6327 6327
C Wt.of wet soil+mould(gm) 10744 10928 11275 11353 11207 11267
D Wt.of wet soil(E-D)(gm) 4501 4685 4820 4898 4880 4940
E Volume of mould/sample (cc) 2250 2250 2250 2250 2250 2250
F Wet density (F/G)(gm/cc) 2.000 2.082 2.142 2.177 2.169 2.196
Load(KN)

G Moisture determination
H Container no. 14 1 15 3 16 4.000
I Wt.of container(gm) 29.5 26 28 31 30 25.500
J Wt.of wet soil+cont.(gm) 129 133.5 162 135.5 101.5 136.500
K Wt.of dry soil+cont.(gm) 119.5 120.5 150 124.5 95 126.000
L Wt.of water(M-N)(gm) 9.5 13 12 11 6.5 10.500
M Wt.of dry soil(N-L)(gm) 90 94.5 122 93.5 65 100.500
N Water content[(P/Q)x100](%) 10.56 13.76 9.84 11.76 10.00 10.448
O0 Dry density{H/[1+(R/100)]}(gm/cc) 1.809 1.830 1.950 1.948 1.972 1.988
P 0 Level1 of Compaction
2 3 (%) 4 5 6 #DIV/0!7 #DIV/0!
8 9 #DIV/0!10 #DIV/0!
11 #DIV/0! 13
12 #DIV/0!
14
LOAD - PENETRATION TEST DATA Penetration(mm) ACTOR OF PROVING RING:

For SLT Rep For PMC Rep For WDFCC Rep


Name: Name : Name :
Sign : Sign : Sign :
Date: Date: Date: