Project: :Civil, Building & Track work for 626 Km Double Railway line ( Rewari - Iqbalgarh)
Engineer: NKC
Date of Testing:
Ø= _______
Mould + Sample weight : _____g
Density of soil : rb=2.02 g/cc = 19.82 kN/m3 Moisture content of Sample : ____ %
e =______
Bearing Capacity Factors : Nc' = _____, Nq' = _____ & Nr'= _____
Sr = {1-(0.4*B/L)} = ____
Net Ultimate Bearing Capacity : Qnu= c' Nc'Scdc + r D (Nq'-1)Sqdq + 0.5 r B Nr'Srdr
= _____kN/Sq.m
Project: :Civil, Building & Track work for 626 Km Double Railway line ( Rewari - Iqbalgarh)
Engineer: NKC
1.5 34.20
2.0 33.60
4.5 30.60
4.0
5.0 30.00
2.0
5.5 29.40
0.0
Normal Stress
1.0 (Kg/cm2)
6.0 28.80 0.4 0.6 0.8 1.2 1.4 1.6
c= Ø=
For SLT Rep For PMC For WDFCC Rep