ARAMCO OVERSEAS COMPANY B.V.

& SUMITOMO CHEMICAL CO., LTD.

Project Management Services for Rabigh Phase II Petrochemical Project

ITB PACKAGE: Volume III General Book


As of 31-May-2012

Package Name Link to INDEX


Volume III: General Book ClickHere
Index of ITB PACKAGE Volume III: General Book

Issued
Not Issued to
Document Number Latest Rev. Document Title PDF File Remarks Original ITB Addendum-1 Addendum-2 Addendum-3 Addendum-4
Bidders
No.

1. General

1.1 General - Notes

S-PM-G000-1140-7001 4 GENERAL NOTES Click 2 3 4

S-PM-G000-1140-7002 N/A GENERAL NOTES (SCOPE CHANGES) N/A N/A 0

2. Project Design Basis

2.1 General - Project Design

2.1.1 Project Design Data

S-PM-G000-1131-0003 6 2D CAD REGULATIONS FOR CONTRACTOR Click 6

S-PM-G000-1131-0007 7 WAIVING AND CLARIFICATION PROCEDURE Click 7

S-PM-G000-1131-0014 2 3D MODELING PROCEDURE AND REVIEW REQUIREMENTS TO CONTRACTOR Click 2

S-PM-G000-1133-0001 4 REQUIREMENT FOR SCHEDULING, PROGRESS CONTROL AND REPORTING (EPC) Click 3 4

S-PM-G000-1136-0002 3 TECHNICAL DOCUMENT CONTROL REQUIREMENT FOR EPC CONTRACTOR Click 2 3

S-PM-G000-1140-0001 8 DOCUMENT NUMBERING PROCEDURE Click 8

S-PM-G000-1140-0003 8 EQUIPMENT AND INSTRUMENT NUMBERING PROCEDURE Click 8

S-PM-G000-1140-0004 5 TITLE BLOCK REQUIREMENTS FOR TECHNICAL DOCUMENTS Click 4 5

S-PM-G000-1140-0008 2 COORDINATION PROCEDURE TO EPC CONTRACTOR Click 2

S-PM-G000-1140-0503 5 PROCEDURE FOR PROJECT RECORD BOOKS Click 3 4 5

S-PM-G000-1140-2001 4 REQUIREMENTS FOR PLANT HANDOVER Click 4 5

S-PM-G000-114Z-0003 5 HYDROSTATIC TESTING FLUIDS AND LAY-UP PROCEDURES Click 5

S-PM-G000-1222-0001 12 BASIC ENGINEERING DESIGN DATA(BEDD) Click 10 11 12

S-PM-G000-1222-0201 9 BASIC DESIGN REQUIREMENTS Click 7 8 9

S-PM-G000-1410-0002 9 RECOMMENDED VENDORS LIST Click 7 8 9

2.1.2 Design Philosophy

D-PM-G000-1225-0001 12 OVERALL GENERAL PLOT PLAN Click 11 12 13

S-PM-G000-1222-0301 9 PREPARATION OF P&IDS Click 8 9

S-PM-G000-1222-0602 9 ISOLATION PHILOSOPHY Click 6 7 8 9

S-PM-G000-1222-0603 8 SPARING PHILOSOPHY Click 8

S-PM-G000-1222-0604 6 PROCESS CONTROL & OPERATION PHILOSOPHY Click 6

S-PM-G000-1222-0605 5 EMERGENCY SHUTDOWN PHILOSOPHY Click 4 5

S-PM-G000-1222-0606 5 EMERGENCY DEPRESSURING PHILOSOPHY Click 5

S-PM-G000-1222-0607 5 OVERPRESSURE PROTECTION PHILOSOPHY Click 5

S-PM-G000-1222-0608 8 DRAINAGE PHILOSOPHY Click 4 5 6 7&8

S-PM-G000-1222-0609 6 FLARE DESIGN PHILOSOPHY Click 6

S-PM-G000-1222-0610 6 COMPRESSOR CONTROL PHILOSOPHY Click 6

S-PM-G000-1222-0611 5 ADVANCED PROCESS CONTROL PHILOSOPHY Click 5

S-PM-G000-1240-0001 7 ENVIRONMENTAL DESIGN BASIS Click 6 7

S-PM-G000-1240-0002 7 HSE DESIGN PHILOSOPHY Click 5 6 7

2.1.3 Discipline Design basis

2.1.3.1 Civil, Building and Steel Structure

S-PM-G000-1310-0001 9 GENERAL SPECIFICATION FOR CIVIL AND STRUCTURAL DESIGN Click 7 8 9

S-PM-G000-1340-0001 8 GENERAL SPECIFICATION FOR BUILDING DESIGN Click 7 8

S-PM-G000-1340-0002 7 GENERAL SPECIFICATION FOR HVAC DESIGN REQUIREMENT Click 6 7

S-PM-G000-1340-0003 9 GENERAL SPECIFICATION FOR BUILDING ELECTRICAL WORK Click 7 8 9

S-PM-G000-1340-0004 6 GENERAL SPECIFICATION FOR BUILDING FIRE PROTECTION SYSTEM Click 6

S-PM-G000-1340-0005 7 GENERAL SPECIFICATION FOR PRE-ENGINEERED BUILDING Click 6 7

S-FE-G000-1340-0001 2 HVAC BASIC FLOW DIAGRAMS FOR BUILDINGS Click 2

2.1.3.2 Mechanical

S-PM-G000-1351-0001 9 GENERAL SPECIFICATION FOR PRESSURE VESSEL Click 7 8 9

S-PM-G000-1351-0002 6 GENERAL SPECIFICATION FOR CLAD VESSEL AND HEAT EXCHANGER Click 6

S-PM-G000-1352-0001 7 GENERAL SPECIFICATION FOR TRAY AND PACKING Click 7

S-PM-G000-1353-0001 9 GENERAL SPECIFICATION FOR SHELL & TUBE HEAT EXCHANGER Click 7 8 9

S-PM-G000-1353-0101 9 GENERAL SPECIFICATION FOR AIR COOLED HEAT EXCHANGER Click 7 8 9

S-PM-G000-1353-0201 9 GENERAL SPECIFICATION FOR SPECIAL HEAT EXCHANGER Click 7 8 9

S-PM-G000-1354-0001 6 GENERAL SPECIFICATION FOR ATMOSPHERIC STORAGE TANKS Click 5 6 7

S-PM-G000-1354-0101 4 GENERAL SPECIFICATION FOR PRESSURE STORAGE SPHERES Click 4

S-PM-G000-1354-0201 5 GENERAL SPECIFICATION FOR REFRIGERATED STORAGE TANKS Click 4 5

S-PM-G000-1356-0001 4 GENERAL SPECIFICATION FOR FIRED HEATER Click 4

S-PM-G000-1357-0001 5 GENERAL SPECIFICATION FOR FLARE SYSTEM Click 5

S-PM-G000-1358-0001 6 GENERAL SPECIFICATION FOR ROTATING EQUIPMENT Click 5 6

S-PM-G000-1358-0101 1 GENERAL SPECIFICATION FOR API CENTRIFUGAL PUMPS Click 1

S-PM-G000-1358-0102 1 GENERAL SPECIFICATION FOR GENERAL PURPOSE CENTRIFUGAL PUMPS Click 1

S-PM-G000-1358-0103 1 GENERAL SPECIFICATION FOR POSITIVE DISPLACEMENT PUMPS - CONTROLLED VOLUME Click 1

S-PM-G000-1358-0104 1 GENERAL SPECIFICATION FOR SHAFT SEALING SYSTEMS FOR CENTRIFUGAL AND ROTARY PUMPS Click 1

S-PM-G000-1358-0201 1 GENERAL SPECIFICATION FOR CENTRIFUGAL COMPRESSORS Click 1

S-PM-G000-1358-0202 1 GENERAL SPECIFICATION FOR RECIPROCATING COMPRESSORS Click 1

S-PM-G000-1358-0401 1 GENERAL SPECIFICATION FOR SPECIAL PURPOSE STEAM TURBINES Click 1

S-PM-G000-1358-0501 1 GENERAL SPECIFICATION FOR LUBRICATION, SHAFT SEALING AND CONTROL OIL SYSTEMS Click 1

S-PM-G000-1358-0502 1 GENERAL SPECIFICATION FOR SPECIAL PURPOSE GEAR UNITS Click 1

S-PM-G000-135A-0001 5 GENERAL SPECIFICATION FOR PACKAGE EQUIPMENT Click 5

S-PM-G000-1360-0001 6 GENERAL SPECIFICATION FOR PIPING Click 5 6

2
Index of ITB PACKAGE Volume III: General Book

Issued
Not Issued to
Document Number Latest Rev. Document Title PDF File Remarks Original ITB Addendum-1 Addendum-2 Addendum-3 Addendum-4
Bidders
No.

S-PM-G000-1360-0003 9 SPECIFICATION FOR ACCESS, EGRESS, AND MATERIAL HANDLING FOR PLANT FACILITIES Click 7 8&9

S-PM-G000-1360-0004 11 PIPING MATERIAL SPECIFICATION Click 9 10 11

S-PM-G000-1360-0008 6 GENERAL SPECIFICATION FOR PIPING FLEXIBILITY ANALYSIS Click 6

2.1.3.3 Instrumentation and Control

S-PM-G000-1370-0001 9 GENERAL SPECIFICATION FOR INSTRUMENTATION Click 8 9

S-PM-G000-1370-0003 6 SPECIFICATION FOR FOUNDATION FIELDBUS SYSTEM Click 5 6

S-PM-G000-1370-0004 5 SPECIFICATION FOR PROTECTION OF INSTRUMENTS Click 5

S-PM-G000-1370-0005 6 SPECIFICATION FOR INSTRUMENT/ELECTRICAL INTERFACE Click 6

S-PM-G000-1370-0006 3 SPECIFICATION FOR SIL IMPLEMENTATION Click 3

S-PM-G000-1370-0101 4 SPECIFICATION FOR SPI (SMARTPLANT INSTRUMENTATION) Click 4

S-PM-G000-1370-0302 3 SPLIT OF WORK FOR INSTRUMENTATION AND CONTROL DURING EPC Click 3

S-PM-G000-1371-0001 5 SPECIFICATION FOR PROCESS CONTROL SYSTEM Click 5

S-PM-G000-1371-0002 6 SPECIFICATION FOR SAFETY INSTRUMENTED SYSTEM (SIS) Click 6

S-PM-G000-1371-0003 5 SPECIFICATION FOR VIBRATION/CONDITION MONITORING SYSTEM (VMS/FFVMS/CMS) Click 5

S-PM-G000-1371-0005 5 SPECIFICATION FOR COMPRESSOR/TURBINE CONTROL SYSTEM Click 5

S-PM-G000-1371-0006 5 SPECIFICATION FOR SMART ZV MONITORING SYSTEM (SZVMS) Click 5

S-PM-G000-1371-0007 6 SPECIFICATION FOR TANK DATA ACQUISITION SYSTEM (TDAS) Click 6

S-PM-G000-1371-0008 5 SPECIFICATION FOR CONTROL AND MARSHALLING CABINETS Click 5

S-PM-G000-1371-0009 2 SPECIFICATION FOR ALARM MANAGEMENT SYSTEM (ALMS) Click 2

S-PM-G000-1371-0101 6 SPECIFICATION FOR PROCESS CONTROL SYSTEM (PCS) VENDOR SERVICES Click 6

S-PM-G000-1371-0102 5 SPECIFICATION FOR PCS SCOPE OF WORK Click 5

S-PM-G000-1371-0103 2 GUIDELINES FOR PROCESS CONTROL SYSTEM (PCS) CONFIGURATION Click 2

S-PM-G000-1372-0002 3 SPECIFICATION FOR OPERATOR TRAINING SIMULATOR (OTS) Click 3

S-PM-G000-1375-0001 5 SPECIFICATION FOR ANALYSERS, ANALYSER SHELTERS AND LOCAL ANALYSER PANELS Click 5

S-PM-G000-1375-0002 5 SPECIFICATION FOR ANALYSER SAMPLING SYSTEM Click 5

S-PM-G000-1377-0001 4 SPECIFICATION FOR FLOW METERING SYSTEM Click 3 4

S-PM-G000-1378-0001 4 SPECIFICATION FOR INSTRUMENT PIPING MATERIAL Click 4

S-PM-G000-1378-0002 4 SPECIFICATION FOR INSTRUMENT CABLE Click 4

S-PM-G000-1378-0003 4 SPECIFICATION FOR INSTRUMENT INSTALLATION Click 4

2.1.3.4 Electrical

S-PM-G000-1380-0001 13 GENERAL SPECIFICATION FOR ELECTRICAL DESIGN Click 11 12 13

S-PM-G000-1380-0002 7 SPECIFICATION FOR AUXILIARY ELECTRICAL SYSTEMS FOR PACKAGED EQUIPMENT Click 7

S-PM-G000-1381-0001 7 SPECIFICATION FOR DIESEL GENERATOR SETS Click 7

S-PM-G000-1381-0002 9 SPECIFICATION FOR HIGH VOLTAGE SWITCHGEAR AND CONTROLGEAR Click 9

S-PM-G000-1381-0003 9 SPECIFICATION FOR LOW VOLTAGE SWITCHGEAR AND CONTROLGEAR Click 8 9

S-PM-G000-1381-0004 9 SPECIFICATION FOR UPS SYSTEM Click 9

S-PM-G000-1381-0005 7 SPECIFICATION FOR DC SYSTEM Click 7

S-PM-G000-1381-0006 7 SPECIFICATION FOR POWER MONITORING SYSTEM (PMS) & LOAD SHEDDING SYSTEM (LSS) Click 7

S-PM-G000-1381-0007 8 SPECIFICATION FOR POWER TRANSFORMERS Click 8

S-PM-G000-1381-0008 8 SPECIFICATION FOR 480V VARIABLE SPEED DRIVES Click 8

S-PM-G000-1382-0001 8 SPECIFICATION FOR INDUCTION AND SYNCHRONOUS MOTORS Click 8

S-PM-G000-1386-0001 12 GENERAL SPECIFICATION FOR TELECOMMUNICATIONS SYSTEMS Click 10 11 12

S-FE-C300-1386-0001 10 FUNCTIONAL SPECIFICATION DOCUMENT FOR TELEPHONE AND CABLING SYSTEM Click 7 8&9 10

S-FE-C300-1386-0002 7 FUNCTIONAL SPECIFICATION DOCUMENT FOR DATA NETWORK SYSTEM Click 7

FUNCTIONAL SPECIFICATION DOCUMENT FOR PUBLIC ADDRESS, GENERAL ALARM & IN-PLANT
S-FE-C300-1386-0003 10 Click 8 9 10
PAGING SYSTEM

S-FE-C300-1386-0005 7 FUNCTIONAL SPECIFICATION DOCUMENT FOR CLOSED CIRCUIT TELEVISION SYSTEM (CCTV) Click 7

S-PM-G000-1387-0001 7 SPECIFICATION FOR CATHODIC PROTECTION Click 6 7

2.1.3.5 Others

S-PM-G000-1240-0010 3 HSE EPC EXECUTION PLAN (ENGINEERING) Click 3

S-PM-G000-1241-0001 6 GENERAL SPECIFICATION FOR FIRE PROTECTION SYSTEM Click 5 6

S-PM-G000-1241-0002 7 GENERAL SPECIFICATION FOR FIRE & GAS ALARM SYSTEM Click 5 6 7

S-PM-G000-1241-0101 9 GENERAL SPECIFICATION FOR PASSIVE FIRE PROTECTION Click 8 9

S-PM-G000-1244-0001 3 SPECIFICATION FOR PLANT NOISE CONTROL Click 3

S-PM-G000-1244-0002 4 SPECIFICATION FOR EQUIPMENT NOISE LIMITATION Click 4

S-PM-G000-1244-0003 4 SPECIFICATION FOR ACOUSTIC INSULATION Click 4

S-PM-G000-1390-0001 5 SPECIFICATION FOR HOT INSULATION Click 5

S-PM-G000-1390-0002 4 SPECIFICATION FOR COLD INSULATION Click 4

S-PM-G000-13A0-0001 9 GENERAL SPECIFICATION FOR EXTERNAL PROTECTIVE COATINGS Click 7 8&9

S-PM-G000-13A0-0002 6 GENERAL SPECIFICATION FOR LETTERING AND COLOR CODING Click 6

GENERAL SPECIFICATION FOR INTERNAL COATING OF FIELD ERECTED ABOVEGROUND STORAGE


S-PM-G000-13A0-0003 6 Click 6
TANKS

2.1.4 Drawings and Symbology

2.1.4.1 Process

D-PM-G000-1223-0301 4 PROCESS FLOW DRAWING COMMON SYMBOLOGY SHEET Click 4

D-PM-G000-1225-0301 5 P&ID GENERAL NOTES & INSTRUMENT SYMBOLOGY SHEET Click 5

D-PM-G000-1225-0302 5 P&ID MECHANICAL SYMBOLOGY SHEET Click 5 6

D-PM-G000-1225-0303 6 P&ID TYPICAL DETAILS AND NOTES(1/2) Click 5 6

D-PM-G000-1225-0304 6 P&ID TYPICAL DETAILS AND NOTE (2/2) COMMON Click 6

D-PM-G000-1225-0305 7 P&ID INSTRUMENT DETAILS(1/2) Click 6 7

D-PM-G000-1225-0306 4 P&ID INSTRUMENT DETAILS(2/2) Click 4

D-PM-G000-1225-0307 4 P&ID SAMPLING DETAILS COMMON Click 4

3
Index of ITB PACKAGE Volume III: General Book

Issued
Not Issued to
Document Number Latest Rev. Document Title PDF File Remarks Original ITB Addendum-1 Addendum-2 Addendum-3 Addendum-4
Bidders
No.

D-PM-G000-1225-0308 6 P&ID ABBREVIATIONS LIST COMMON Click 6

2.1.4.2 Civil, Building and Steel Structure

D-PM-G000-1310-0001 6 GENERAL NOTES FOR CIVIL WORKS Click 6

D-PM-G000-1315-0001 6 STANDARD DRAWING FOR DIRECT BURIED CABLE TRENCH Click 6

D-PM-G000-1316-0001 6 STANDARD DRAWING FOR DRAIN FUNNEL, VENT PIPE, CLEAN OUT AND TRENCHING Click 6

D-PM-G000-1316-0002 6 STANDARD DRAWING ISOMETRIC LAYOUT FOR RTR PIPE (FOR OWS AND SYS LINES) 1/2 Click 6

D-PM-G000-1316-0003 6 STANDARD DRAWING ISOMETRIC LAYOUT FOR RTR PIPE (FOR OWS AND SYS LINES) 2/2 Click 6

D-PM-G000-1317-0001 7 STANDARD DRAWING FOR ASPHALT ROAD AND PAVING Click 6 7

D-PM-G000-1317-0002 6 STANDARD DRAWING FOR GRAVEL AND CONCRETE PAVING Click 6

D-PM-G000-1317-0010 7 OVERALL CONCEPTUAL PLAN FOR ELEVATIONS OF ROADS AND FINISHED AREA GRADES Click 7 8

D-PM-G000-1317-0011 5 OVERALL CONCEPTUAL PLAN FOR ROADS Click 3 4 5

D-PM-G000-1320-0001 6 GENERAL NOTES FOR CONCRETE WORK Click 6

D-PM-G000-1320-0002 6 STANDARD DRAWING FOR REBAR ARRANGEMENT Click 6

D-PM-G000-1324-0001 6 STANDARD DRAWING FOR DUCT BANK Click 6

D-PM-G000-1330-0001 6 GENERAL NOTES FOR STEEL WORK Click 6

D-PM-G000-1330-0002 6 STANDARD DETAILS FOR HANDRAIL (1/2) Click 6

D-PM-G000-1330-0003 5 STANDARD DETAILS FOR HANDRAIL (2/2) Click 5

D-PM-G000-1330-0004 5 STANDARD DETAILS FOR LADDER (1/3) Click 5

D-PM-G000-1330-0005 5 STANDARD DETAILS FOR LADDER (2/3) Click 5

D-PM-G000-1330-0006 6 STANDARD DETAILS FOR LADDER (3/3) Click 6

D-PM-G000-1330-0007 6 STANDARD DETAILS FOR STAIRWAY (1/3) Click 6

D-PM-G000-1330-0008 6 STANDARD DETAILS FOR STAIRWAY (2/3) Click 6

D-PM-G000-1330-0009 5 STANDARD DETAILS FOR STAIRWAY (3/3) Click 5

D-PM-G000-1330-0010 5 STANDARD DETAILS FOR GRATING FLOOR Click 5

D-PM-G000-1330-0011 5 STANDARD DETAILS FOR CONCRETE FIRE PROOFING Click 5

D-PM-G000-1330-0012 5 TYPICAL EXTENTS OF FIREPROOFING FOR PIPERACKS AND PIPE SUPPORTS Click 5

D-PM-G000-1330-0013 6 TYPICAL EXTENTS OF FIREPROOFING FOR EQUIPMENT STRUCTURES Click 6

D-PM-G000-134A-0001 2 TYPICAL SECTION OF ELEVATED SUBSTATION Click 1 2

D-PM-G000-134A-0002 1 TYPICAL SECTION OF GRADE MOUNNTED SUBSTATION Click 1

D-PM-G000-134D-0001 2 TYPICAL SECTION OF PROCESS INTERFACE BUILDING Click 1 2

D-PM-G000-134E-0001 1 TYPICAL SECTION OF PRODUCT WAREHOUSE Click 1

2.1.4.3 Mechanical

D-PM-G000-1351-0001 6 STANDARD DRAWING NAME PLATE FOR PRESSURE VESSEL Click 6

D-PM-G000-1351-0002 6 STANDARD DRAWING SKIRT AND BASE PLATE FOR VERTICAL VESSEL Click 6

D-PM-G000-1351-0003 5 STANDARD DRAWING VESSEL HORIZONTAL SADDLE DETAILS Click 5

D-PM-G000-1351-0004 6 STANDARD DRAWING FIREPROOFING TIE WIRE NUT Click 6

D-PM-G000-1351-0005 5 STANDARD DRAWING TOLERANCE FOR COLUMN AND DRUM Click 5

D-PM-G000-1351-0006 5 STANDARD DRAWING TOLERANCE FOR INSTALLATION OF TRAY SUPPORTS Click 5

D-PM-G000-1351-0007 5 STANDARD DRAWING INTERNAL LADDERS Click 5

D-PM-G000-1353-0001 6 STANDARD DRAWING NAME PLATE FOR HEAT EXCHANGER Click 6

D-PM-G000-1353-0002 6 STANDARD DRAWING NAME PLATE FOR AIR COOLED HEAT EXCHANGER Click 6

D-PM-G000-1353-0003 5 STANDARD DRAWING SHELL & TUBE HEAT EXCHANGER SADDLE DETAILS Click 5

D-PM-G000-1353-0004 5 STANDARD DRAWING LIFTING LUG FOR HEAT EXCHANGER COMPONENT Click 5

2.1.4.4 Instrumentation and Control

D-PM-G000-1371-0001 7 PCS NETWORK OVERALL ROUTING Click 7 8

D-PM-G000-1371-0002 6 PCS OVERALL CONTROL BLOCK DIAGRAM Click 6 7

D-PM-G000-1378-0001 4 TYPICAL DRAWINGS FOR INSTRUMENT MOUNTING Click 4

2.1.4.5 Electrical

D-PM-G000-1381-0001 6 NOTES AND SYMBOLOGY FOR ELECTRICAL DRAWINGS Click 6

D-PM-G000-1381-0002 6 TYPICAL PROTECTION & METERING 110KV/34.5KV ONE LINE DIAGRAM SHEET 1 OF 2 Click 6

D-PM-G000-1381-0003 6 TYPICAL PROTECTION & METERING 110KV/34.5KV ONE LINE DIAGRAM SHEET 2 OF 2 Click 6

D-PM-G000-1381-0004 6 TYPICAL PROTECTION & METERING 34.5KV/13.8KV & 34.5KV/4.16KV ONE LINE DIAGRAM Click 6

D-PM-G000-1381-0005 7 TYPICAL PROTECTION & METERING 13.8KV/4.16KV ONE LINE DIAGRAM Click 6 7

D-PM-G000-1381-0006 7 TYPICAL PROTECTION & METERING 13.8KV/0.48KV ONE LINE DIAGRAM Click 6 7

D-PM-G000-1381-0007 7 TYPICAL PROTECTION & METERING 4.16KV/0.48KV ONE LINE DIAGRAM Click 6 7

D-PM-G000-1381-0008 6 480V TYPICAL FEEDERS ONE LINE DIAGRAM Click 6

D-PM-G000-1381-0009 7 ELECTRICAL ONE LINE DIAGRAM 208V/120V AC UPS SYSTEM TYPICAL ARRANGEMENT (1 OF 2) Click 7

D-PM-G000-1381-0010 6 ELECTRICAL ONE LINE DIAGRAM 125V DC TRIP/CLOSE SUPPLIES TYPICAL ARRANGEMENT Click 6

D-PM-G000-1381-0011 4 POWER MONITOING SYSTEM BLOCK DIAGRAM Click 4

D-PM-G000-1381-0012 2 ELECTRICAL ONE LINE DIAGRAM 208V/120V AC UPS SYSTEM TYPICAL ARRANGEMENT (2 OF 2) Click 2

D-PM-G000-1382-0101 6 ELECTRICAL POWER INSTALLATION DETAILS Click 6

D-PM-G000-1383-0101 8 ELECTRICAL LIGHTING INSTALLATION DETAILS Click 8

D-PM-G000-1384-0001 7 GROUNDING AND LIGHTNING PROTECTION PHILOSOPHY Click 7

D-PM-G000-1384-0101 6 ELECTRICAL GROUNDING INSTALLATION DETAILS Click 6

D-FE-C300-1386-0001 7 INTERFACE PHILOSOPHY DIAGRAM FOR TELECOMMUNICATION SYSTEM Click 6 7

D-FE-C300-1386-0002 8 SYSTEM BLOCK DIAGRAM FOR TELEPHONE SYSTEM Click 8

D-FE-C300-1386-0003 8 SYSTEM BLOCK DIAGRAM FOR HOTLINE SYSTEM Click 8

D-FE-C300-1386-0004 8 SYSTEM BLOCK DIAGRAM FOR PA/GA SYSTEM Click 8

D-FE-C300-1386-0005 7 SYSTEM BLOCK DIAGRAM FOR DATA NETWORK & WLAN SYSTEM Click 7

D-FE-C300-1386-0006 8 SYSTEM BLOCK DIAGRAM FOR CCTV SYSTEM Click 8

4
Index of ITB PACKAGE Volume III: General Book

Issued
Not Issued to
Document Number Latest Rev. Document Title PDF File Remarks Original ITB Addendum-1 Addendum-2 Addendum-3 Addendum-4
Bidders
No.

D-FE-C300-1386-0007 5 SYSTEM BLOCK DIAGRAM FOR SYSTEM MANAGEMENT Click 5

2.1.4.6 Others

D-PK-G000-1168-0001 7 OVERALL SECURITY FENCE AND TEMPORARY CONSTRUCTION FENCE LAYOUT Click N/A 7

Only Document Title was


D-PK-G000-1168-0013 8 COMMUNICATION NETWORK FACILITIES Click corrected as per the actual DWG. 7 8

D-PK-G000-1168-0014 8 TEMPORARY FACILITIES SEWER LINE LAYOUT Click 7 8 9

D-PK-G000-1168-0022 6 EPC CAMP, LAYDOWN YARD, FENCES AND GATES Click 6

D-PK-G000-1168-0023 16 TEMPORARY CONSTRUCTION FACILITIES PLOT PLAN Click 13 15 16

D-PK-G000-1168-0026 7 HEAVY HAUL ROUTE Click 5 6 7

D-PK-G000-1168-0031 11 PLANT NEW ROADS PLOT PLAN Click 8 11 12

D-PK-G000-1168-0032 7 PLANT PRIMARY ROADS-PIPEWAY ROUTE PLAN Click N/A 7

D-PK-G000-1168-0036 5 CONCEPTUAL GATE 5A LAYOUT & LOCATION Click N/A 5

D-PK-G000-1168-0037 7 PROPOSED HIGHWAY-5 ROAD INTERSECTION Click N/A 7 8

D-PK-G000-1168-0053 2 EPC CONSTRUCTION CAMP Click N/A 2 4

D-PK-G000-1168-0055 1 EPC CONTRACTOR TIE-IN PEDESTAL LOCATION Click N/A 1

2.1.5 Other Requirements and Study report

S-PK-G000-1621-0001 2 OVERALL PROJECT HEALTH, SAFETY AND ENVIRONMENTAL PLAN Click 2

S-PK-G000-1621-0002 4 WORKSITE HEALTH, SAFETY & ENVIRONMENTAL REQUIREMENT Click 4

S-PK-G000-1621-0003 3 WASTE MANAGEMENT GUIDELINE FOR CONSTRUCTION PHASE Click 3

S-PK-G000-1621-0004 2 TRAFFIC AND LOGISTIC STUDY Click 2

S-PK-G000-1621-0005 2 STRATEGY FOR TEMPORARY FENCE, SITE SECURITY AND TRAFFIC MANAGEMENT Click 2

S-PK-G000-1621-0102 2 CONSTRUCTION COMMUNICATION REQUIREMENTS Click 1 2

S-PK-G000-1621-0105 3 TRANSPORTATION AND HEAVY LIFT OPERATIONS REQUIREMENT Click 3

S-PK-G000-1621-0901 X CAMP LOCATION, WATER, POWER SUPPLY AND TREATED SEWAGE WATER DISPOSAL STRATEGY N/A Cancelled 4 (Cancelled)

S-PK-G000-1621-0902 8 CAMP AND TEMPORARY SITE FACILITY REQUIREMENT Click 5 7 8

S-PM-G000-1140-0011 5 TEMPLATE OF EQUIPMENT LIST Click 5

S-PM-G000-1140-0012 2 TEMPLATE OF ELECTRICAL LOAD SCHEDULE Click 2

S-PM-G000-1140-0013 2 TEMPLATE OF EFFLUENT SUMMARY Click 2

S-PM-G000-1140-0014 2 TEMPLATE OF UTILITY SUMMARY Click 2

S-PM-G000-1140-0015 2 TEMPLATE OF CATALYST & CHEMICAL SUMMARY Click 2

S-PM-G000-1224-0701 10 REQUIREMENTS FOR SPARE PARTS Click 8 9 10

S-PM-G000-1225-0301 8 SPECIFICATION FOR PLANT LAYOUT Click 7 8 9

S-PM-G000-1225-0302 5 SPACING AND DIKING FOR ATMOSPHERIC AND LOW-PRESSURE TANKS Click 4 5 6

S-PM-G000-1225-0303 7 SAFETY REQUIREMENTS REFRIGERATED AND PRESSURE STORAGE VESSELS Click 7

S-PM-G000-1240-0003 8 HAZOP STUDY PROCEDURE Click 7 8

S-PM-G000-1240-0005 3 PROCESS HAZARD ANALYSIS PROCEDURE Click 3

S-PM-G000-1240-0006 3 SIL CLASSIFICATION STUDY PROCEDURE Click 3

S-PM-G000-1261-0001 6 MAINTENANCE MANAGEMENT PHILOSOPHY Click 4 5 6

S-PM-G000-1370-0002 6 SPECIFICATION FOR P&ID SYMBOLS AND IDENTIFICATION Click 6

S-PM-G000-1621-0101 4 CONSTRUCTABILITY REQUIREMENT Click 4

S-PM-G000-1654-0001 0 SPECIFICATION FOR DANGEROUS MATERIAL Click 0

S-PM-G000-1710-0002 8 GUIDELINE FOR SPLIT OF WORK AT HANDOVER Click 7 8

S-PM-G000-1900-0001 5 TRAINING REQUIREMENT Click 5

S-PM-G000-3112-0001 8 CONSTRUCTION SPECIFICATION FOR EARTHWORKS Click 7 8

S-PM-G000-3112-0002 8 CONSTRUCTION SPECIFICATION FOR SITE PREPARATION Click 8

S-PM-G000-3116-0001 6 CONSTRUCTION SPECIFICATION FOR SEWER AND DRAINAGE Click 6

S-PM-G000-3117-0001 6 CONSTRUCTION SPECIFICATION FOR ASPHALT ROAD AND PAVING Click 6

S-PM-G000-3117-0002 6 CONSTRUCTION SPECIFICATION FOR AREA PAVING Click 6

S-PM-G000-3120-0001 6 CONSTRUCTION SPECIFICATION FOR CONCRETE WORK Click 6

S-PM-G000-3130-0001 10 CONSTRUCTION SPECIFICATION FOR SHOP FABRICATION OF STRUCTURAL STEEL Click 7 8 9 10

S-PM-G000-3130-0002 7 CONSTRUCTION SPECIFICATION FOR SITE ERECTION OF STRUCTURAL STEEL Click 7

S-PM-G000-3150-0801 3 CONSTRUCTION REQUIREMENT FOR EQUIPMENT ERECTION WORK Click 3

S-PM-G000-3160-0801 5 CONSTRUCTION REQUIREMENT FOR PIPING WORK Click 5

S-PM-G000-1240-0011 3 BUILDING RISK ASSESSMENT STUDY RESULTS Click 3 4

2.1.6 PCS Documents

S-FE-G000-1371-2101 2 PCS NMR DOCUMENT LIST Click 2

S-FE-G000-1371-2102 2 PCS PROJECT EXECUTION PLAN (EPC PHASE) Click 2

S-FE-G000-1371-2103 2 RESPONSIBILITY MATRIX (EPC PHASE) Click 2

S-FE-G000-1371-2104 2 SPI TO PCS DATA EXCHANGE PROCEDURE Click 2

S-FE-G000-1371-2105 3 INTEGRATION STUDY BETWEEN PHASE 1 & PHASE 2 Click 3

S-FE-G000-1371-2106 2 PCS PROJECT SCHEDULE -EPC PHASE Click 2

S-FE-G000-1371-2108 2 GENERAL PCS SCOPE OF WORK (EPC PHASE) Click 2

S-FE-G000-1371-2111 2 OVERALL PCS GENERAL SPECIFICATION Click 2

S-FE-G000-1371-2113 3 PCS CONSOLE DESIGN GUIDELINES Click 3

S-FE-G000-1371-2114 2 PCS CABINET DESIGN GUIDELINES Click 2

S-FE-G000-1371-2115 2 PCS HARDWARE COMPONENT GUIDELINES Click 2

S-FE-G000-1371-2116 2 PCS GROUNDING DESIGN GUIDELINES Click 2

S-FE-G000-1371-2118 2 PCS SYSTEM RELIABILITY AVAILABILITY CALCULATIONS Click 2

S-FE-G000-1371-2201 2 PCS PROJECT QUALITY PLAN EPC PHASE Click 2

S-FE-G000-1371-2202 2 PCS FAT/IFAT PLAN (EPC PHASE) Click 2

S-FE-G000-1371-2203 2 PCS SITE ACCEPTANCE TEST (SAT) PLAN Click 2

5
Index of ITB PACKAGE Volume III: General Book

Issued
Not Issued to
Document Number Latest Rev. Document Title PDF File Remarks Original ITB Addendum-1 Addendum-2 Addendum-3 Addendum-4
Bidders
No.

S-FE-G000-1371-2204 2 NETWORK INTERFACE & SYSTEM SECURITY GUIDELINES Click 2

S-FE-G000-1371-2205 2 PCS NAMING PHILOSOPHY Click 2

S-FE-G000-1371-2206 2 DCS HARDWARE DESIGN GUIDELINES Click 2

S-FE-G000-1371-2207 2 PCS FIBER OPTIC DESIGN GUIDELINES Click 2

S-FE-G000-1371-2208 2 PCS KVM & SERVER CONNECTION DESIGN GUIDELINES Click 2

S-FE-G000-1371-2209 2 PCS SZVMS_CONNECTION & DESIGN GUIDELINES Click 2

S-FE-G000-1371-2210 2 GPS ANTENNA SYSTEM INSTALLATION GUIDELINES Click 2

S-FE-G000-1371-2211 2 DCS SPECIFICATION & GUIDELINES Click 2

S-FE-G000-1371-2212 2 SIS SPECIFICATION & GUIDELINE Click 2

S-FE-G000-1371-2213 2 FGAS SPECIFICATION & GUIDELINE Click 2

S-FE-G000-1371-2214 2 VMS / FFVMS SPECIFICATIONS Click 2

S-FE-G000-1371-2215 2 HARDWARE GUIDELINES FOR VMS/FFVMS Click 2

S-FE-G000-1371-2216 2 VMS / FFVMS CONFIGURATION GUIDELINES Click 2

S-FE-G000-1371-2217 2 VMS / FFVMS TAG NAMING PHILOSOPHY Click 2

S-FE-G000-1371-2218 2 VMS / FFVMS INTEGRATION REQUIREMENTS Click 2

S-FE-G000-1371-2219 2 PROJECT EXECUTION PLAN FOR VMS /FFVMS (EPC PHASE) Click 2

S-FE-G000-1371-2220 2 PROJECT QUALITY PLAN FOR VMS/FFVMS/CMS Click 2

S-FE-G000-1371-2223 2 COMPRESSOR CONTROL SYSTEM (CCS) SPECIFICATIONS Click 2

S-FE-G000-1371-2224 2 HARDWARE GUIDELINES FOR CCS Click 2

S-FE-G000-1371-2225 2 COMPRESSOR CONTROL SYSTEM (CCS) CONFIGURATION GUIDELINE Click 2

S-FE-G000-1371-2226 2 CCS/TCS TAG NAMING PHILOSOPHY Click 2

S-FE-G000-1371-2227 2 CCS/TCS INTEGRATION REQUIREMENTS Click 2

S-FE-G000-1371-2228 2 PROJECT EXECUTION PLAN FOR CCS (EPC PHASE) Click 2

S-FE-G000-1371-2229 2 PROJECT QUALITY PLAN FOR CCS Click 2

S-FE-G000-1371-2232 2 ASSET MANAGEMENT SPECIFICATION Click 2

S-FE-G000-1371-2233 2 ASSET MANAGEMENT CONFIGURATION / DESIGN GUIDELINES Click 2

S-FE-G000-1371-2234 2 ALARM MANAGEMENT SPECIFICATION Click 2

S-FE-G000-1371-2235 2 ALARM MANAGEMENT SYSTEM CONFIGURATION & DESIGN GUIDELINES Click 2

S-FE-G000-1371-2301 2 SPARE PARTS LIST (RRECOMMENDED STARTUP & 2-YEAR OPERATIONAL SPARE) Click 2

S-FE-G000-1371-2309 2 LIFE CYCLE MANAGEMENT PROGRAM SPECIFICATION Click 2

S-FE-G000-1371-2310 2 DCS INSTALLATION & ENVIRONMENTAL GUIDELINES Click 2

S-FE-G000-1371-2311 2 DCS SUBSYSTEM COMMUNICATION GUIDELINES Click 2

S-FE-G000-1371-2312 2 SUBSYSTEM COMMUNICATION SPECIFICATION DCS-(MODBUS) FOR THIRD PARTY INTERFACE Click 2

S-FE-G000-1371-2313 2 SUBSYSTEM COMMUNICATION SPECIFICATION DCS-(OPC) FOR THIRD PARTY INTERFACE Click 2

S-FE-G000-1371-2314 2 INTERFACE SPECIFICATION / GUIDELINE FOR PCS TO DAHS Click 2

S-FE-G000-1371-2315 2 TIME SYNCHRONIZATION DESIGN GUIDELINES Click 2

S-FE-G000-1371-2316 3 PCS POWER CONSUMPTION & HEAT DISSIPATION CALCULATION Click 3

S-FE-G000-1371-2320 2 PCS TRAINING PLAN Click 2

D-FE-G000-1371-2109 3 OVERALL PCS SYSTEM ARCHITECTURE Click 3

D-FE-G000-1371-2110 3 PCS OVERALL BLOCK DIAGRAM Click 3

D-FE-G000-1371-2112 2 PCS SIGNAL FLOW DIAGRAM Click 2

D-FE-G000-1371-2117 2 CONSOLE LAYOUT DRAWING Click 2

D-FE-G000-1371-2119 3 ARCHITECTURE DRAWING FOR CMS/VMS/FFVMS Click 3

D-FE-G000-1371-2120 2 ARCHITECTURE DRAWING FOR CCS Click 2

2.1.7 MAC AGREEMENT

MAC_PA_2010-RII-001 - PROCESS AUTOMATION AGREEMENT Click -

2.2 General - Quality and Inspection Requirements

S-PM-G000-1520-0001 7 SHOP INSPECTION REQUIREMENTS INCLUDING INSPECTION LEVEL Click 6 7 9

S-PM-G000-1520-0002 3 FIELD INSPECTION REQUIREMENTS Click 3

S-PM-G000-1520-0003 3 GENERAL SPECIFICATION FOR NON DESTRUCTIVE EXAMINATION Click 3

S-PM-G000-1520-0004 3 GENERAL REQUIREMENTS FOR PRESSURE CASTING Click 3

S-PM-G000-1520-0005 2 NON CONFORMITY CONTROL PROCEDURE Click 2

S-PM-G000-1520-0006 3 SPECIFICATION FOR WELDING PROCEDURE APPROVAL AND WELD STATUS WITH NDT TRACKING Click 3

S-PM-G000-1520-0007 3 GENERAL REQUIREMENTS FOR PRESSURE TESTING Click 3

S-PM-G000-1520-0008 4 GENERAL REQUIREMENT FOR POSITIVE MATERIAL IDENTIFICATION Click 4

S-PM-G000-1520-0009 3 GENERAL REQUIREMENTS FOR MATERIAL CERTIFICATE AND TRACEABILITY Click 3

S-PM-G000-1520-0010 4 WELDING REQUIREMENT FOR PRESSURE VESSELS Click 4

S-PM-G000-1520-0011 3 WELDING REQUIREMENTS FOR ON-PLOT PIPING Click 3

S-PM-G000-1520-0013 4 GENERAL REQUIREMENTS FOR INSPECTION RECORD BOOK Click 3 4

2.3 General - Interface Management

2.3.1 Inteface Management

S-PM-G000-1225-0202 8 INTERFACE MANAGEMENT PLAN Click 7 8

D-PM-G000-1140-0001 3 PACKAGE DEFINITIONS Click 3 4

2.3.2 Tie-In Management

S-PM-G000-1225-0207 1 TIE-IN MANAGEMENT PLAN Click 1 2

2.4 General - Geotechnical Report

S-PK-G000-1311-0001 4 FACTUAL AND ENGINEERING REPORT FOR GEOTECHNICAL INVESTIGATION Click 4

S-PK-G000-1311-0002 3 TOPOGRAPHIC SURVEY MAP Click 3

S-PK-G000-1311-0011 2 ADDITIONAL FACTUAL AND ENGINEERING REPORT FOR GEOTECHNICAL INVESTIGATION Click 2

2.5 General - Additional Requirements

6
Index of ITB PACKAGE Volume III: General Book

Issued
Not Issued to
Document Number Latest Rev. Document Title PDF File Remarks Original ITB Addendum-1 Addendum-2 Addendum-3 Addendum-4
Bidders
No.

NOT APPLICABLE Click

2.6 Deviations from Project Requirements

NOT APPLICABLE Click

3. Local Regulations, Codes and Standards

3.1 Local Regulations

3.1.1 SEC

SEC-01 26-May-10 APPLICATION OF SECURITY DIRECTIVES Click 26-May-10

SEC-02 26-May-10 SECURITY FENCING Click 26-May-10

SEC-03 26-May-10 SECURITY GATE Click 26-May-10

SEC-04 26-May-10 SECURITY LIGHTING Click 26-May-10

SEC-05 26-May-10 INTEGRATED SECURITY SYSTEM Click 26-May-10

SEC-06 26-May-10 SECURITY DEVICES Click 26-May-10

SEC-07 26-May-10 POWER SUPPLY Click 26-May-10

SEC-08 26-May-10 COMMUNICATIONS Click 26-May-10

SEC-09 26-May-10 SECURITY DOORS Click 26-May-10

SEC-10 26-May-10 SECURITY LOCKS Click 26-May-10

SEC-11 26-May-10 IDENTIFICATION CARDS Click 26-May-10

SEC-12 26-May-10 INFORMATION PROTECTION Click 26-May-10

3.1.2 SAF

SAF-01 26-May-10 APPLICATION OF SAFETY AND FIRE PROTECTION DIRECTIVES Click 26-May-10

SAF-02 26-May-10 ENVIRONMENTAL, HEALTH AND SAFETY (EHS) MANAGEMENT Click 26-May-10

SAF-03 26-May-10 PLANT BUILDINGS Click 26-May-10

SAF-04 26-May-10 FIRE PROTECTION SYSTEMS Click 26-May-10

SAF-05 26-May-10 INDUSTRIAL DRAINAGE Click 26-May-10

SAF-06 26-May-10 PLANT LAYOUT, SPACING AND ACCESS Click 26-May-10

SAF-07 26-May-10 WELLSITE SAFETY Click 26-May-10

SAF-08 26-May-10 STORAGE TANKS AND STORAGE VESSELS Click 26-May-10

SAF-09 26-May-10 FIREPROOFING IN PLANTS Click 26-May-10

SAF-10 26-May-10 PRESSURE PIPING, PRESSURE VESSELS & TRANSPORTATION PIPELINES Click 26-May-10

SAF-11 26-May-10 EMERGENCY SHUTDOWN, ISOLATION AND DEPRESSURING Click 26-May-10

SAF-12 26-May-10 ELECTRICAL SAFETY Click 26-May-10

SAF-13 26-May-10 WORK PERMITS Click 26-May-10

SAFE MANUFACTURE, TRANSPORTATION, STORAGE AND USE OF EXPLOSIVE MATERIALS AND


SAF-14 26-May-10 Click 26-May-10
PYROTECHNIC ARTICLES

SAF-15 26-May-10 PRIVATE INDUSTRIAL FLEET VEHICLE FILLING STATIONS Click 26-May-10

SAF-16 26-May-10 BULK PLANTS AND AIR FUELING SUPPORT FACILITIES Click 26-May-10

SAF-17 26-May-10 OFFSHORE PRODUCTION FACILITIES Click 26-May-10

SAF-18 26-May-10 MINES AND MINERAL PROCESSING PLANTS Click 26-May-10

SAF-19 26-May-10 ELECTRIC POWER GENERATING PLANTS AND ASSOCIATED FACILITIES Click 26-May-10

SAF-20 26-May-10 PRE-INCIDENT PLANNING AND MANAGEMENT OF EMERGENCIES Click 26-May-10

SAF-21 26-May-10 PERSONAL PROTECTIVE EQUIPMENT (PPE) Click 26-May-10

SAF-22 26-May-10 PORTABLE ELECTRIC AND ELECTRONIC DEVICES Click 26-May-10

3.2 Saudi Aramco Standard

3.2.1 SAES

SAES-A-100 30-Apr-07 SURVEY COORDINATES, DATUM'S AND DATA FORMATS Click 30-Apr-07

SAES-A-102 30-Nov-02 AIR POLLUTANT EMISSION SOURCE CONTROL Click 30-Nov-02

SAES-A-103 30-Apr-05 DISCHARGES TO THE MARINE ENVIRONMENT Click 30-Apr-05

SAES-A-104 10-May-06 WASTEWATER TREATMENT, REUSE AND DISPOSAL Click 10-May-06

SAES-A-105 30-Nov-03 NOISE CONTROL Click See Note-1 30-Nov-03

SAES-A-109 28-Sep-08 SITE PLANNING FOR PRAYER SHELTERS Click 28-Sep-08

SAES-A-112 17-Nov-08 METEOROLOGICAL AND SEISMIC DESIGN DATA Click 17-Nov-08

SAES-A-113 10-Apr-07 GEOTECHNICAL ENGINEERING REQUIREMENTS Click 10-Apr-07

SAES-A-114 28-Apr-04 EXCAVATION AND BACKFILL Click 28-Apr-04

SAES-B-008 30-Apr-05 RESTRICTIONS TO USE OF CELLARS, PITS, AND TRENCHES Click 30-Apr-05

SAES-B-014 29-Feb-04 SAFETY REQUIREMENTS FOR PLANT AND OPERATIONS SUPPORT BUILDINGS Click 29-Feb-04

SAES-B-017 15-Mar-06 FIRE WATER SYSTEM DESIGN Click 15-Mar-06

SAES-B-019 15-Mar-06 PORTABLE, MOBILE AND SPECIAL FIXED FIREFIGHTING EQUIPMENT Click 15-Mar-06

SAES-B-053 20-Sep-08 MACHINE AND EQUIPMENT SAFETY GUARDING, ELEVATORS, ESCALATORS, AND CONVEYORS Click 20-Sep-08

SAES-B-058 29-Jun-05 EMERGENCY SHUTDOWN, ISOLATION, AND DEPRESSURING Click 29-Jun-05

SAES-B-061 22-Jun-08 PROTECTIVE SHIELDS FOR HIGH HEALTH HAZARD PIPING AND EQUIPMENT Click 22-Jun-08

SAES-B-064 7-May-06 ONSHORE AND NEARSHORE PIPELINE SAFETY Click 7-May-06

SAES-B-068 31-May-03 ELECTRICAL AREA CLASSIFICATION Click 31-May-03

SAES-B-069 5-Sep-06 EMERGENCY EYEWASHES AND SHOWERS Click 5-Sep-06

SAES-H-002 29-Jan-08 INTERNAL AND EXTERNAL COATINGS FOR STEEL PIPELINES AND PIPING Click 29-Jan-08

SAES-J-001 24-Aug-08 INSTRUMENTATION INDEX Click 24-Aug-08

SAES-J-003 3-Dec-08 INSTRUMENTATION - BASIC DESIGN CRITERIA Click 3-Dec-08

SAES-J-004 24-Aug-08 INSTRUMENTATION SYMBOLS AND IDENTIFICATION Click 24-Aug-08

SAES-J-005 31-Aug-08 INSTRUMENTATION DRAWINGS AND FORMS Click 31-Aug-08

SAES-J-100 8-Oct-08 PROCESS FLOW METERING Click 8-Oct-08

SAES-J-200 8-Oct-08 PRESSURE Click 8-Oct-08

SAES-J-300 18-Oct-08 LEVEL Click 18-Oct-08

7
Index of ITB PACKAGE Volume III: General Book

Issued
Not Issued to
Document Number Latest Rev. Document Title PDF File Remarks Original ITB Addendum-1 Addendum-2 Addendum-3 Addendum-4
Bidders
No.

SAES-J-400 18-Oct-08 TEMPERATURE Click 18-Oct-08

SAES-J-502 18-Oct-08 ANALYZER SHELTERS Click 18-Oct-08

SAES-J-505 18-Oct-08 COMBUSTIBLE GAS AND HYDROGEN SULFIDE IN AIR DETECTION SYSTEMS Click 18-Oct-08

SAES-J-600 18-Oct-08 PRESSURE RELIEF DEVICES Click 18-Oct-08

SAES-J-601 18-Oct-08 EMERGENCY SHUTDOWN AND ISOLATION SYSTEMS Click 18-Oct-08

BURNER MANAGEMENT, COMBUSTION AND WATERSIDE CONTROL SYSTEMS FOR WATERTUBE


SAES-J-602 18-Oct-08 Click 18-Oct-08
BOILERS

SAES-J-603 15-Oct-08 PROCESS HEATERS SAFETY SYSTEMS Click 15-Oct-08

SAES-J-604 15-Oct-08 PROTECTIVE AND CONDITION MONITORING EQUIPMENT FOR ROTATING MACHINERY Click 15-Oct-08

SAES-J-605 6-Sep-08 SURGE RELIEF PROTECTION SYSTEMS Click 6-Sep-08

SAES-J-607 22-Nov-08 BURNER MANAGEMENT SYSTEMS FOR SRU TRAINS Click 22-Nov-08

SAES-J-700 9-Sep-08 CONTROL VALVES Click 9-Sep-08

SAES-J-801 22-Oct-08 CONTROL BUILDINGS Click 22-Oct-08

SAES-J-901 22-Oct-08 INSTRUMENT AIR SUPPLY SYSTEMS Click 22-Oct-08

SAES-J-902 22-Oct-08 ELECTRICAL SYSTEMS FOR INSTRUMENTATION Click 22-Oct-08

SAES-J-903 31-Jan-05 INTRINSICALLY SAFE SYSTEMS Click 31-Jan-05

SAES-J-904 29-Jul-08 FOUNDATION TM FIELDBUS (FF) SYSTEMS Click 29-Jul-08

SAES-K-001 6-Sep-08 HEATING, VENTILATING AND AIR CONDITIONING (HVAC) Click 6-Sep-08

SAES-K-002 31-May-04 AIR CONDITIONING SYSTEMS FOR ESSENTIAL OPERATING FACILITIES Click 31-May-04

SAES-K-100 31-May-04 SAUDI ARAMCO MECHANICAL (HVAC) CODE Click 31-May-04

SAES-L-132 29-Jun-08 MATERIAL SELECTION FOR PIPING SYSTEMS Click 29-Jun-08

SAES-L-140 1-Nov-08 THERMAL EXPANSION RELIEF IN PIPING Click See Note-1 1-Nov-08

SAES-M-006 16-Sep-08 SAUDI ARAMCO SECURITY AND GENERAL PURPOSE FENCING Click 16-Sep-08

SAES-M-009 19-Oct-05 DESIGN CRITERIA FOR BLAST RESISTANT BUILDINGS Click 19-Oct-05

SAES-M-100 9-Oct-06 SAUDI ARAMCO BUILDING CODE Click 9-Oct-06

SAES-N-004 7-Oct-08 DESIGN AND INSTALLATION OF BUILDING THERMAL INSULATION Click 7-Oct-08

SAES-N-100 30-Jan-07 REFRACTORY SYSTEMS Click 30-Jan-07

SAES-N-110 30-Jan-07 INSTALLATION REQUIREMENTS - CASTABLE REFRACTORIES Click 30-Jan-07

SAES-Q-001 5-Mar-08 CRITERIA FOR DESIGN AND CONSTRUCTION OF CONCRETE STRUCTURES Click 5-Mar-08

SAES-Q-006 11-Jun-08 ASPHALT CONCRETE PAVING Click 11-Jun-08

SAES-Q-007 29-Oct-03 FOUNDATIONS AND SUPPORTING STRUCTURES FOR HEAVY MACHINERY Click 29-Oct-03

SAES-S-007 29-Dec-04 SOLID WASTE LANDFILL STANDARD Click 29-Dec-04

SAES-S-010 31-Dec-02 SANITARY SEWERS Click 31-Dec-02

SAES-S-020 6-Dec-06 INDUSTRIAL DRAINAGE AND SEWERS Click 6-Dec-06

SAES-S-030 7-Oct-07 STORM WATER DRAINAGE SYSTEMS Click 7-Oct-07

SAES-S-040 31-Dec-03 SAUDI ARAMCO WATER SYSTEMS Click 31-Dec-03

SAES-S-050 27-Jan-07 SPRINKLER AND STANDPIPE SYSTEMS IN BUILDINGS Click 27-Jan-07

SAES-S-060 28-Jan-04 SAUDI ARAMCO PLUMBING CODE Click 28-Jan-04

SAES-S-070 13-Nov-07 INSTALLATION OF UTILITY PIPING SYSTEMS Click 13-Nov-07

SAES-W-012 31-Dec-02 WELDING REQUIREMENTS FOR PIPELINES Click 31-Dec-02

SAES-W-014 29-Jun-05 WELD OVERLAYS AND WELDING OF CLAD MATERIALS Click 29-Jun-05

SAES-W-015 30-Mar-05 STRIP LINING APPLICATION Click 30-Mar-05

SAES-W-016 30-Mar-05 WELDING OF SPECIAL CORROSION-RESISTANT MATERIALS Click 30-Mar-05

SAES-Z-000 29-Jul-07 PROCESS CONTROL STANDARDS INDEX Click 29-Jul-07

SAES-Z-001 16-Apr-07 PROCESS CONTROL SYSTEMS Click 16-Apr-07

SAES-Z-004 5-Oct-08 SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) SYSTEM Click 5-Oct-08

SAES-Z-010 5-Jul-08 PROCESS AUTOMATION NETWORKS CONNECTIVITY Click 5-Jul-08

SAES-Z-020 16-Apr-07 DESIGN AND INSTALLATION OF FIBER OPTIC CABLE SYSTEMS FOR PROCESS CONTROL NETWORKS Click 16-Apr-07

3.2.2 SAMSS

01-SAMSS-029 30-Jun-03 RTR (FIBERGLASS) SEWER PIPE AND FITTINGS FOR GRAVITY FLOW Click 30-Jun-03

01-SAMSS-034 13-Nov-07 RTR (FIBERGLASS) PRESSURE PIPE AND FITTINGS Click 13-Nov-07

09-SAMSS-088 28-Feb-05 AGGREGATES FOR CONCRETE Click 28-Feb-05

09-SAMSS-091 30-Mar-05 QUALIFICATION REQUIREMENT FOR SHOP APPLIED INTERNAL FBE COATINGS Click 30-Mar-05

12-SAMSS-007 3-Sep-06 FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL Click 3-Sep-06

12-SAMSS-008 28-Jan-04 ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL Click 28-Jan-04

23-SAMSS-010 28-Feb-05 DISTRIBUTED CONTROL SYSTEMS Click 28-Feb-05

23-SAMSS-020 22-Nov-08 SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) SYSTEMS Click 22-Nov-08

23-SAMSS-030 15-Feb-06 REMOTE TERMINAL UNIT Click 15-Feb-06

23-SAMSS-050 31-Jul-04 TERMINAL MANAGEMENT SYSTEMS Click 31-Jul-04

23-SAMSS-060 25-Dec-06 APPLICATIONS INTEGRATION MIDDLEWARE Click 25-Dec-06

27-SAMSS-002 27-May-06 DIRECT EXPANSION AIR CONDITIONING SYSTEMS FOR OFFSHORE FACILITIES Click 27-May-06

32-SAMSS-017 24-Feb-08 SIDE ENTRY MIXERS Click 24-Feb-08

32-SAMSS-022 30-Jun-02 MANUFACTURE OF COMPONENTS FOR FLARE SYSTEMS Click 30-Jun-02

34-SAMSS-117 29-Jul-07 TURBINE FLOW METERS IN LIQUID SERVICE Click 29-Jul-07

34-SAMSS-118 3-Feb-07 POSITIVE DISPLACEMENT METERS Click 3-Feb-07

34-SAMSS-318 19-Oct-05 AUTOMATIC TANK GAUGING EQUIPMENT Click 19-Oct-05

34-SAMSS-319 15-Jan-07 RADAR TANK GAUGING EQUIPMENT Click 15-Jan-07

34-SAMSS-511 6-May-07 CHROMATOGRAPHS Click 6-May-07

34-SAMSS-512 31-Jul-05 OXYGEN ANALYZERS Click 31-Jul-05

34-SAMSS-514 6-Sep-08 COMBUSTIBLE GAS AND HYDROGEN SULPHIDE MONITORS Click 6-Sep-08

34-SAMSS-515 25-Mar-08 MOISTURE ANALYZERS Click 25-Mar-08

8
Index of ITB PACKAGE Volume III: General Book

Issued
Not Issued to
Document Number Latest Rev. Document Title PDF File Remarks Original ITB Addendum-1 Addendum-2 Addendum-3 Addendum-4
Bidders
No.

34-SAMSS-517 25-Aug-07 DENSITY METERS Click 25-Aug-07

34-SAMSS-611 31-Mar-08 SAFETY RELIEF VALVES CONVENTIONAL AND BALANCED TYPES Click 31-Mar-08

34-SAMSS-612 23-Apr-06 SAFETY RELIEF VALVES PILOT OPERATED TYPES Click 23-Apr-06

34-SAMSS-617 1-Jul-08 FLAME MONITORING SYSTEMS Click 1-Jul-08

34-SAMSS-619 23-Oct-07 BURNER MANAGEMENT SYSTEMS FOR WATERTUBE BOILERS Click 23-Oct-07

34-SAMSS-621 30-Nov-05 ESD SYSTEMS - HARD-WIRED - SOLID-STATE (NONPROGRAMMABLE) Click 30-Nov-05

34-SAMSS-622 30-Nov-03 ESD SYSTEMS - ELECTROMAGNETIC RELAY Click 30-Nov-03

34-SAMSS-623 27-Dec-08 PROGRAMMABLE CONTROLLER BASED ESD SYSTEMS Click 27-Dec-08

34-SAMSS-625 5-Feb-07 MACHINERY PROTECTION SYSTEMS Click 5-Feb-07

34-SAMSS-634 21-Dec-05 LOCAL ZV CONTROL SYSTEMS Click 21-Dec-05

34-SAMSS-711 9-Sep-08 CONTROL VALVES Click 9-Sep-08

34-SAMSS-716 29-Jul-07 PNEUMATIC ACTUATORS ON-OFF SERVICE Click 29-Jul-07

34-SAMSS-717 30-Nov-05 HYDRAULIC VALVE ACTUATORS SYSTEMS Click 30-Nov-05

34-SAMSS-718 13-Dec-08 ELECTRIC MOTOR OPERATED VALVE ACTUATORS Click 13-Dec-08

34-SAMSS-815 2-Jul-08 ANNUNCIATORS Click 2-Jul-08

34-SAMSS-820 28-May-07 INSTRUMENT CONTROL CABINETS - INDOOR Click 28-May-07

34-SAMSS-821 5-Oct-05 INSTRUMENT CONTROL CABINETS - OUTDOOR Click 5-Oct-05

34-SAMSS-830 25-Mar-08 PROGRAMMABLE LOGIC CONTROLLER Click 25-Mar-08

34-SAMSS-831 5-Apr-08 INSTRUMENTATION FOR PACKAGED UNITS Click 5-Apr-08

34-SAMSS-913 31-Jul-05 INSTRUMENTATION AND THERMOCOUPLE CABLE Click 31-Jul-05

3.2.3 SAEP

SAEP-12 31-Aug-04 PROJECT EXECUTION PLAN Click 31-Aug-04

SAEP-16 20-Nov-07 PROJECT EXECUTION GUIDE FOR PROCESS AUTOMATION SYSTEMS Click 20-Nov-07

SAEP-20 28-Sep-05 EQUIPMENT INSPECTION SCHEDULE Click 28-Sep-05

SAEP-127 3-Dec-06 SECURITY AND CONTROL OF SAUDI ARAMCO ENGINEERING DATA Click 3-Dec-06

SAEP-250 27-Oct-07 SAFETY INTEGRITY LEVEL ASSIGNMENT & VERIFICATION Click 27-Oct-07

SAEP-303 1-Jun-08 ENGINEERING REVIEWS OF PROJECT PROPOSAL AND DETAIL DESIGN DOCUMENTATION Click 1-Jun-08

SAEP-311 3-Jun-08 INSTALLATION OF HOT TAPPED AND STOPPLE CONNECTIONS Click 3-Jun-08

SAEP-316 4-Aug-08 PERFORMANCE QUALIFICATION OF COATING PERSONNEL Click 4-Aug-08

SAEP-318 29-Mar-08 PRESSURE RELIEF VALVE PROGRAM AUTHORIZATION FOR INSTALLATION, DELETION AND CHANGES Click 29-Mar-08

SAEP-319 04-Aug-08 PRESSURE RELIEF VALVES – ROUTINE TEST, INSPECTION, QUALITY ASSURANCE AND REGULATION Click 04-Aug-08

DISPOSAL OF WASTEWATER FROM CLEANING, FLUSHING AND DEWATERING PIPELINES AND


SAEP-327 15-Apr-07 Click 15-Apr-07
VESSELS

SAEP-349 10-Dec-07 ADVANCED PROCESS CONTROL (APC) SYSTEMS Click 10-Dec-07

SAEP-354 29-Oct-03 HIGH INTEGRITY PROTECTIVE SYSTEMS DESIGN REQUIREMENTS Click 29-Oct-03

SAEP-1027 19-Aug-08 PRESSURE RELIEF VALVE CONVENTIONAL AND BALANCED TYPES Click 19-Aug-08

SAEP-1050 26-Oct-05 GUIDELINE FOR DISASTER RECOVERY PLAN DEVELOPMENT FOR DECISION SUPPORT SYSTEM Click 26-Oct-05

SAEP-1131 31-Oct-04 PRESSURE RELIEF VALVE PROGRAM USE OF FORM SA 3099A-ENG, RV AUTHORIZATION Click 31-Oct-04

SAEP-1133 13-Nov-05 FORM 3750-ENG, PRESSURE RELIEVING DEVICE TEST REPORT Click 13-Nov-05

SAEP-1135 29-Feb-04 ON-STREAM INSPECTION ADMINISTRATION Click 29-Feb-04

SAEP-1141 31-Dec-96 INDUSTRIAL RADIATION SAFETY Click N/A 31-Dec-96

SAEP-1152 1-Jul-08 APPROVAL PROCEDURE FOR READY-MIXED CONCRETE MIX DESIGN Click 1-Jul-08

SAEP-1154 1-Jul-08 GUIDELINES FOR CONTRACTOR’S QUALITY PLAN Click 1-Jul-08

SAEP-1624 7-Oct-07 PREPARATION OF SYSTEM DESIGN DOCUMENT Click 7-Oct-07

SAEP-1626 19-Sep-07 CONFIGURATION AND GRAPHIC GUIDELINES Click 19-Sep-07

SAEP-1628 12-Sep-07 PREPARATION OF INTEGRATION SPECIFICATIONS DOCUMENT Click 12-Sep-07

SAEP-1630 29-May-07 PREPARATION OF INTEGRATION TEST PROCEDURE Click 29-May-07

SAEP-1634 27-Aug-08 FACTORY ACCEPTANCE TEST Click 27-Aug-08

SAEP-1636 12-Sep-07 INSTALLATION AND CHECKOUT PLAN Click 12-Sep-07

SAEP-1638 12-Sep-07 SITE ACCEPTANCE TEST PLAN Click 12-Sep-07

3.2.4 SAER

SAER-5317 Aug-1985 RELIEF SYSTEM EVALUATION Click Aug-1985

SAER-5437 - GUIDELINES FOR CONDUCTING HAZOP STUDIES Click See Note-1 -

SAER-5895 30-Sep-03 ALARM MANAGEMENT GUIDELINES FOR PROCESS AUTOMATION SYSTEMS Click 30-Sep-03

3.2.5 Standard Drawing

AB-036013-001 Rev.00 STANDARD DETAILS CAST IRON CATCH BASIN Click N/A 0

AB-036094-001 Rev.16 STANDARD ORIFICE PLATES Click Rev.16

AB-036094-002 Rev.01 STANDARD ORIFICE PLATES Click Rev.01

AB-036667-001 Rev.06 TELL - TALES FOR OVERHEAD POWERLINE AND PIPEWAY CROSSINGS - DETAILS Click Rev.06

AD-036555-001 Rev.08 STANDARD WERA PADS FOR UNRESTRAINED PIPELINE Click Rev.08

AD-036683-001 Rev.07 DETAILS OF ROADS AND DIKE WALLS IN TANK FARMS Click Rev.07

AE-036549-001 Rev.00 MINIMUM INSTRUMENTATIONS FOR SEPARATOR VESSELS Click Rev.00

AE-036550-001 Rev.00 BRANCH CONNECTIONS TO FLARE HEADERS Click Rev.00

DA-950146-001 Rev.01 WINDSOCK POLE ONSHORE HELIPAD OR AIR STRIP DETAILS - STRUCTURAL & ELECTRICAL Click Rev.01

DB-950078-001 Rev.00 CONCRETE THRUST BLOCK DETAILS FOR UTILITY PIPELINES Click N/A Rev.00

DE-950066-001 Rev.00 CORROSION BAR WEAR SUPPORT Click Rev.00

3.2.6 Saudi Aramco Sanitary Code

SASC-S-01 22-Jan-01 WATER Click 22-Jan-01

SASC-S-02 22-Jan-01 SANITARY WASTE WATER AND SEWAGE SYSTEMS Click 22-Jan-01

SASC-S-03 22-Jan-01 SOLID WASTE MANAGEMENT Click 22-Jan-01

SASC-S-04 22-Jan-01 FOOD ESTABLISHMENTS Click 22-Jan-01

9
Index of ITB PACKAGE Volume III: General Book

Issued
Not Issued to
Document Number Latest Rev. Document Title PDF File Remarks Original ITB Addendum-1 Addendum-2 Addendum-3 Addendum-4
Bidders
No.

SASC-S-07 22-Jan-01 CAMPS AND COMMUNAL LIVING FACILITIES Click 22-Jan-01

3.2.7 Forms and Data Sheets

SA-3099A-ENG 1-Jan-02 RELIEF VALVE AUTHORIZATION Click 1-Jan-02

SA-3750-ENG 1-Aug-94 RELIEF VALVE MAINTENANCE REPORT Click 1-Aug-94

SA-8020-612-ENG 1-May-00 INSTRUMENT SPECIFICATION SHEET - SAFETY RELIEF VALVES PILOT OPERATED Click 1-May-00

NMR-7900 1-Aug-06 NONMATERIAL REQUIREMENTS FOR FIRED HEATERS Click 1-Aug-06

NMR-7901 1-Aug-06 NONMATERIAL REQUIREMENTS FOR RECIPROCATING GAS COMPRESSORS Click 1-Aug-06

NMR-7902 1-Aug-06 NONMATERIAL REQUIREMENTS FOR PUMPS Click 1-Aug-06

NMR-7903 1-Aug-06 NONMATERIAL REQUIREMENTS FOR HIGH VOLTAGE SF6 DEAD TANK CIRCUIT BREAKERS Click 1-Aug-06

NMR-7904 1-Aug-06 NONMATERIAL REQUIREMENTS FOR METAL-CLAD SWITCH GEAR - HIGH VOLTAGE Click 1-Aug-06

NMR-7905 1-Aug-06 NONMATERIAL REQUIREMENTS FOR GENERAL PURPOSE STEAM TURBINES Click 1-Aug-06

NONMATERIAL REQUIREMENTS FOR TRANSFORMERS, SMALL, MEDIUM & LARGE, POWER


NMR-7906 1-Aug-06 Click 1-Aug-06
DISTRIBUTION

NMR-7907 1-Aug-06 NONMATERIAL REQUIREMENTS FOR INSTRUMENTATION (GENERAL) Click 1-Aug-06

NMR-7908 1-Aug-06 NONMATERIAL REQUIREMENTS FOR DIESEL ENGINES Click 1-Aug-06

NMR-7909 1-Aug-06 NONMATERIAL REQUIREMENTS FOR RECIPROCATING AIR COMPRESSORS Click 1-Aug-06

NONMATERIAL REQUIREMENTS FOR MEAL ENCLOSED SWITCH GEAR-LOW-VOLTAGE & MOTOR


NMR-7910 1-Aug-06 Click 1-Aug-06
CONTROL CENTERS

NMR-7911 1-Aug-06 NONMATERIAL REQUIREMENTS FOR CENTRIFUGAL COMPRESSORS Click 1-Aug-06

NMR-7912 1-Aug-06 NONMATERIAL REQUIREMENTS FOR ELECTRIC ROTATING MACHINERY Click 1-Aug-06

NMR-7913 1-Aug-06 NONMATERIAL REQUIREMENTS FOR INDUSTRIAL WATERTUBE BOILERS Click 1-Aug-06

NMR-7914 1-Aug-06 NONMATERIAL REQUIREMENTS FOR LOADING ARM Click 1-Aug-06

NMR-7915 1-Aug-06 NONMATERIAL REQUIREMENTS FOR LUBE OIL SYSTEMS Click 1-Aug-06

NMR-7916 1-Aug-06 NONMATERIAL REQUIREMENTS, CONCENTRATED FIREFIGHTING FOAM Click 1-Aug-06

NMR-7917 1-Aug-06 NONMATERIAL REQUIREMENTS FOR SPECIAL PURPOSE STEAM TURBINES Click 1-Aug-06

NMR-7918 1-Aug-06 NONMATERIAL REQUIREMENTS, SAFETY RELIEF VALVES CONVENTIONAL & BALANCED TYPES Click 1-Aug-06

NMR-7918-1 1-Aug-06 NONMATERIAL REQUIREMENTS, SHOP AND FIELD ERECTED TANKS Click 1-Aug-06

NMR-7918-2 1-Aug-06 NONMATERIAL REQUIREMENTS, FLOATING AND INTERNAL FLOATING ROOFS Click 1-Aug-06

NMR-7919 1-Aug-06 NONMATERIAL REQUIREMENTS FOR FABRICATED PIPE BENDS PER 01-SAMSS-010 Click 1-Aug-06

NMR-7919-1 1-Aug-06 NONMATERIAL REQUIREMENTS, PRESSURE VESSELS Click 1-Aug-06

NMR-7919-2 1-Aug-06 NONMATERIAL REQUIREMENTS, COLUMN TRAYS Click 1-Aug-06

NMR-7920 1-Aug-06 NONMATERIAL REQUIREMENTS FOR DISCONNECTS SWITCHES Click 1-Aug-06

NMR-7921 1-Aug-06 NONMATERIAL REQUIREMENTS FOR INSULATORS Click 1-Aug-06

NONMATERIAL REQUIREMENTS FOR VIBRATION, AXIAL POSITION AND BEARING TEMPERATURE


NMR-7922 1-Aug-06 Click 1-Aug-06
MONITORING SYSTEM

NMR-7922-1 1-Aug-06 NONMATERIAL REQUIREMENTS, SHELL & TUBE AND DOUBLE-PIPE HEAT EXCHANGERS Click 1-Aug-06

NMR-7922-2 1-Aug-06 NONMATERIAL REQUIREMENTS, AIR-COOLED HEAT EXCHANGERS Click 1-Aug-06

NMR-7922-3 1-Aug-06 NONMATERIAL REQUIREMENTS, ELECTRIC HEAT EXCHANGERS Click 1-Aug-06

NMR-7922-4 1-Aug-06 NONMATERIAL REQUIREMENTS, PLATE AND FRAME HEAT EXCHANGERS Click 1-Aug-06

NMR-7922-5 1-Aug-06 NONMATERIAL REQUIREMENTS, COOLING TOWERS Click 1-Aug-06

NMR-7923 1-Aug-06 NONMATERIAL REQUIREMENTS FOR CONTROL PANELS PER 34 AMSS-820/821 (3/4) Click 1-Aug-06

NMR-7924 1-Aug-06 NONMATERIAL REQUIREMENTS FOR SOLID STATES ESD SYSTEMS (PER 34-AMSS-621) Click 1-Aug-06

NMR-7924-1 1-Aug-06 NONMATERIAL REQUIREMENTS FOR RELAY BASED ESD SYSTEMS (PER 34-SAMSS-622) Click 1-Aug-06

NMR-7925 1-Aug-06 NONMATERIAL REQUIREMENTS, VALVES-ALL TYPES (SPECIAL SERVICE SIZE/RATING ONLY) Click 1-Aug-06

NMR-7926 1-Aug-06 NONMATERIAL REQUIREMENTS, INSULATED CABLE-SINGLE CONDUCTOR OR MULTI CONDUCTOR Click 1-Aug-06

NMR-7927 1-Aug-06 NONMATERIAL REQUIREMENTS FOR FABRICATED STRUCTURAL STEEL Click 1-Aug-06

NMR-7928 1-Aug-06 NONMATERIAL REQUIREMENTS FOR PNEUMATIC-POWERED VALVE ACTUATOTRS Click 1-Aug-06

NMR-7929 1-Aug-06 NONMATERIAL REQUIREMENTS FOR COMMUNICATIONS EQUIPMENT Click 1-Aug-06

NMR-7930 1-Aug-06 NONMATERIAL REQUIREMENTS FOR Click 1-Aug-06

NMR-9597 1-Aug-06 NONMATERIAL REQUIREMENTS FOR UNINTERRUPTIBLE POWER SUPPLY (UPS) Click 1-Aug-06

NMR-9597-1 1-Aug-06 NONMATERIAL REQUIREMENTS FOR RECTIFIERS/BATTERY CHARGERS Click 1-Aug-06

3.2.8 Saudi Aramco Inspection Procedure

00-SAIP-12 1-Oct-07 Equipment Deficiency Reports Click 1-Oct-07

3.2.9 Saudi Aramco General Instruction

G.I. 2.102 28-Oct-08 PRESSURE TESTING SAFELY Click N/A 28-Oct-08

G.I. 2.104 1-Aug-09 OFFSHORE OIL SPILL REPORTING PROCEDURES Click 1-Aug-09

G.I. 2.400 1-Jul-06 OFFSHORE OIL SPILL CONTINGENCY PLAN Click 1-Jul-06

G.I. 2.401 22-Jan-06 INLAND OIL SPILL RESPONSE Click 22-Jan-06

MOVING DRILLING RIGS, HIGH CLEARANCE EQUIPMENT / LOADS, OR OPERATING CRANES UNDER
G.I. 2.702 1-Apr-03 Click 1-Apr-03
OR NEAR POWER-LINES

G.I. 2.718 1-Mar-10 CONTACTOR SITE ALLOTMENT PROCEDURE Click 1-Mar-10

G.I. 6.001 3-Mar-10 NOTIFICATION REQUIREMENTS FOR INCIDENTS (INCLUDING FIRES) Click 3-Mar-10

G.I. 6.003 10-Aug-09 INCIDENT INVESTIGATION Click 10-Aug-09

G.I. 6.012 22-Jul-07 ISOLATION, LOCKOUT AND USE OF HOLD TAGS Click N/A 22-Jul-07

G.I. 6.020 31-Oct-09 PERSONAL FLOTATION DEVICES (PFDs) FOR WORK ON, OVER OR NEAR WATER Click 31-Oct-09

G.I. 6.021 25-Apr-07 SAFETY REQUIREMENTS FOR ABRASIVE BLAST CLEANING Click See Note-1 25-Apr-07

G.I. 6.030 7-Sep-10 TRAFFIC AND VEHICLE SAFETY Click 7-Sep-10

G.I. 7.024 3-Jul-11 MARINE AND OFFSHORE CRANE, HOIST AND RIGGING OPERATIONS Click N/A 3-Jul-11

G.I. 7.025 25-Jul-08 HEAVY EQUIPMENT OPERATOR TESTING AND CERTIFICATION Click 25-Jul-08

G.I. 7.026 30-Mar-09 CRANE AND HEAVY EQUIPMENT INCIDENT REPORTING PROCEDURES Click 30-Mar-09

G.I. 7.027 15-Jul-08 CRANE SUSPENDED PERSONNEL PLATFORM (MANBASKET) OPERATIONS Click 15-Jul-08

G.I. 7.028 1-Jul-09 CRANE LIFTS: TYPES AND PROCEDURES Click 1-Jul-09

G.I. 7.029 14-Jul-07 RIGGING HARDWARE REQUIREMENTS Click 14-Jul-07

G.I. 7.030 11-Aug-08 INSPECTION AND TESTING REQUIREMENTS FOR ELEVATING/LIFTING EQUIPMENT Click 11-Aug-08

10
Index of ITB PACKAGE Volume III: General Book

Issued
Not Issued to
Document Number Latest Rev. Document Title PDF File Remarks Original ITB Addendum-1 Addendum-2 Addendum-3 Addendum-4
Bidders
No.

G.I. 8.001 30-Jun-09 SAFETY REQUIREMENTS FOR SCAFFOLDS Click 30-Jun-09

G.I. 8.002 9-Mar-10 SAFETY SPECTACLES Click 9-Mar-10

G.I. 8.005 11-Apr-06 PROTECTIVE (SAFETY) FOOTWEAR Click 11-Apr-06

G.I. 150.001 29-Jul-07 ASBESTOS HAZARD MANAGEMENT Click 29-Jul-07

BASIC LIFE SUPPORT (BLS) HEARTSAVER AUTOMATED EXTERNAL DEFIBRILLATOR (AED) /


G.I. 150.002 15-Sep-08 Click 15-Sep-08
STANDARD FIRST AID (SFA) AND FIRST AID KIT

G.I. 150.003 6-Jan-09 IONIZING RADIATION PROTECTION Click 6-Jan-09

G.I. 151.006 22-Jan-01 IMPLEMENTING THE SAUDI ARAMCO SANITARY CODE Click 22-Jan-01

ASSETS PLANT TAG NUMBERING & PREPARATION OF FORM SA-9032 & SA-9032-1 "CREATE ASSET
G.I. 202.305 24-Apr-10 Click 24-Apr-10
MASTER DATA"

G.I. 430.001 1-Jan-10 IMPLEMENTING THE SAUDI ARAMCO HAZARDOUS WASTE CODE Click N/A 1-Jan-10

G.I. 475.001 16-Dec-09 BLASTING NEAR EXISTING FACILITIES Click See Note-1 16-Dec-09

G.I. 710.001 1-Aug-10 SAUDI ARAMCO ID CARDS Click N/A 1-Aug-10

G.I. 710.002 1-Feb-08 CLASSIFICATION AND HANDLING OF SENSITIVE INFORMATION Click 1-Feb-08

G.I. 710.005 17-May-11 VEHICLE STICKERS AND HEAVY EQUIPMENT ACCESS TO COMPANY FACILITIES Click N/A 17-May-11

G.I. 710.011 1-Sep-09 PHOTOGRAPHY AND FILMING OF SAUDI ARAMCO RESTRICTED FACILITIES AND OPERATING AREAS Click 1-Sep-09

G.I. 1010.007 8-Jan-05 SAFE PRACTICES FOR TOWING EQUIPMENT AND TRAILERS Click N/A 8-Jan-05

G.I. 1021.000 17-Mar-10 STREET AND ROAD CLOSURE: EXCAVATION, REINSTATEMENT AND TRAFFIC CONTROLS Click N/A 17-Mar-10

G.I. 1183.005 21-Jan-06 PROCEDURE FOR REQUESTING CARGO HAULING, SAP TRANSACTION ZTCV431A, TRUCK REQUEST Click N/A 21-Jan-06

G.I. 1781.001-1 3-Jan-09 INSPECTION, TESTING, & MAINTENANCE OF FIRE PROTECTION EQUIPMENT Click 3-Jan-09

G.I. 1787.000-1 17-Jul-10 REPORT OF FIRE, EMERGENCY, OR FALSE ALARM Click 17-Jul-10

TDOM 21 9-Feb-10 TRANSPORTING EXPLOSIVES IN COMPANY OWNED/LEASED/RENTED MOTOR TRANSPORT VEHICLES Click 9-Feb-10

3.3 PetroRabigh Standard

PRC 360.368 18-Nov-07 HSE INSTRUCTION MANUAL WORK PERMITS Click 18-Nov-07

PRC 410.572 31-Aug-08 HSE INSTRUCTION MANUAL WASTE MANAGEMENT Click N/A 31-Aug-08

PRC 410.773 31-Aug-08 HSE INSTRUCTION MANUAL WASTE WATER TREATMENT Click N/A 31-Aug-08

3.4 Saudi Aramco Construction Safety Manual

SACSM 1-Feb-93 SAUDI ARAMCO CONSTRUCTION SAFETY MANUAL Click N/A 1-Feb-93

Note-1) An indication error of Issue Date was corrected. Document which was originally issued as ITB is unchanged.