Академический Документы
Профессиональный Документы
Культура Документы
MR CHINWENDU
18 14 BASIL OFFIA
CHAMEZIE
RESIDENTIAL 1 OF 1 1 A 0 1 0 Recently re-roofed
MR. ENWEREM
23 20 BASIL OFFIA
AMBROSE
RESIDENTIAL 1 OF 1 2 A 0 1 0 Recently re-roofed
24 21A BASIL OFFIA MR. ARINZE OKONKWO UNKNOWN N/A N/A G 1 0 0 No Construction
MR BONIFACE
25 21B BASIL OFFIA
NWACHUKWU
UNKNOWN N/A N/A G 1 0 0 No Construction
MR CHIJIOKE
26 22 BASIL OFFIA
IBEH/EGBE
RESIDENTIAL 1 OF 1 2 A 0 1 0 Limited Entry
Building appears to be in
31 26 BASIL OFFIA MR LINUS MOGHALU RESIDENTIAL 1 OF 1 3 G 1 0 0
good condition
Ongoing construction-
33 27B BASIL OFFIA MR. CHIDE EZINOFOR UNKNOWN N/A N/A G 1 0 0
foundation stage
Building very far from
34 28 BASIL OFFIA MR IKENNA RESIDENTIAL 1 OF 1 3 G 1 0 0
epicentre, unaffected
Shattered windows,
damaged doors were
1 1 PHILLIP OBUH MR. PHILLIP OBUH RESIDENTIAL 1 OF 2 2 A 0 1 0
observed. The roof has also
been replaced.
Building not affected by
2 1 PHILLIP OBUH MR. PHILLIP OBUH RESIDENTIAL 2 OF 2 1 G 1 0 0
explosion
MR CHIBUIKEM
22 17 PHILIP OBUH
EGEJURU
RESIDENTIAL 1 OF 3 2 G 1 0 0 No damage to the building
MR CHIBUIKEM
23 17 PHILIP OBUH
EGEJURU
RESIDENTIAL 2 OF 3 2 G 1 0 0 No damage to the building
MR CHIBUIKEM
24 17 PHILIP OBUH
EGEJURU
RESIDENTIAL 3 OF 3 2 G 1 0 0 No damage to the building
MR KINGSLEY
32 23A PHILIP OBUH
MADUKWE
UNKNOWN 1 OF 1 2 G 1 0 0 No damage to the building