Accumulator Draw
Down Test
201
8
Revision 1.0
Doc Number: QA-PR-0000
Revision History
Revision
Date Author Scope/Remarks
No
1.0 08/05/2018 Ibrar Ahmed Initial issue.
Document Authorization
Revision 1.0 Document Owner Document Author Document Custodian
Drilling Manager
User Notes:
This document is the property of United Energy Pakistan (Pvt) Ltd Neither the
whole nor any part of this document may be disclosed to others or reproduced,
stored in a retrieval system, or transmitted in any form by any means (electronic,
mechanical, reprographic recording or otherwise) without prior written consent of
the owner.
Copy Control
Controlled copies of this document shall be identified by a copy number, which is
an integral part of the printing on the cover page of the document.
Uncontrolled copies of this document may be issued to interested parties or
customers, subject to the consent of the Document Authority. Records of such
issues shall be maintained and each copy will be dated and endorsed “Uncontrolled
Copy” on the cover page of the copy.
2. Scope:
This procedure is placed as guidance for all rig staff to be able to conduct
Accumulator Drawdown Test to verify that the Accumulator System is able to
support the fluid volume and pressure requirements of the BOPs in use, to be
capable of securing the well in the event of total loss of power.
3. Definitions:
BOP: Blow Out Preventer
4. Responsibility:
Tool Pusher, Driller, Assistant Driller
6. Procedure
6.1 HSE Consideration
Keep working area clean.
Ensure proper placement of hands and fingers.
Barricade the testing area with Hazard/ Barrier tape.
Inform all crew on the ongoing testing operation.
Rig # Well #
Operator Location
Procedure:
1. All Rams and Annular Open, HCR Shut
2. Close Air Supply to Air Pumps
3. Stop Electrical Pump
4. Record Pressure of Accumulator Bank PSI Target 3000 PSI
5. Regulated Manifold Pressure PSI Target 1500 PSI
Run Tubular into the Well (Minimum Diameter Pipe anticipated to be used, i.e 3 ½” DP)
Close Annular BOP Time Sec Remaining Pressure PSI
Close Upper Variable / Pipe Rams Time Sec Remaining Pressure PSI
Close Lower Variable / Pipe Rams Time Sec Remaining Pressure PSI
Open Upper Variable / Pipe Rams Time Sec Remaining Pressure PSI
Open Lower Variable / Pipe Rams Time Sec Remaining Pressure PSI
Open Annular BOP Time Sec Remaining Pressure PSI
Open HCR Time Sec Remaining Pressure PSI
Remove Tubular from the Well
Close Shear Rams Time Sec Remaining Pressure PSI
Record Final Manifold Pressure PSI Needs to be more than 1200 PSI
Did Low Accumulator Pressure Sound Yes No PSI
Did Low Air Pressure Alarm Sound Yes No PSI
Response Time Annular & Ram Preventers Less than 30 Sec ? Yes No
Open the Shear Rams and Close HCR. Switch on Air & Electrical Pump
Recharge Accumulator Banks Min Target <15 Min.
Check Control Lines with 3000 PSI Operating Pressure. Install Tubular into the Well. Operate By Pass
to put 3000 PSI on Manifold. Close and Open Pipe Rams and HCR (Also Kill Line HCR if fitted) from
the Remote Panel. Remove Tubular from Well. Close and Open Shear Ram whilst still in Bypass
Mode. Look for leaks on BOP’s and Hoses when carrying out above tests. Reset Bypass back to
working position.
Check Pressure Electrical Pump Cut Out PSI Target 3000 PSI
Check Pressure Air Pumps Cut Out PSI Target 2950 PSI
Check Pressure Electrical Pump Jumps in PSI Target 2700 PSI
Check Pressure Air Pumps Jumps in PSI Target 2700 PSI
Check Oil Level and Low Oil Level Alarm
Check Operation of Remote Control Operating Board
Check Pressure in Back-up N2 Bottles PSI Target 2000 PSI