Вы находитесь на странице: 1из 10

Commissioning Service Department

Commissioning Standard Test Formats


Description: V.T. LOOP TEST Location :
Equip. No.: Drawing ref.: Sheet : 1 of 10 VT Ratio : 132kV/ √ 3 : 115/√ 3
Contractor : Contract no.: Substation No :

VT LOOP TEST :

MEASURED MEASURED MEASURED MEASURED


APPLIED VOLTAGE
VOLTAGE VOLTAGE VOLTAGE VOLTAGE
PHASE
PANEL : VT TER. BOX PANEL : D07 PANEL : D07 PANEL : D07 PANEL : D07
VT- BOX VALUE T.B VALUE T.B VALUE T.B VALUE T.B VALUE
VR- N 1r2, 1rn X62: 22, 46 X62: 21, 45 X62: 20, 44 X62: 19, 43

VY- N 1y2, 1yn X62: 30, 46 X62: 29, 45 X62: 28, 44 X62: 27, 43

VB- N 1b2, 1bn X62: 38, 46 X62: 37, 45 X62: 36, 44 X62: 35, 43

MEASURED MEASURED MEASURED MEASURED


APPLIED VOLTAGE
VOLTAGE VOLTAGE VOLTAGE VOLTAGE
PHASE
PANEL : VT TER. BOX PANEL : D07 PANEL : D07 PANEL : D07 PANEL : D07
VT- BOX VALUE T.B VALUE T.B VALUE T.B VALUE T.B VALUE
VR- VY 1r2, 1y2 X62: 22, 30 X62: 21, 29 X62: 20, 28 X62: 19, 27

VY- VB 1y2, 1b2 X62: 30, 38 X62: 29, 37 X62: 28, 36 X62: 27, 35

VB- VR 1b2, 1r2 X62: 38, 22 X62: 37, 21 X62: 36, 20 X62: 35, 19

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: V.T. LOOP TEST Location :
Equip. No.: Drawing ref.: Sheet : 2 of 10 VT Ratio : 132kV/ √ 3 : 115/√ 3
Contractor : Contract no.: Substation No :

MEASURED MEASURED MEASURED MEASURED


APPLIED VOLTAGE
VOLTAGE VOLTAGE VOLTAGE VOLTAGE
PHASE
PANEL : VT TER. BOX PANEL : D07 PANEL : D07 PANEL : D07 PANEL : D07
VT- BOX VALUE T.B VALUE T.B VALUE T.B VALUE T.B VALUE
VR- N 2r2, 2rn X62: 18, 42 X62: 17, 41 X62: 16, 40 X62: 15, 39

VY- N 2y2, 2yn X62: 26, 42 X62: 25, 41 X62: 24, 40 X62: 23, 39

VB- N 2b2, 2bn X62: 34, 42 X62: 33, 41 X62: 32, 40 X62: 31, 39

MEASURED MEASURED MEASURED MEASURED


APPLIED VOLTAGE
VOLTAGE VOLTAGE VOLTAGE VOLTAGE
PHASE
PANEL : VT TER. BOX PANEL : D07 PANEL : D07 PANEL : D07 PANEL : D07
VT- BOX VALUE T.B VALUE T.B VALUE T.B VALUE T.B VALUE
VR- VY 2r2, 2y2 X62: 18, 26 X62: 17, 25 X62: 16, 24 X62: 15, 23

VY- VR 2y2, 2b2 X62: 26, 34 X62: 25, 33 X62: 24, 32 X62: 23, 31

VB- VY 2b2, 2r2 X62: 34, 18 X62: 33, 17 X62: 32, 16 X62: 31, 15

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: V.T. LOOP TEST Location :
Equip. No.: Drawing ref.: Sheet : 3 of 10 VT Ratio : 132kV/ √ 3 : 115/√ 3
Contractor : Contract no.: Substation No :

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: V.T. LOOP TEST Location :
Equip. No.: Drawing ref.: Sheet : 4 of 10 VT Ratio : 132kV/ √ 3 : 115/√ 3
Contractor : Contract no.: Substation No :

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: V.T. LOOP TEST Location :
Equip. No.: Drawing ref.: Sheet : 5 of 10 VT Ratio : 132kV/ √ 3 : 115/√ 3
Contractor : Contract no.: Substation No :

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: V.T. LOOP TEST Location :
Equip. No.: Drawing ref.: Sheet : 6 of 10 VT Ratio : 132kV/ √ 3 : 115/√ 3
Contractor : Contract no.: Substation No :

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: V.T. LOOP TEST Location :
Equip. No.: Drawing ref.: Sheet : 7 of 10 VT Ratio : 132kV/ √ 3 : 115/√ 3
Contractor : Contract no.: Substation No :

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: V.T. LOOP TEST Location :
Equip. No.: Drawing ref.: Sheet : 8 of 10 VT Ratio : 132kV/ √ 3 : 115/√ 3
Contractor : Contract no.: Substation No :

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: V.T. LOOP TEST Location :
Equip. No.: Drawing ref.: Sheet : 9 of 10 VT Ratio : 132kV/ √ 3 : 115/√ 3
Contractor : Contract no.: Substation No :

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: V.T. LOOP TEST Location :
Equip. No.: Drawing ref.: Sheet : 10 of 10 VT Ratio : 132kV/ √ 3 : 115/√ 3
Contractor : Contract no.: Substation No :

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:

Вам также может понравиться