Вы находитесь на странице: 1из 1

A B 3 2 1

LEGEND-FLOOR FINISH 0.50mm. THK. PRE-PAINTED


G.I. FLASHING
TOP OF FIREWALL TOP OF FIREWALL

0.30

0.30
600mm. x 600mm. VITRIFIED UNGLAZED APEX OF ROOF 0.50mm. THK. PRE-PAINTED APEX OF ROOF
FF-1 CERAMICS TILES RIB-TYPE G.I. SHEET ROOFING

1.00

1.00
150mm. x 200mm.
PVC GUTTER

300mm. x 300mm. VITRIFIED UNGLAZED TOP OF ROOF BEAM 150mm. THK. CHB FIREWALL TOP OF ROOF BEAM
FF-2 CERAMICS TILES WITH PLAIN CEMENT
PLASTERED PAINTED FINISH
100mm. THK. CHB ON PLAIN

3.90

3.90
CEMENT PLASTERED
PAINTED FINISH 150mm. THK. CHB FIREWALL
WITH PLAIN CEMENT
PLASTERED PAINTED FINISH
FF-3 100mm. THK. CHB WALL WITH

2.40

2.40
PLAIN CEMENT FINISH 12.5mm. PAINTED ACCENT
GROOVE ON PLAIN CEMENT
PLASTERED PAINTED FINISH

FIN. FLOOR LINE FIN. FLOOR LINE

0.20

0.20
FIN GROUND LINE FIN GROUND LINE

A B
4.00 2 FRONT ELEVATION 3 LEFT-SIDE ELEVATION
1.925 2.075 A-2 SCALE : 1 : 50 MTS. A-2 SCALE : 1 : 50 MTS.

0.70 1.375
0.30 0.40 0.60
B A 1 2 3
PROPERTY LINE 0.50mm. THK. PRE-PAINTED
G.I. FLASHING
PROPERTY LINE

TOP OF FIREWALL TOP OF FIREWALL

0.30

0.30
FF-3 APEX OF ROOF APEX OF ROOF
0.50mm. THK. PRE-PAINTED
+0.15m. T&B RIB-TYPE G.I. SHEET ROOFING
F. F. L.
2.00

6 FF-2

1.00

1.00
A-2 +0.15m. 150mm. x 200mm.
0.40 0.30

F. F. L. PVC GUTTER
0.70

TOP OF ROOF BEAM 150mm. THK. CHB FIREWALL TOP OF ROOF BEAM
W1 W3 WITH PLAIN CEMENT
PLASTERED FINISH
3
3.90

3.90
D2 D4
0.60

150mm. THK. CHB FIREWALL


WITH PLAIN CEMENT
PLASTERED PAINTED FINISH

2.40

2.40
100mm. THK. CHB ON PLAIN
CEMENT PLASTERED
PAINTED FINISH
PARTITION

1.20

PROPOSED
3.25

BEDROOM 2
FF-1
+0.20m. FIN. FLOOR LINE FIN. FLOOR LINE
0.20

0.20
F. F. L.
KITCHEN-DINING FIN GROUND LINE FIN GROUND LINE
AREA
FIREWALL

FF-1
4 REAR ELEVATION 5 RIGHT-SIDE ELEVATION
10.00

D3 +0.20m.
F. F. L.
FIREWALL

SCALE : 1 : 50 MTS. SCALE : 1 : 50 MTS.


6.50

A-2 A-2
2 PARTITION

D3
B A 3 2 1
0.50mm. THK. PRE-PAINTED
G.I. FLASHING
PROPOSED
LIVING AREA TOP OF FIREWALL TOP OF FIREWALL 0.50mm. THK. PRE-PAINTED
3.25

BEDROOM 1
0.30

0.30
0.50mm. THK. PRE-PAINTED G.I. FLASHING
PARTITION

FF-1 APEX OF ROOF RIB-TYPE G.I. SHEET ROOFING APEX OF ROOF


ON 150mm. x 65mm. x 20mm. x 2.0mm.
+0.20m.
F. F. L.
THK. LIP CHANNEL PURLINS
SPACED @ 700mm. O.C. 0.50mm. THK. PRE-PAINTED
1.00

1.00
RIB-TYPE G.I. SHEET ROOFING

150mm. x 200mm.
TOP OF ROOF BEAM TOP OF ROOF BEAM PVC GUTTER

1
0.30 0.40

REINFORCED CONCRETE REINFORCED CONCRETE


3.90

3.90
W1 W2 D1 BEAM (B-2)
0.70

BEAM (B-2)
SETBACK

150mm. THK. CHB FIREWALL


PROPERTY LINE

150mm. THK. CHB FIREWALL


1.50

2.40

2.40
WITH PLAIN CEMENT WITH PLAIN CEMENT
PLASTERED FINISH KITCHEN-DINING LIVING AREA PLASTERED FINISH
T&B T&B
0.80

AREA

SERVICE
PROPERTY LINE
AREA 100mm. THK. CHB ON PLAIN 100mm. THK. CHB ON PLAIN
CEMENT PLASTERED CEMENT PLASTERED
FIN. FLOOR LINE FIN. FLOOR LINE PAINTED FINISH
0.20

0.20
PAINTED FINISH
FIN GROUND LINE FIN GROUND LINE
1 FLOOR PLAN
A-2 SCALE : 1 : 50 MTS.

6 CROSS SECTION 7 LONGITUDINAL SECTION


A-2 SCALE : 1 : 50 MTS. A-2 SCALE : 1 : 50 MTS.

PROJECT TITLE : Republic of the Philippines ARCHITECT / ENGINEER DESIGNED: HTTRD CHECKED: RGRAMOS SHEET NO.
MUNICIPALITY OF TIGAON Office of the President
Province of Camarines Sur DRAWN: PLIBARDALOZA DATE:
NATIONAL HOUSING AUTHORITY
CHECKED BY RECOMMENDING APPROVAL SHEET CONTENT

REVIEWED BY A-2
TIGAON RESETTLEMENT PROJECT P1 FLOOR PLAN,
ELEVATIONS,
SECTIONS
DESIGNATION
APPROVED BY REVISIONS DATE:

LOCATION : Engr. CRISTINA A. CABANGON Engr. ALBERT A. PERFECTO MARCELINO P. ESCALADA JR. 2 12
REG No.: DATE:
BRGY. SALVACION, TIGAON, CAMARINES SUR DISTRICT MNGR DISTRICT II - REGION V REGIONAL MANAGER REGION V GENERAL MANAGER, NHA
MUNICIPAL MAYOR PTR No.: PLACE:

Вам также может понравиться