1.0 SCOPE
The work of surface preparation and the application of protective coatings and the
inspection thereof shall be carried out in accordance with this Specification, the coating
manufacturer’s written technical literature and other such instructions of the coating
manufacturer to the satisfaction of the owner’s Representative / Engineer herein called
the Company Representative.
The work procedure shall be performed in a sequence which maximizes the effectiveness and
integrity of the coating system. The sequence of work may be altered, modified or changed at
any time during the progress of the work subject to the owner’s approval.
Where necessary remove all weld splatter, smooth weld seams and sharp edges. Fresh
water wash to remove all dirt and contamination, as necessary. Degrease according to
SSPC-SP1 solvent cleaning. Ensure area is clean and dry prior to application. Power tool
clean damaged/corroded areas to St3 or SSPC-SP3. Apply the material before visible
oxidation occurs. If oxidation does occur, the entire oxidised surface should be re-sanded
to the standard specified above. Feather or chip back surrounding area to a sound edge.
Overlap onto existing coatings by 2-3 cms.
Address: # 745 Aurora Blvd., Brgy. Mariana New Manila, Quezon City Q-TCP-16/0003IP
Tel./Fax: 727-1491/722-1062
Website: www.megapaint.com.ph Page 2
Min: 6 Hours
Touch-up Interthane 990 50 Brush/Roller GTA 713 2 hours
Max: Extended
Application of paint shall not proceed when one of the environmental conditions below
exist.
(b) The surface temperature is less than 3° C above the dew point of the
air in the work area.
4.1 Cleaning
All surfaces to receive coating shall be prepared in accordance with Section 2.0.
Cleaned surfaces shall be primed with the specified coating materials within four
hours prior to the formation of oxidation (rust or bloom) on the steel surface.
4.3 Application
All inspections must be carried out with the presence of the Contractor and Megapaint
Representative.
5.1.1 Instruments
Address: # 745 Aurora Blvd., Brgy. Mariana New Manila, Quezon City Q-TCP-16/0003IP
Tel./Fax: 727-1491/722-1062
Website: www.megapaint.com.ph Page 3
The following or equivalent instruments shall be used for quality control
inspection and testing.