Вы находитесь на странице: 1из 3

CHAITANYA GODAVARI GRAMEENA BANK

(A Government undertaking sponsored by Andhra Bank)


HEAD OFFICE ::: GUNTUR
Guntur DEPT : Information Technology DATE : 16-03-2020

Addendum -2

RFP for Supply, installation, maintenance of Hardware & maintenance of


Core Banking Application of the Bank -2020

Tender Reference : 099/51/RFP/2019-20/01, Date: 17.02.2020


Date of Addendum : 16-03-2020

Purpose of Addendum:

Amendments in RFP document ------------- Page Nos - 01-03

Amendments in RFP

Page No. Current details Amended Clause

Bid Details Bid Details Bid Details

Last date for receipt of Bidding Documents Last date for receipt of Bidding Documents

17/03/2020 at 3.00 PM 26/03/2020 at 3.00 PM

Bid Details Bid Details – Bid Details-

Date & Time of Opening of Technical Bid - Date & Time of Opening of Technical Bid-
17/03/2020 at 3.30 PM 26/03/2020 at 3.30 PM

80 Sl No 4. Offered Storage array shall be end-to Sl No 4. Offered Storage array shall be end-to
end 16 Gbps enabled which means that end 12 Gbps enabled which means that
both Front-end Fiber channel ports and Back-end both Front-end Fiber channel ports and Back-end
engines shall be operated at engines shall be operated at
minimum 16Gbps speed. minimum 12Gbps speed.

81 Sl No 15 Sl No 15

The Storage shall be supplied with at-least 4 x The Storage shall be supplied with at-least 4 x 12
16Gbps Back-end SAS ports / 16x16Gbps SAS Gbps Back-end SAS ports / 16x 12 Gbps SAS
Lanes and shall be scalable to at-least 8x1Gbps Lanes and shall be scalable to at-least 8 x 12Gbps

RFP Ref : 099/51/RFP/2019-20/01 DT 17-02-2020 Page 1


Back-end SAS ports / 32 x 16Gbps SAS lanes. Back-end SAS ports / 32 x 12 Gbps SAS lanes.

301.1.1. Addition of new point -4.1.15 4.1.15 Migration of CBS Solution, data and
other associated systems from the existing
setup to replaced new hardware setup
should be carried out by the bidder at no
additional cost to the bank.

121 Sl No C. Application support L1 (Optional item). Sl No C. Application support L1 (Head


(Head office/Regional office) office/Regional office)

The words “Optional item” has been removed.

122 G. G.

Unix Administrator – L1 (at DC -1, DR-1) Unix Administrator – L1 (at DC -2, DR-1)

Annexure 14 –Bill of Material Annexure 14 –Bill of Material

110 O.Facility Managament O.Facility Managament

Sl. Minimum Confirmation Sl. Minimum Confirmation


Description Description
No Qty (Yes / No) No Qty (Yes / No)
Unix Unix
1 Administrator 1 1 Administrator 2
– L2 – L2
Unix Unix
2 Administrator 2 2 Administrator 3
– L1 – L1
Wintel Wintel
3 Administrator 1 3 Administrator 1
–L1 –L1
Database Database
4 Administrator 1 4 Administrator 1
–L2 –L2
Database Database
5 Administrator 1 5 Administrator 1
–L1 –L1
Network Network
6 Administrator 1 6 Administrator 1
– L2 – L2
Network Network
7 Administrator 4 7 Administrator 4
– L1 – L1
Application Application
8 5 8 5
Support – L2 Support – L2
Application Application
9 3 9 3
Support –L1 Support –L1

RFP Ref : 099/51/RFP/2019-20/01 DT 17-02-2020 Page 2


1.Hardware (DC &DR) 1.Hardware (DC &DR)

Column Label – AMC Cost Column Label – AMC Cost


inclusive of taxes inclusive of taxes
114 (to be capped
between 6% to 8%)
The words“to be capped between 6% to 8 %”
has been removed.

51 7.2.11 The bidder should have made profits in 7.2.11 The bidder should have made profits in
the past 3 years (FY ending March 2016 – FY the past 3 years (FY ending March 2017 – FY
ending March 2019). The relevant documents ending March 2019). The relevant documents
including Balance Sheet/Profit and Loss including Balance Sheet/Profit and Loss
Account/Certificate from Statutory Auditors Account/Certificate from Statutory Auditors
certifying the financials are to be submitted as certifying the financials are to be submitted as
part of the proposal. part of the proposal.

All the other terms and conditions of the RFP read with Addendum I remain unchanged.

Place : Guntur Dr. B V RAMANA RAO


Date : 16-03-2020 GENERAL MANAGER

RFP Ref : 099/51/RFP/2019-20/01 DT 17-02-2020 Page 3

Вам также может понравиться