Вы находитесь на странице: 1из 18

CENTRAL ELECTRICITY AUTHORITY

G O & D WING
OPERATION PERFORMANCE MONITORING DIVISION

DAILY MAINTENANCE REPORT (COAL, LIGNITE AND NUCLEAR) 06-07-2020

Planned Forced Forced Others


State/System Power Station Unit No. Maintenance Maintenance Maintenance Maintenance
(MW) (Major) (MW) (Minor) (MW) (MW)

1 2 3 4 5 6 7
Northern
Haryana INDIRA GANDHI 1 0.00 0.00 500.00 0.00
STPP
Haryana INDIRA GANDHI 2 0.00 500.00 0.00 0.00
STPP
Haryana INDIRA GANDHI 3 0.00 0.00 500.00 0.00
STPP
Haryana PANIPAT TPS 6 0.00 210.00 0.00 0.00

Haryana PANIPAT TPS 7 0.00 0.00 250.00 0.00


Haryana PANIPAT TPS 8 0.00 0.00 250.00 0.00
Haryana RAJIV GANDHI TPS 1 0.00 0.00 600.00 0.00

Haryana RAJIV GANDHI TPS 2 0.00 0.00 600.00 0.00


Haryana YAMUNA NAGAR 1 0.00 0.00 300.00 0.00
TPS
Haryana YAMUNA NAGAR 2 0.00 0.00 300.00 0.00
TPS
Punjab GH TPS (LEH.MOH.) 1 0.00 0.00 210.00 0.00
Punjab GH TPS (LEH.MOH.) 2 0.00 0.00 210.00 0.00

Punjab GH TPS (LEH.MOH.) 3 0.00 0.00 250.00 0.00

Punjab GH TPS (LEH.MOH.) 4 0.00 0.00 250.00 0.00


Punjab ROPAR TPS 3 0.00 0.00 210.00 0.00

Punjab ROPAR TPS 4 0.00 0.00 210.00 0.00


Punjab ROPAR TPS 5 0.00 0.00 0.00 0.00

Punjab ROPAR TPS 6 0.00 0.00 210.00 0.00


Punjab TALWANDI SABO 3 0.00 0.00 660.00 0.00
TPP
Rajasthan BARSINGSAR 1 0.00 0.00 0.00 0.00
LIGNITE
Rajasthan DAE (RAJASTHAN) 1 0.00 100.00 0.00 0.00
Rajasthan RAJASTHAN A.P.S. 2 0.00 0.00 200.00 0.00

Rajasthan CHHABRA TPP 2 0.00 0.00 250.00 0.00


Rajasthan CHHABRA TPP 5 0.00 0.00 0.00 0.00

Rajasthan CHHABRA TPP 6 660.00 0.00 0.00 0.00

Rajasthan GIRAL TPS 1 125.00 0.00 0.00 0.00

Rajasthan GIRAL TPS 2 125.00 0.00 0.00 0.00

Rajasthan KOTA TPS 5 0.00 0.00 210.00 0.00


Rajasthan SURATGARH TPS 1 0.00 250.00 0.00 0.00
Rajasthan SURATGARH TPS 2 0.00 250.00 0.00 0.00

Rajasthan SURATGARH TPS 3 0.00 250.00 0.00 0.00


Rajasthan SURATGARH TPS 4 0.00 250.00 0.00 0.00
Rajasthan SURATGARH TPS 5 0.00 250.00 0.00 0.00

Rajasthan SURATGARH TPS 6 0.00 250.00 0.00 0.00


Rajasthan SURATGARH TPS 7 0.00 660.00 0.00 0.00

Rajasthan JALIPA KAPURDI TPP 1 0.00 135.00 0.00 0.00

Rajasthan JALIPA KAPURDI TPP 6 0.00 0.00 135.00 0.00


Uttar Pradesh DADRI (NCTPP) 1 0.00 210.00 0.00 0.00

Uttar Pradesh DADRI (NCTPP) 2 0.00 210.00 0.00 0.00

Uttar Pradesh DADRI (NCTPP) 3 0.00 210.00 0.00 0.00

Uttar Pradesh DADRI (NCTPP) 4 0.00 0.00 210.00 0.00


Uttar Pradesh DADRI (NCTPP) 5 0.00 0.00 490.00 0.00

Uttar Pradesh DADRI (NCTPP) 6 0.00 0.00 490.00 0.00


Uttar Pradesh RIHAND STPS 3 0.00 0.00 0.00 0.00

Uttar Pradesh SINGRAULI STPS 4 0.00 0.00 200.00 0.00


Uttar Pradesh ANPARA TPS 7 0.00 500.00 0.00 0.00

Uttar Pradesh HARDUAGANJ TPS 7 0.00 105.00 0.00 0.00

Uttar Pradesh OBRA TPS 7 94.00 0.00 0.00 0.00

Uttar Pradesh OBRA TPS 9 0.00 0.00 200.00 0.00


Uttar Pradesh OBRA TPS 13 200.00 0.00 0.00 0.00

Uttar Pradesh PARICHHA TPS 1 110.00 0.00 0.00 0.00

Uttar Pradesh PARICHHA TPS 2 110.00 0.00 0.00 0.00

Uttar Pradesh PARICHHA TPS 6 0.00 0.00 250.00 0.00


Uttar Pradesh PRAYAGRAJ TPP 1 0.00 0.00 660.00 0.00

Uttar Pradesh PRAYAGRAJ TPP 2 0.00 0.00 0.00 0.00


Uttar Pradesh PRAYAGRAJ TPP 3 0.00 0.00 0.00 660.00

Total Northern 1,424.00 4,340.00 8,805.00 660.00


Western
Chhatisgarh LARA TPP 1 0.00 800.00 0.00 0.00

Chhatisgarh MARWA TPS 2 0.00 500.00 0.00 0.00

Chhatisgarh AVANTHA BHANDAR 1 0.00 0.00 600.00 0.00

Chhatisgarh BINJKOTE TPP 1 0.00 0.00 0.00 300.00

Chhatisgarh KASAIPALLI TPP 1 0.00 0.00 135.00 0.00


Chhatisgarh KATGHORA TPP 1 0.00 35.00 0.00 0.00

Chhatisgarh KATGHORA TPP 1 0.00 35.00 0.00 0.00

Chhatisgarh NAWAPARA TPP 1 0.00 0.00 300.00 0.00


Chhatisgarh NAWAPARA TPP 2 0.00 0.00 300.00 0.00

Chhatisgarh OP JINDAL TPS 1 0.00 0.00 250.00 0.00


Chhatisgarh OP JINDAL TPS 2 0.00 0.00 0.00 250.00

Chhatisgarh OP JINDAL TPS 3 0.00 250.00 0.00 0.00

Chhatisgarh RATIJA TPS 1 50.00 0.00 0.00 0.00

Chhatisgarh SALORA TPP 1 0.00 135.00 0.00 0.00

Chhatisgarh SVPL TPP 1 0.00 63.00 0.00 0.00

Chhatisgarh SWASTIK KORBA 1 0.00 25.00 0.00 0.00


TPP
Chhatisgarh TAMNAR TPP 2 0.00 600.00 0.00 0.00
Chhatisgarh TAMNAR TPP 4 0.00 600.00 0.00 0.00
Chhatisgarh UCHPINDA TPP 1 0.00 0.00 360.00 0.00

Chhatisgarh UCHPINDA TPP 4 0.00 360.00 0.00 0.00


Gujarat KAKRAPARA 2 0.00 0.00 220.00 0.00

Gujarat AKRIMOTA LIG TPS 2 0.00 0.00 125.00 0.00

Gujarat BHAVNAGAR CFBC 1 0.00 0.00 0.00 0.00


TPP
Gujarat BHAVNAGAR CFBC 2 0.00 0.00 250.00 0.00
TPP
Gujarat GANDHI NAGAR TPS 3 0.00 210.00 0.00 0.00

Gujarat GANDHI NAGAR TPS 4 0.00 210.00 0.00 0.00

Gujarat GANDHI NAGAR TPS 5 0.00 210.00 0.00 0.00


Gujarat KUTCH LIG. TPS 1 0.00 70.00 0.00 0.00

Gujarat KUTCH LIG. TPS 2 0.00 70.00 0.00 0.00


Gujarat KUTCH LIG. TPS 4 0.00 0.00 75.00 0.00
Gujarat SIKKA REP. TPS 3 0.00 0.00 250.00 0.00

Gujarat SIKKA REP. TPS 4 0.00 0.00 250.00 0.00


Gujarat UKAI TPS 3 0.00 200.00 0.00 0.00
Gujarat UKAI TPS 4 0.00 0.00 200.00 0.00
Gujarat UKAI TPS 5 0.00 210.00 0.00 0.00
Gujarat UKAI TPS 6 0.00 0.00 500.00 0.00

Gujarat WANAKBORI TPS 1 0.00 210.00 0.00 0.00

Gujarat WANAKBORI TPS 2 0.00 210.00 0.00 0.00

Gujarat WANAKBORI TPS 3 0.00 210.00 0.00 0.00

Gujarat WANAKBORI TPS 4 0.00 210.00 0.00 0.00

Gujarat WANAKBORI TPS 5 0.00 210.00 0.00 0.00

Gujarat WANAKBORI TPS 6 0.00 210.00 0.00 0.00

Gujarat WANAKBORI TPS 7 0.00 210.00 0.00 0.00

Gujarat WANAKBORI TPS 8 0.00 0.00 800.00 0.00


Gujarat MUNDRA TPS-I & II 4 0.00 0.00 0.00 0.00

Gujarat MUNDRA TPS-I & II 5 0.00 660.00 0.00 0.00

Gujarat MUNDRA TPS-I & II 6 0.00 660.00 0.00 0.00

Gujarat SABARMATI (D-F 1 0.00 120.00 0.00 0.00


STATIONS)
Gujarat SURAT LIG. TPS 3 0.00 0.00 0.00 0.00

Madhya Pradesh KHARGONE STPP 2 0.00 660.00 0.00 0.00


Madhya Pradesh VINDHYACHAL STPS 11 0.00 0.00 500.00 0.00

Madhya Pradesh SANJAY GANDHI TPS 1 210.00 0.00 0.00 0.00

Madhya Pradesh SANJAY GANDHI TPS 4 0.00 0.00 210.00 0.00


Madhya Pradesh SANJAY GANDHI TPS 5 0.00 0.00 500.00 0.00
Madhya Pradesh SATPURA TPS 6 0.00 200.00 0.00 0.00
Madhya Pradesh SATPURA TPS 7 0.00 210.00 0.00 0.00
Madhya Pradesh SATPURA TPS 8 0.00 210.00 0.00 0.00

Madhya Pradesh SATPURA TPS 9 0.00 210.00 0.00 0.00


Madhya Pradesh SHREE SINGAJI TPP 1 0.00 600.00 0.00 0.00

Madhya Pradesh SHREE SINGAJI TPP 3 0.00 660.00 0.00 0.00

Madhya Pradesh SHREE SINGAJI TPP 4 0.00 660.00 0.00 0.00

Madhya Pradesh BINA TPS 1 0.00 0.00 250.00 0.00


Madhya Pradesh MAHAN TPP 1 0.00 600.00 0.00 0.00

Madhya Pradesh MAHAN TPP 2 0.00 600.00 0.00 0.00


Madhya Pradesh NIWARI TPP 1 0.00 45.00 0.00 0.00
Madhya Pradesh NIWARI TPP 2 0.00 45.00 0.00 0.00

Maharashtra MAUDA TPS 2 0.00 500.00 0.00 0.00

Maharashtra MAUDA TPS 3 0.00 0.00 660.00 0.00

Maharashtra MAUDA TPS 4 0.00 660.00 0.00 0.00

Maharashtra SOLAPUR 1 0.00 660.00 0.00 0.00

Maharashtra SOLAPUR 2 0.00 660.00 0.00 0.00


Maharashtra TARAPUR 1 160.00 0.00 0.00 0.00

Maharashtra BHUSAWAL TPS 3 0.00 0.00 0.00 210.00

Maharashtra BHUSAWAL TPS 4 0.00 500.00 0.00 0.00


Maharashtra BHUSAWAL TPS 5 0.00 500.00 0.00 0.00

Maharashtra CHANDRAPUR(MAH 3 0.00 0.00 210.00 0.00


ARASHTRA) STPS

Maharashtra CHANDRAPUR(MAH 9 0.00 0.00 500.00 0.00


ARASHTRA) STPS

Maharashtra KHAPARKHEDA TPS 2 0.00 0.00 210.00 0.00

Maharashtra KORADI TPS 6 0.00 210.00 0.00 0.00


Maharashtra KORADI TPS 7 0.00 210.00 0.00 0.00
Maharashtra KORADI TPS 8 0.00 660.00 0.00 0.00

Maharashtra NASIK TPS 3 0.00 210.00 0.00 0.00

Maharashtra NASIK TPS 4 0.00 210.00 0.00 0.00

Maharashtra NASIK TPS 5 0.00 210.00 0.00 0.00

Maharashtra PARLI TPS 6 0.00 250.00 0.00 0.00

Maharashtra PARLI TPS 7 0.00 250.00 0.00 0.00


Maharashtra PARLI TPS 8 0.00 250.00 0.00 0.00

Maharashtra AMARAVATI TPS 1 0.00 270.00 0.00 0.00


Maharashtra AMARAVATI TPS 2 0.00 270.00 0.00 0.00
Maharashtra AMARAVATI TPS 3 0.00 270.00 0.00 0.00

Maharashtra AMARAVATI TPS 4 0.00 270.00 0.00 0.00

Maharashtra AMARAVATI TPS 5 0.00 270.00 0.00 0.00


Maharashtra BELA TPS 1 0.00 270.00 0.00 0.00

Maharashtra BUTIBORI TPP 1 0.00 300.00 0.00 0.00


Maharashtra BUTIBORI TPP 2 0.00 300.00 0.00 0.00
Maharashtra DAHANU TPS 1 0.00 0.00 250.00 0.00

Maharashtra GEPL TPP Ph-I 1 0.00 60.00 0.00 0.00

Maharashtra GEPL TPP Ph-I 2 0.00 60.00 0.00 0.00

Maharashtra JSW RATNAGIRI TPP 3 0.00 300.00 0.00 0.00

Maharashtra MIHAN TPS 1 0.00 61.50 0.00 0.00

Maharashtra MIHAN TPS 2 0.00 61.50 0.00 0.00

Maharashtra MIHAN TPS 3 0.00 61.50 0.00 0.00

Maharashtra MIHAN TPS 4 0.00 61.50 0.00 0.00

Maharashtra NASIK (P) TPS 1 0.00 270.00 0.00 0.00

Maharashtra NASIK (P) TPS 2 0.00 270.00 0.00 0.00

Maharashtra NASIK (P) TPS 3 0.00 270.00 0.00 0.00

Maharashtra NASIK (P) TPS 4 0.00 270.00 0.00 0.00

Maharashtra NASIK (P) TPS 5 0.00 270.00 0.00 0.00

Maharashtra SHIRPUR TPP 1 0.00 150.00 0.00 0.00

Maharashtra TIRORA TPS 1 0.00 660.00 0.00 0.00

Maharashtra TIRORA TPS 4 0.00 660.00 0.00 0.00

Maharashtra TIRORA TPS 5 0.00 660.00 0.00 0.00

Maharashtra TROMBAY TPS 8 0.00 250.00 0.00 0.00

Maharashtra WARDHA WARORA 1 0.00 135.00 0.00 0.00


TPP
Total Western 420.00 24,849.00 7,905.00 760.00
Southern
Andhra Pradesh SIMHADRI 2 0.00 500.00 0.00 0.00

Andhra Pradesh SIMHADRI 4 0.00 0.00 500.00 0.00


Andhra Pradesh DAMODARAM 1 0.00 0.00 800.00 0.00
SANJEEVAIAH TPS
Andhra Pradesh Dr. N.TATA RAO TPS 1 0.00 0.00 210.00 0.00

Andhra Pradesh Dr. N.TATA RAO TPS 2 0.00 0.00 210.00 0.00

Andhra Pradesh Dr. N.TATA RAO TPS 3 0.00 0.00 210.00 0.00

Andhra Pradesh Dr. N.TATA RAO TPS 4 0.00 0.00 210.00 0.00

Andhra Pradesh Dr. N.TATA RAO TPS 5 0.00 0.00 210.00 0.00

Andhra Pradesh Dr. N.TATA RAO TPS 6 0.00 0.00 210.00 0.00

Andhra Pradesh RAYALASEEMA TPS 1 0.00 210.00 0.00 0.00


Andhra Pradesh RAYALASEEMA TPS 2 0.00 210.00 0.00 0.00

Andhra Pradesh RAYALASEEMA TPS 3 0.00 210.00 0.00 0.00


Andhra Pradesh RAYALASEEMA TPS 4 0.00 210.00 0.00 0.00

Andhra Pradesh RAYALASEEMA TPS 5 0.00 210.00 0.00 0.00


Andhra Pradesh RAYALASEEMA TPS 6 0.00 600.00 0.00 0.00

Andhra Pradesh PAINAMPURAM TPP 1 0.00 0.00 660.00 0.00

Andhra Pradesh PAINAMPURAM TPP 2 0.00 0.00 660.00 0.00

Andhra Pradesh SIMHAPURI TPS 1 0.00 150.00 0.00 0.00


Andhra Pradesh SIMHAPURI TPS 2 0.00 150.00 0.00 0.00

Andhra Pradesh SIMHAPURI TPS 3 0.00 150.00 0.00 0.00


Andhra Pradesh SIMHAPURI TPS 4 0.00 150.00 0.00 0.00
Andhra Pradesh THAMMINAPATNA 1 0.00 150.00 0.00 0.00
M TPS
Andhra Pradesh THAMMINAPATNA 2 0.00 150.00 0.00 0.00
M TPS
Karnataka KUDGI STPP 1 0.00 800.00 0.00 0.00

Karnataka KUDGI STPP 2 0.00 800.00 0.00 0.00

Karnataka KUDGI STPP 3 0.00 0.00 800.00 0.00

Karnataka BELLARY TPS 1 0.00 500.00 0.00 0.00

Karnataka BELLARY TPS 2 0.00 500.00 0.00 0.00


Karnataka BELLARY TPS 3 0.00 700.00 0.00 0.00

Karnataka RAICHUR TPS 1 0.00 0.00 210.00 0.00


Karnataka RAICHUR TPS 2 0.00 210.00 0.00 0.00
Karnataka RAICHUR TPS 3 0.00 0.00 210.00 0.00

Karnataka RAICHUR TPS 4 0.00 210.00 0.00 0.00


Karnataka RAICHUR TPS 5 0.00 210.00 0.00 0.00

Karnataka RAICHUR TPS 6 0.00 0.00 210.00 0.00


Karnataka RAICHUR TPS 7 0.00 210.00 0.00 0.00

Karnataka RAICHUR TPS 8 0.00 250.00 0.00 0.00

Karnataka YERMARUS TPP 1 0.00 800.00 0.00 0.00


Karnataka TORANGALLU 2 0.00 130.00 0.00 0.00
TPS(SBU-I)
Karnataka TORANGALLU 4 0.00 300.00 0.00 0.00
TPS(SBU-II)
Karnataka UDUPI TPP 1 0.00 600.00 0.00 0.00
Karnataka UDUPI TPP 2 0.00 600.00 0.00 0.00

Tamil Nadu NEYVELI TPS- I 2 0.00 50.00 0.00 0.00


Tamil Nadu NEYVELI TPS- I 4 0.00 50.00 0.00 0.00
Tamil Nadu NEYVELI TPS- I 8 0.00 100.00 0.00 0.00

Tamil Nadu NEYVELI TPS-II 1 0.00 0.00 210.00 0.00

Tamil Nadu NEYVELI TPS-II 2 0.00 0.00 210.00 0.00

Tamil Nadu NEYVELI TPS-II 4 210.00 0.00 0.00 0.00

Tamil Nadu NEYVELI TPS-II 5 0.00 0.00 210.00 0.00

Tamil Nadu NEYVELI TPS-II 6 0.00 210.00 0.00 0.00

Tamil Nadu NEYVELI TPS-II 7 210.00 0.00 0.00 0.00

Tamil Nadu NEYVELI TPS-II EXP 1 0.00 0.00 250.00 0.00

Tamil Nadu NEYVELI TPS-II EXP 2 0.00 0.00 250.00 0.00


Tamil Nadu VALLUR TPP 1 0.00 500.00 0.00 0.00

Tamil Nadu VALLUR TPP 2 0.00 500.00 0.00 0.00

Tamil Nadu VALLUR TPP 3 0.00 0.00 500.00 0.00

Tamil Nadu KUDANKULAM 1 1,000.00 0.00 0.00 0.00

Tamil Nadu MADRAS A.P.S. 1 0.00 220.00 0.00 0.00

Tamil Nadu METTUR TPS 2 210.00 0.00 0.00 0.00

Tamil Nadu METTUR TPS 3 0.00 0.00 210.00 0.00

Tamil Nadu METTUR TPS 4 0.00 0.00 210.00 0.00

Tamil Nadu NORTH CHENNAI 1 210.00 0.00 0.00 0.00


TPS
Tamil Nadu NORTH CHENNAI 5 0.00 0.00 600.00 0.00
TPS
Tamil Nadu TUTICORIN TPS 1 0.00 0.00 210.00 0.00

Tamil Nadu TUTICORIN TPS 3 0.00 0.00 210.00 0.00

Tamil Nadu TUTICORIN TPS 4 210.00 0.00 0.00 0.00

Tamil Nadu TUTICORIN TPS 5 0.00 210.00 0.00 0.00


Tamil Nadu ITPCL TPP 1 600.00 0.00 0.00 0.00

Tamil Nadu MUTHIARA TPP 1 0.00 600.00 0.00 0.00


Tamil Nadu MUTHIARA TPP 2 0.00 0.00 600.00 0.00
Tamil Nadu NEYVELI TPS(Z) 1 0.00 0.00 250.00 0.00

Tamil Nadu TUTICORIN (P) TPP 1 0.00 150.00 0.00 0.00

Tamil Nadu TUTICORIN (P) TPP 2 0.00 150.00 0.00 0.00

Telangana KOTHAGUDEM TPS 9 250.00 0.00 0.00 0.00


(NEW)
Telangana RAMAGUNDEM - B 1 0.00 0.00 62.50 0.00
TPS
Telangana SINGARENI TPP 1 0.00 600.00 0.00 0.00

Total Southern 2,900.00 13,210.00 9,292.50 0.00


Eastern
Bihar BARAUNI TPS 6 0.00 105.00 0.00 0.00

Bihar BARAUNI TPS 7 0.00 105.00 0.00 0.00


Bihar BARAUNI TPS 8 0.00 0.00 250.00 0.00
Bihar BARAUNI TPS 9 0.00 250.00 0.00 0.00

Bihar BARH II 4 0.00 0.00 0.00 0.00

Bihar MUZAFFARPUR TPS 1 0.00 110.00 0.00 0.00


Bihar MUZAFFARPUR TPS 2 0.00 110.00 0.00 0.00

Bihar MUZAFFARPUR TPS 3 0.00 0.00 195.00 0.00


Bihar NABI NAGAR TPP 3 0.00 250.00 0.00 0.00
Jharkhand BOKARO `B` TPS 3 0.00 210.00 0.00 0.00

Odisha DARLIPALI STPS 1 0.00 800.00 0.00 0.00

Odisha DERANG TPP 2 0.00 600.00 0.00 0.00


Odisha KAMALANGA TPS 3 0.00 0.00 350.00 0.00

Odisha STERLITE TPP 1 0.00 600.00 0.00 0.00


Odisha UTKAL TPP (IND 1 0.00 350.00 0.00 0.00
BARATH)
West Bengal DURGAPUR TPS 4 0.00 210.00 0.00 0.00

West Bengal MEJIA TPS 1 0.00 0.00 0.00 210.00

West Bengal MEJIA TPS 2 0.00 0.00 0.00 210.00

West Bengal MEJIA TPS 6 0.00 0.00 0.00 250.00

West Bengal RAGHUNATHPUR 1 0.00 0.00 0.00 600.00


TPP
West Bengal BAKRESWAR TPS 5 210.00 0.00 0.00 0.00

West Bengal BANDEL TPS 1 0.00 0.00 0.00 60.00

West Bengal BANDEL TPS 2 0.00 0.00 0.00 60.00

West Bengal KOLAGHAT TPS 1 0.00 210.00 0.00 0.00

West Bengal KOLAGHAT TPS 2 0.00 210.00 0.00 0.00


West Bengal KOLAGHAT TPS 3 0.00 210.00 0.00 0.00

West Bengal KOLAGHAT TPS 5 0.00 0.00 0.00 210.00


West Bengal KOLAGHAT TPS 6 0.00 0.00 0.00 210.00

West Bengal SAGARDIGHI TPS 2 0.00 300.00 0.00 0.00

West Bengal HIRANMAYE TPP 1 0.00 150.00 0.00 0.00


West Bengal HIRANMAYE TPP 2 0.00 150.00 0.00 0.00
West Bengal SOUTHERN REPL. 1 0.00 0.00 67.50 0.00
TPS
West Bengal SOUTHERN REPL. 2 0.00 67.50 0.00 0.00
TPS
West Bengal TITAGARH TPS 1 0.00 60.00 0.00 0.00

West Bengal TITAGARH TPS 2 0.00 60.00 0.00 0.00

West Bengal TITAGARH TPS 3 0.00 60.00 0.00 0.00

West Bengal TITAGARH TPS 4 0.00 60.00 0.00 0.00

Total Eastern 210.00 5,237.50 862.50 1,810.00


Total 4,954.00 47,636.50 26,865.00 3,230.00
7-2020
Sub-Report-10

Date& Time of Expected/sync


Maintenance Date of Return
Reasons/Present Status
DD/MM/YYYY DD/MM/YYYY
HH24:MM HH24:MM
8 9 10

06/07/2020 00:00 RESERVE SHUT DOWN /


STANDBY UNIT
24/03/2020 20:45 RESERVE SHUT DOWN /
STANDBY UNIT
05/07/2020 00:13 RESERVE SHUT DOWN /
STANDBY UNIT
19/06/2020 21:53 WATER WALL TUBE LEAKAGE

05/07/2020 01:51 RSD/LOW SCHEDULE


05/07/2020 01:28 RSD/LOW SCHEDULE
05/07/2020 04:25 RSD/LOW SCHEDULE

05/07/2020 06:48 RSD/LOW SCHEDULE


05/07/2020 03:31 RSD/LOW SCHEDULE

05/07/2020 03:58 RSD/LOW SCHEDULE


04/07/2020 19:09 BOILER MISC. PROBLEM
03/07/2020 18:12 TURBINE VIBRATIONS HIGH

04/07/2020 23:44 RSD/LOW SCHEDULE

05/07/2020 06:59 06/07/2020 20:41 RSD/LOW SCHEDULE


05/07/2020 06:37 RSD/LOW SCHEDULE

05/07/2020 07:25 06/07/2020 12:30 RSD/LOW SCHEDULE


04/07/2020 22:46 06/07/2020 08:10 RSD/LOW SCHEDULE

04/07/2020 23:10 RSD/LOW SCHEDULE


05/07/2020 14:31 CONDENSER LOW VACCUM
05/07/2020 22:53 06/07/2020 01:17 C&I PROBLEM
09/10/2004 22:58 GENERATOR EARTH FAULT
01/07/2020 00:15 REACTOR MAINTENANCE
WORKS.
01/07/2020 16:15 AIR PREHEATERS PROBLEM
05/07/2020 15:13 06/07/2020 01:02 ELECTRICAL MISCELLANEOUS
PROBLEMS
20/06/2020 00:00 BOILER OVERHAUL/ ANNUAL
MAINTENANCE
11/07/2014 08:20 UNIT LIKELY TO BE
SCRAPPED.
27/01/2016 15:27 UNIT LIKELY TO BE
SCRAPPED.
29/06/2020 14:10 WATER WALL TUBE LEAKAGE
04/03/2020 14:22 FUEL OIL PROBLEM
13/05/2020 08:15 RSD/LOW SCHEDULE

11/05/2020 22:11 RSD/LOW SCHEDULE


10/05/2020 19:04 RSD/LOW SCHEDULE
26/11/2019 17:30 RSD/LOW SCHEDULE

06/03/2020 13:53 RSD/LOW SCHEDULE


30/04/2020 10:50 TURBINE MISC. PROBLEMS

14/06/2020 07:02 BOILER MISC. PROBLEM

06/07/2020 08:00 BOILER MISC. PROBLEM


30/05/2020 19:50 CONSERVATION OF MAIN
FUEL/RSD
03/06/2020 23:51 CONSERVATION OF MAIN
FUEL/RSD
15/02/2020 00:00 CONSERVATION OF MAIN
FUEL/RSD
05/07/2020 09:21 RSD/LOW SCHEDULE
05/07/2020 11:54 RSD/LOW SCHEDULE

06/07/2020 09:39 06/07/2020 23:46 BOILER MISC. PROBLEM


01/07/2020 21:22 06/07/2020 00:11 WATER WALL TUBE LEAKAGE

05/07/2020 19:48 WATER WALL TUBE LEAKAGE


13/11/2019 14:13 HYDROGEN PRESSURE
PROBLEM
07/01/2020 16:15 RSD/LOW SCHEDULE

26/06/2010 13:25 R AND M / REFURBISHMENT


WORKS
01/07/2020 11:16 BOILER MISC. PROBLEM
04/03/2018 08:50 R AND M / REFURBISHMENT
WORKS
07/07/2016 17:59 R AND M / REFURBISHMENT
WORKS
30/12/2019 21:32 R AND M / REFURBISHMENT
works
27/06/2020 20:47 AIR PREHEATERS PROBLEM
03/07/2020 00:00 WATER WALL TUBE LEAKAGE

06/07/2020 03:13 06/07/2020 07:20 GRID MISCELLANEOUS


24/05/2020 11:47 GT/WHRB/ST PLANNED
OVERHAUL

03/06/2020 13:28 RSD/LOW SCHEDULE

09/01/2020 17:02 ASH HANDLING SYSTEM


PROBLEM
30/06/2020 00:00 RSD/LOW SCHEDULE

18/05/2020 12:00 Low system demand/ costly


fuel
02/07/2020 07:37 WATER WALL TUBE LEAKAGE
15/10/2012 00:28 NO Power purchase

15/10/2012 00:28 agreement

01/07/2020 00:00 COAL SHORTAGE


02/07/2020 16:18 06/07/2020 17:15 COAL SHORTAGE

04/07/2020 10:21 AIR PREHEATERS PROBLEM


06/07/2020 01:50 Low system demand/ costly
fuel
07/04/2020 00:00 COAL SHORTAGE

21/06/2020 02:41 MISCELLANEOUS PLANNED


MAINTENANCE
19/10/2014 04:30 NO Power purchase
agreement
29/03/2020 00:00 NON AVAILABILITY OF MAN
POWER
01/04/2015 00:20 NO Power purchase
agreement
15/04/2020 00:00 COAL SHORTAGE
25/05/2020 12:04 COAL SHORTAGE
30/06/2020 07:46 GENERATOR MISCLLANEOUS
MAINTENANCE
20/03/2019 15:40 RSD/LOW SCHEDULE
30/06/2020 15:22 REACTOR MAINTENANCE
WORKS.
04/07/2020 22:57 P.A. FANS PROBLEM

06/07/2020 23:30 RSD/LOW SCHEDULE

06/07/2020 20:42 RSD/LOW SCHEDULE

22/03/2020 08:24 RSD/LOW SCHEDULE

22/03/2020 08:21 RSD/LOW SCHEDULE

23/03/2020 16:55 RSD/LOW SCHEDULE


17/08/2019 20:24 LIGNITE SHORTAGE

29/09/2019 00:00 LIGNITE SHORTAGE


28/06/2020 12:31 06/07/2020 14:00 AIR PREHEATERS PROBLEM
06/07/2020 08:00 RSD/LOW SCHEDULE

05/07/2020 11:07 RSD/LOW SCHEDULE


24/03/2020 07:55 RSD/LOW SCHEDULE
01/07/2020 19:38 RSD/LOW SCHEDULE
24/03/2020 09:36 RSD/LOW SCHEDULE
02/07/2020 23:50 RESERVE SHUT DOWN /
STANDBY UNIT
20/03/2020 11:05 RESERVE SHUT DOWN /
STANDBY UNIT
03/03/2020 18:15 RESERVE SHUT DOWN /
STANDBY UNIT
26/03/2020 13:30 RESERVE SHUT DOWN /
STANDBY UNIT
20/03/2020 11:07 RESERVE SHUT DOWN /
STANDBY UNIT
22/03/2020 08:03 RESERVE SHUT DOWN /
STANDBY UNIT
20/03/2020 14:25 RESERVE SHUT DOWN /
STANDBY UNIT
22/03/2020 11:25 RESERVE SHUT DOWN /
STANDBY UNIT
06/07/2020 06:05 RESERVE SHUT DOWN /
STANDBY UNIT
06/07/2020 23:40 RSD/LOW SCHEDULE

01/06/2020 00:01 NO Power purchase


agreement
26/03/2020 00:00 06/07/2020 16:35 ABNORMAL BOILER
OPERATIONAL PARAMETER
05/06/2020 00:00 RESERVE SHUT DOWN /
STANDBY UNIT
02/07/2020 09:33 06/07/2020 11:24 BOILER MISC. PROBLEM

04/04/2020 00:00 RSD/LOW SCHEDULE


05/07/2020 22:57 WATER WALL TUBE LEAKAGE

20/06/2020 00:29 BOILER OVERHAUL/ ANNUAL


MAINTENANCE
05/07/2020 11:02 WATER WALL TUBE LEAKAGE
05/07/2020 07:55 WATER WALL TUBE LEAKAGE
27/03/2020 17:30 RSD/LOW SCHEDULE
19/03/2020 20:08 RSD/LOW SCHEDULE
29/02/2020 23:54 RSD/LOW SCHEDULE

22/02/2020 02:52 WATER WALL TUBE LEAKAGE


02/06/2020 12:15 RESERVE SHUT DOWN /
STANDBY UNIT
21/03/2020 15:43 RSD/LOW SCHEDULE

30/05/2020 15:42 RSD/LOW SCHEDULE

02/07/2020 23:56 WATER WALL TUBE LEAKAGE


10/05/2020 19:09 RSD/LOW SCHEDULE

10/05/2020 11:32 RSD/LOW SCHEDULE


20/06/2020 00:34 RSD/LOW SCHEDULE
27/07/2019 00:24 RSD/LOW SCHEDULE

23/03/2020 12:38 CONSERVATION OF MAIN


FUEL/RSD
05/07/2020 08:04 RSD/LOW SCHEDULE

26/03/2020 00:23 CONSERVATION OF MAIN


FUEL/RSD
24/02/2020 13:59 CONSERVATION OF MAIN
FUEL/RSD
23/03/2020 11:12 RSD/LOW SCHEDULE
08/01/2020 00:00 ENMASS REFUELLING

01/09/2019 17:57 Low system demand/ costly


fuel
01/06/2020 07:15 RSD/LOW SCHEDULE
01/06/2020 12:21 RSD/LOW SCHEDULE

05/07/2020 20:40 FURNACE DRAFT ABNORMAL

04/07/2020 13:31 RSD/LOW SCHEDULE

24/06/2020 11:34 STATOR/ STATOR EARTH


FAULT
06/09/2019 15:41 RSD/LOW SCHEDULE
27/08/2019 09:52 RSD/LOW SCHEDULE
31/05/2020 22:56 MAIN STEAM LINE PROBLEM

17/02/2020 00:00 RESERVE SHUT DOWN /


STANDBY UNIT
25/03/2020 19:47 RESERVE SHUT DOWN /
STANDBY UNIT
12/12/2019 10:40 RESERVE SHUT DOWN /
STANDBY UNIT
21/03/2020 17:31 RSD/LOW SCHEDULE

12/05/2020 19:34 RSD/LOW SCHEDULE


01/06/2020 13:13 RSD/LOW SCHEDULE

04/03/2020 19:30 RSD/LOW SCHEDULE


09/03/2020 20:15 RSD/LOW SCHEDULE
11/02/2020 18:00 RSD/LOW SCHEDULE

12/11/2019 00:00 RSD/LOW SCHEDULE

11/02/2020 19:30 RSD/LOW SCHEDULE


28/08/2018 21:26 NO Power purchase
agreement
29/12/2018 00:30 COAL SHORTAGE
17/01/2019 00:15 COAL SHORTAGE
28/06/2020 00:00 RESERVE SHUT DOWN /
STANDBY UNIT
29/06/2013 00:00 NO Power purchase
agreement
20/06/2013 20:27 NO Power purchase
agreement
30/04/2020 15:13 RSD/LOW SCHEDULE

10/01/2013 15:50 NO Power purchase


agreement
05/11/2013 11:53 NO Power purchase
agreement
10/06/2013 18:00 NO Power purchase
agreement
20/08/2013 10:00 NO Power purchase
agreement
04/03/2014 18:10 NO Power purchase
agreement
16/02/2017 00:46 NO Power purchase
agreement
14/04/2017 01:45 NO Power purchase
agreement
20/05/2017 00:25 NO Power purchase
agreement
30/05/2017 15:24 NO Power purchase
agreement
28/09/2017 21:14 NO Power purchase
agreement
03/06/2020 15:02 RESERVE SHUT DOWN /
STANDBY UNIT
12/06/2020 10:30 RESERVE SHUT DOWN /
STANDBY UNIT
04/06/2020 12:29 RESERVE SHUT DOWN /
STANDBY UNIT
11/04/2020 16:55 RESERVE SHUT DOWN /
STANDBY UNIT
16/02/2016 17:19 NO Power purchase
agreement
19/05/2020 12:11 CONSERVATION OF MAIN
FUEL/RSD
05/07/2020 23:59 WATER WALL TUBE LEAKAGE
03/07/2020 20:26 RESERVE SHUT DOWN /
STANDBY UNIT
22/06/2020 23:13 RESERVE SHUT DOWN /
STANDBY UNIT
22/06/2020 22:35 RESERVE SHUT DOWN /
STANDBY UNIT
25/06/2020 22:50 RESERVE SHUT DOWN /
STANDBY UNIT
22/06/2020 21:30 RESERVE SHUT DOWN /
STANDBY UNIT
25/06/2020 21:49 RESERVE SHUT DOWN /
STANDBY UNIT
25/06/2020 20:12 RESERVE SHUT DOWN /
STANDBY UNIT
04/03/2020 22:50 RSD/LOW SCHEDULE
22/02/2020 20:47 RSD/LOW SCHEDULE

07/06/2020 22:22 RSD/LOW SCHEDULE


01/03/2020 19:24 RSD/LOW SCHEDULE

18/02/2020 20:26 RSD/LOW SCHEDULE


26/03/2020 00:00 ABNORMAL BOILER
OPERATIONAL PARAMETER
06/07/2020 12:30 BOILER MISC. PROBLEM

26/06/2020 02:01 WATER WALL TUBE LEAKAGE

18/03/2017 00:08 RSD/LOW SCHEDULE


27/05/2018 11:06 RSD/LOW SCHEDULE

27/05/2018 03:01 RSD/LOW SCHEDULE


07/04/2017 05:25 RSD/LOW SCHEDULE
04/05/2018 00:16 RSD/LOW SCHEDULE

30/04/2018 20:24 RSD/LOW SCHEDULE

07/04/2020 12:37 CONSERVATION OF MAIN


FUEL/RSD
27/03/2020 09:36 CONSERVATION OF MAIN
FUEL/RSD
02/07/2020 19:02 RSD/LOW SCHEDULE

02/06/2020 13:44 RSD/LOW SCHEDULE

02/06/2020 16:31 RSD/LOW SCHEDULE


06/04/2020 13:15 RESERVE SHUT DOWN /
STANDBY UNIT
02/07/2020 11:48 RSD/LOW SCHEDULE
19/05/2020 11:39 RSD/LOW SCHEDULE
01/07/2020 00:15 RSD/LOW SCHEDULE

12/06/2020 20:00 RSD/LOW SCHEDULE


13/06/2020 19:45 RSD/LOW SCHEDULE

05/07/2020 10:24 RSD/LOW SCHEDULE


02/06/2020 07:34 RSD/LOW SCHEDULE

29/04/2020 00:00 GENERATOR PROTECTION


RELAY OPERATION PROBLEM
03/06/2020 13:15 WATER WALL TUBE LEAKAGE
12/04/2020 00:00 RSD/LOW SCHEDULE

29/12/2019 15:49 RESERVE SHUT DOWN /


STANDBY UNIT
03/06/2020 13:23 RSD/LOW SCHEDULE
07/05/2020 10:36 RSD/LOW SCHEDULE

20/06/2020 17:23 RSD/LOW SCHEDULE


14/05/2020 09:34 ESP PROBLEM
04/06/2020 15:36 WATER WALL TUBE LEAKAGE

01/07/2020 00:39 WATER WALL TUBE LEAKAGE

02/07/2020 11:42 BOILER AUX. MISC.


PROMLEMS
01/07/2020 14:46 MISCELLANEOUS PLANNED
MAINTENANCE
30/06/2020 09:31 BOILER AUX. MISC.
PROMLEMS
07/05/2020 16:41 BOILER AUX. MISC.
PROMLEMS
01/07/2020 15:21 MISCELLANEOUS PLANNED
MAINTENANCE
24/06/2020 15:16 SUPER HEATER TUBE
LEAKAGE
29/06/2020 20:56 BOILER MISC. PROBLEM
07/06/2020 17:58 RESERVE SHUT DOWN /
STANDBY UNIT
06/06/2020 19:22 RESERVE SHUT DOWN /
STANDBY UNIT
27/06/2020 01:45 RESERVE SHUT DOWN /
STANDBY UNIT
31/05/2020 00:22 MISC. SHORT DURATION
PLANNED MAINTENACE
30/01/2018 16:30 REACTOR MAINTENANCE
WORKS.
27/06/2020 09:30 RESCHEDULED ANNUAL
MAINTENANCE
03/07/2020 09:43 RESERVE SHUT DOWN /
STANDBY UNIT
26/06/2020 10:53 RESERVE SHUT DOWN /
STANDBY UNIT
22/06/2020 22:45 MISCELLANEOUS PLANNED
MAINTENANCE
26/06/2020 09:46 BOILER AUX. MISC.
PROMLEMS
27/06/2020 09:00 RESERVE SHUT DOWN /
STANDBY UNIT
04/07/2020 09:03 RESERVE SHUT DOWN /
STANDBY UNIT
06/07/2020 00:00 BOILER OVERHAUL/ ANNUAL
MAINTENANCE
03/11/2019 22:02 TURBINE MISC. PROBLEM
01/06/2020 01:23 RESERVE SHUT DOWN /
STANDBY UNIT
05/04/2020 16:11 COAL SHORTAGE
04/07/2020 08:59 WATER WALL TUBE LEAKAGE
26/06/2020 22:50 ELECTRICAL MISCELLANEOUS
PROBLEMS
03/04/2016 00:31 NO Power purchase
agreement
16/04/2016 01:42 NO Power purchase
agreement
04/06/2020 02:24 BOILER OVERHAUL/ ANNUAL
MAINTENANCE
01/07/2020 20:01 RSD/LOW SCHEDULE

01/06/2020 03:30 RSD/LOW SCHEDULE

25/02/2020 06:56 ELECTRICAL MISCELLANEOUS


PROBLEMS
28/05/2020 07:04 RSD/LOW SCHEDULE
04/07/2020 12:00 WATER WALL TUBE LEAKAGE
31/03/2018 19:54 NON-READINESS OF
RESIDUAL WORKS OF NEW
06/07/2020 23:33 UNIT
WATER WALL TUBE LEAKAGE

11/12/2019 23:12 RSD/LOW SCHEDULE


19/10/2019 22:12 ELECTRICAL MISCELLANEOUS
PROBLEMS
06/07/2020 02:35 06/07/2020 18:48 WATER WALL TUBE LEAKAGE
24/04/2020 12:54 A.V.R. PROBLEM
12/09/2019 03:22 ASH HANDLING SYSTEM
PROBLEM
10/06/2020 13:15 WATER WALL TUBE LEAKAGE

29/04/2020 01:15 I.D. FANS PROBLEM


03/07/2020 00:00 COAL SHORTAGE

23/11/2018 00:22 TURBINE VIBRATIONS HIGH


01/05/2017 00:00 Other Commercial Reason

02/03/2020 17:42 WATER WALL TUBE LEAKAGE

10/03/2020 23:25 Low system demand/ costly


fuel
23/06/2020 13:32 Low system demand/ costly
fuel
28/06/2020 01:28 Low system demand/ costly
fuel
23/06/2020 23:00 Low system demand/ costly
fuel
01/07/2020 00:12 BOILER INSPECTION/ RE-
CERTIFICATION
04/06/2020 18:26 Low system demand/ costly
fuel
01/07/2020 09:39 Low system demand/ costly
fuel
07/06/2018 17:28 ESP PROBLEM

26/12/2019 22:48 E.S.P.MISCELLANEOUS


13/06/2020 15:15 ASH HANDLING SYSTEM
PROBLEM
23/06/2020 12:08 Low system demand/ costly
fuel
16/01/2020 23:37 Low system demand/ costly
fuel
18/03/2020 12:20 ELECTRICAL MISCELLANEOUS
PROBLEMS
06/12/2018 12:31 COAL SHORTAGE
31/12/2017 21:12 COAL SHORTAGE
06/07/2020 16:38 RESERVE SHUT DOWN /
STANDBY UNIT
15/01/2020 21:04 RESERVE SHUT DOWN /
STANDBY UNIT
10/10/2016 04:57 RESERVE SHUT DOWN /
STANDBY UNIT
09/10/2016 04:57 RESERVE SHUT DOWN /
STANDBY UNIT
10/10/2016 04:18 RESERVE SHUT DOWN /
STANDBY UNIT
09/10/2016 05:36 RESERVE SHUT DOWN /
STANDBY UNIT

Вам также может понравиться