Date – 13/08/2016
SYSTEM DESIGN
PROJECT SCOPE
Design , Engineering, Supply and Installation of 25 HP, 20 HP, SOLAR Pump PV POWER PLANT
CUSTOMER REQUIREMET
i. DESIGN ASSUMPTIONS
1. The average annual isolation as per meteorological data available from NASA’s
Atmospheric Science Data centre is 5.18 Kwh/m²/day.
2. The module mounting Structure is ground/tarrace
mountable.
3. The Solar Panels will be cleaned manually and periodically by the customer.
4. Customer will provide suitable location near to the System Electronics for making earth pit
PROPOSED TECHNOLOGY
The solar Pump photovoltaic power plant to be proposed shall be consisting of Crystalline
Technology solar modules with fixed system and the solar inverters & Controllers.
BENEFITS OF PROPOSED ---Technology
The benefit of crystalline module technology as compared to other existing technologies is as
follows proven technology over many years. Abundant semiconductor materials to support high
volume production and demand. High volumes of production facilities throughout world.
cd
e
SSYSTEM DESCRIPTION
PRODUCT DESCRIPTION
The Solar Power Generating System consists of Solar Photovoltaic Modules to
generate DC Electricity. The inverter/Cotroller would convert the DC power into AC power.
This AC power is supplied to the load.
TECHNOLOGY OVERVIEW
Solar PV modules are semiconductor devices which generate electricity when exposed to
sun light. In a SPV module a large number of such cells are connected in series. The
electrons flow from one cell to next through a conductor. In the next cell they are
further struck by photons and acquire more potential energy and sweep out of the cell
and so on. Finally the electron leaves the last cell of the module and flow through the load.
Crystalline are most widely used technologies.
COMPONENT SPECIFICATION
The major components of the proposed power plant are as follows:
SOLAR PV MODULE
PROTECTION:
Grounding As per IS
Lightening As per IS
Material Copper / Aluminium conductor with earth pit.
CABLES:
The size of the cables between array interconnections, array to junction boxes, junction
boxes to Inverter etc is so selected to keep the voltage drop and losses to the minimum. The copper
conductors that offer low conductor resistance, they result in lower heating thereby.
BILL OF MATERIALS
SL No MATERIALS QUANTITY
1 Solar PV Modules -250 Wp 250Wp As Per System
2 Solar Inverter SMA/Delta/KACO Make. 2 No
3 Supporting structures for modules Galvanised As per requirement
4 Array disconnection facility As per requirement
5 DC Distribution Board ( DCDB) 1 Set
6 AC Distribution Board 1 Set
7 Circuit breakers As per requirement
8 Earth protection systems As per requirement
9 Data acquisition and monitoring system (optional) No.
10 Nuts, bolts, washers As per requirement
11 Cables & accessories 4 and 6 sq.mm Polycab Make As per requirement
12 Special tools and tackles As per requirement
13 Operational and maintenance manual 1 Set
14 Documentations as specified 1 Set
15 Land Area required for 25 H 250 sq. mtr & 20 H 200 As per requirement
Sq. Mtr.
16 Complete set of drawings 1 Set
PRICE DETAILS:
Note:
1. Taxes will be Including.
2. Five years Non-Comprehensive AMC is included in above mentioned cost.
All standard “Force Majeure” clauses will apply on this transaction
Cost details:
30% advance for mobilization along with Purchase Order.
60% & freight After receipt of material at site.
10% after erection & Commissioning of the system at site.
Warranty:-
The entire system is warranted for 2 years from the date of Installation or 30 months
from the date of Invoice whichever is earlier.
PV Modules – Power output warranty 20 Years (Conditional warranty)
Inverter – As per Manufactures original warranty
Thanking you and assuring our best of attention at all the time.
Yours Truly,
RAHUL KUMBHAR
Mob 7030909035
Email ID – rahul@neptunegreen.com
Guidelines:-
Commercial Policy:-
80% efficiency of the solar system will be rest of the life of Solar Modules.