This is an effort of the team with the participation of management, supervisors and employees
FORMTEXT
Company name: Foreman/Project Manager:
EMERGENCY PROTOCOLS
Emergency phone number: Emergency radio station:
Location of fire extinguishers: Location of eye rinse solutions: Location of the first aid kit:
OPERATIONS INVOLVING A RISK OF DEATH Check all the answers that apply. No operation with a risk of death applies
Entering a confined space Cranes and rigging Electrical installation Handling equipment Dangerous Energy Control/Breaker
Explosion Head breaker Work permit Dangerous Grutting Radiation work Grid drop/floor plate/bodyguard Sharp-
stitching
Hot work Powered Locking and Entering a confined Overhead power lines Excavation and digging Working
electrical equipment labelling space on roofs
MANDATORY PREVENTION PLANS Check all the answers that apply. OTHERS OBLIGATORY Check all the answers that apply.
Other:
ELEMENTS
No mandatory prevention plan Other: No other mandatory items Back-up plan Gas monitoring
Chrome
Radiation Silica Fall protection work plan Barriers Signage Labels Security data sheet
hexavalent
PARTICIPANTS IN THE Participation in a pre-intervention meeting is mandatory before signing the confirmation form prior to the completion of the intervention.
INTERVENTION
Pre-intervention confirmation form (to be completed after completing the back of this form) Confirmation form after the
intervention is completed
Skill needed for intervention
Signing prior to the completion of the
Team member's name Driver of cranes, equipment, forklift, site signaller, Were you hurt? Initial
intervention
spotter, signaller, rigger, etc.
S/O No Yes
S/O No Yes
S/O No Yes
S/O No Yes
S/O No Yes
S/O No Yes
S/O No Yes
S/O No Yes
S/O No Yes
S/O No Yes
MANAGEMENT'S INVOLVEMENT IN THE DISTRIBUTION Complete this section when members of management attend or verify the details of the security task
OF SECURITY-RELATED TASKS allocation meeting.
Management participated in the security-related task allocation meeting Management has verified that the work in progress is consistent with the details of the
distribution of security tasks
Comments:
FINAL VERIFICATION Before finalizing and signing the security task allocation form, review the necessary measures and/or training opportunities.
Signature of the foreman or project manager: Signature of the general foreman/site manager:
Review the "Steps of Intervention" listed above and What steps can be taken to keep staff out of the line of fire in carrying out
LINE OF FIRE HAZARDS determine if any of them pose a danger to body parts.
LINE OF FIRE PREVENTION this task?
More effectiveMoins effective Describe the prevention measures or
Parts of the body measures
at risk Can the danger Can a tool be Can the Can the stages of the
be eliminated? used instead? danger be intervention or professional
Source of danger Describe the dangers of the line of fire
Locking/labelling, Cables, pushers, isolated? practices be improved?
ground work, etc. etc. Barriers, Hand placement, ergonomics,
Hands Other
protective etc.
devices, etc.
Stuck?
Hit?
Pinched?
Crushed?
Burned or opened?
Coupé(s) ?
Other?
PERSONAL PROTECTIVE EQUIPMENT Check all the answers that apply in addition to the standard PPE requirements. No additional PPE required
Standard EPI requirements Dress/Body Eyes/Visage Feet Main Hearing Respiratory functions Other
Safety shoes (covering the ankle) Fire retardant Protective Metatarsal Cut-resistant protection Disposable protection
High-visibility jacket or outfit protection visor Earplugs
Electrically insulated Chemical-resistant Air-supply device
Pants Welder mask protection protection