Вы находитесь на странице: 1из 35

TOTAL TIME ANALYSIS

Tijara#1 Meterage (m) 84 m 417 m 198 m 156 m 51 m


Spudded on 16-March-2019 Depth @ 24:00 hrs(m) 84 m 501 m 699 m 855 m 906 m
Tijara#1 DAYS 1 2 3 4 5

18-Jan-20 19-Jan-20 20-Jan-20 21-Jan-20 22-Jan-20


TOTAL HOURS CODE ACTIVITY
3.50 1 Rig Up / Rig Down
430.75 2 Drilling 2.50 13.50 5.75 10.50 15.50
150.00 3 Reaming 1.50 10.50 5.75 4.00 1.25
0.00 4 Coring
49.00 5 Circulation 0.50
222.50 6 Tripping 10.25 7.25 5.75
2.50 7 Lubricate Rig
34.00 8 Repairs 0.75 0.50
12.75 9 Cut and slip drill line
0.00 10 Deviation Survey
14.00 11 Wireline logging
68.50 12 Casing & Cementation
42.00 13 Waiting on Cement
17.75 14 Nipple up BOP
0.50 15 Test BOP
0.00 16 DST
0.00 17 Plug back
0.00 18 Squeeze Cement
0.00 19 Fishing
0.00 20 Directional Work
34.25 21 Miscellaneous 1.00 1.75 1.50
2.00 22 Test Equipment
0.00 23 Production Testing
1084.00 Total 4.00 24.00 24.00 24.00 24.00
PHASE Hours DAYS
12 ¼" Phase 96.00 4.00
8 ½" Phase 624.00 26.00
Well testing 1349.50 56.23
Total 2069.50 86.23

ACTIVITY % TOTAL HOURS


Rig Up / Rig Down 0.32 3.50
Drilling 39.74 430.75
Reaming 13.84 150.00
Coring 0.00 0.00
Circulation 4.52 49.00
Tripping 20.53 222.50
Lubricate Rig 0.23 2.50
Repairs 3.14 34.00
Cut and slip drill line 1.18 12.75 TOTAL TIME ANALY
Deviation Survey
Wireline logging
0.00
1.29
0.00
14.00
WELL: Tiraja-1
Casing & Cementation 6.32 68.50 Total Hours: 2069.5
Wait on Cement 3.87 42.00
Nipple up BOP 1.64 17.75
Test BOP 0.05 0.50
DST 0.00 0.00
Plug back 0.00 0.00
Squeeze Cement 0.00 0.00
Fishing 0.00 0.00
Directional Work 0.00 0.00
Miscellaneous 3.16 34.25
Test Equipment 0.18 2.00
Production testing 0.00 0.00
TOTAL 100.00 1084.00
124 m 207 m 117 m 355 m 285 m 106 m 0m 0m 0m 0m
1030 m 1237 m 1354 m 1709 m 1994 m 2100 m 2100 m 2100 m 2100 m 2100 m
6 7 8 9 10 11 12 13 14 15

23-Jan-20 24-Jan-20 25-Jan-20 26-Jan-20 27-Jan-20 28-Jan-20 29-Jan-20 30-Jan-20 31-Jan-20 1-Feb-20

20.75 14.00 7.00 12.75 16.50 7.25


3.25 5.25 3.25 9.25 7.50 5.75

2.00 1.00 3.75 3.50 4.00


2.75 10.50 5.75 12.50

1.00 2.00 1.50 1.50


1.00

2.50 17.00 5.00


18.00 6.00
10.25

1.25 3.00 3.00 6.75


1.00 1.00

24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00

OTAL TIME ANALYSIS


WELL: Tiraja-1
otal Hours: 2069.50 Hrs.
Wait on Cement Nipple up BOP Test BOP Miscellaneous
4% 2% 0% 3%
Casing & Cementation
6%
Wireline logging Drilling
1% 40%
Cut and slip drill line
1%
Repairs
3%
Tripping
21%

Reaming
14%
6%
Wireline logging Drilling
1% 40%
Cut and slip drill line
1%
Repairs
3%
Tripping
21%

Reaming
14%

Circulation
5%
0m 208 m 66 m 235 m 62 m 281 m 141 m 55 m 168 m 0m 55 m
2100 m 2308 m 2374 m 2609 m 2671 m 2952 m 3093 m 3148 m 3316 m 3316 m 3371 m
16 17 18 19 20 21 22 23 24 25 26

2-Feb-20 3-Feb-20 4-Feb-20 5-Feb-20 6-Feb-20 7-Feb-20 8-Feb-20 9-Feb-20 10-Feb-20 11-Feb-20 12-Feb-20

9.50 5.25 18.00 5.00 16.75 20.25 11.25 19.25 10.75


8.50 7.50 6.00 2.25 7.25 3.50 1.25 4.25 1.25

3.00 1.00 1.25 3.00 0.50 2.75 0.50


8.50 3.00 0.50 5.75 6.75 13.25 11.50
1.00
1.00 9.75 9.75 0.25 1.75
1.00 5.00

7.50
0.50

5.50 2.00

24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00
81 m 66 m 39 m 0m 104 m 63 m 62 m 29 m 0m 52 m
3452 m 3518 m 3557 m 3557 m 3661 m 3724 m 3786 m 3815 m 3815 m 3867 m
27 28 29 30 31 32 33 34 35 36

13-Feb-20 14-Feb-20 15-Feb-20 16-Feb-20 17-Feb-20 18-Feb-20 19-Feb-20 20-Feb-20 21-Feb-20 22-Feb-20

22.00 22.50 12.00 20.75 22.50 24.00 12.25 10.75


2.00 1.50 1.00 6.50 3.25 1.50 0.75 3.25 13.25

2.00 3.00
9.00 14.75 8.00 15.00
0.50 1.00
2.50
0.50 1.00

1.75 1.25

24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00
85 m 56 m 0m 0m 0m 0m 0m 0m 0m 0m
3952 m 4008 m 4008 m 4008 m 4008 m 4008 m 4008 m 4008 m 4008 m 4008 m
37 38 39 40 41 42 43 44 45 46

23-Feb-20 24-Feb-20 25-Feb-20 26-Feb-20 27-Feb-20 28-Feb-20 29-Feb-20 1-Mar-20 2-Mar-20 3-Mar-20
2.75 0.75
22.00 20.00
2.00 1.25 1.25 3.50 10.00

2.75 0.25 7.25 2.50 4.50


21.00 15.50 6.25 11.50 9.50 8.00

0.25 1.50
1.50 2.75

14.00
14.00 24.00 6.00
18.00

1.00 1.00 1.50 2.00

24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00
-4008 m 0m 0m 0m 0m 3887 m 66 m 74 m 83 m 87 m
3887 m 3953 m 4027 m 4110 m 4197 m
47 48 49 50 51 52 53 54 55 56

4-Mar-20 5-Mar-20 6-Mar-20 7-Mar-20 8-Mar-20 9-Mar-20 10-Mar-20 11-Mar-20 12-Mar-20 13-Mar-20

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
58 m 61 m 31 m 0m 13 m 44 m 51 m 48 m 30 m 23 m
4255 m 4316 m 4347 m 4347 m 4360 m 4404 m 4455 m 4503 m 4533 m 4556 m
57 58 59 60 61 62 63 64 65 66

14-Mar-20 15-Mar-20 16-Mar-20 17-Mar-20 18-Mar-20 19-Mar-20 20-Mar-20 21-Mar-20 22-Mar-20 23-Mar-20

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0m 0m 0m 0m 0m 0m 0m 0m 0m 0m
4556 m 4556 m 4556 m 4556 m 4556 m 4556 m 4556 m 4556 m 4556 m 4556 m
67 68 69 70 71 72 73 74 75 76

24-Mar-20 25-Mar-20 26-Mar-20 27-Mar-20 28-Mar-20 29-Mar-20 30-Mar-20 31-Mar-20 1-Apr-20 2-Apr-20

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0m 0m 0m 0m 0m 0m 0m 0m 0m 0m
4556 m 4556 m 4556 m 4556 m 4556 m 4556 m 4556 m 4556 m 4556 m 4556 m
77 78 79 80 81 82 83 84 85 86

3-Apr-20 4-Apr-20 5-Apr-20 6-Apr-20 7-Apr-20 8-Apr-20 9-Apr-20 10-Apr-20 11-Apr-20 12-Apr-20

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0m
4556 m
87

13-Apr-20

0.00
TIME ANALYSIS OF 12.25" PHASE
Tijara#1 DAYS 1 2 3
TOTAL HOURS CODE ACTIVITY 18-Jan-20 19-Jan-20 20-Jan-20
0.00 1 Rig Up / Rig Down
32.25 2 Drilling 2.50 13.50 5.75
21.75 3 Reaming 1.50 10.50 5.75
0.00 4 Coring
0.50 5 Circulation 0.50
17.50 6 Tripping 10.25
0.00 7 Lubricate Rig
1.25 8 Repairs 0.75
0.00 9 Cut and slip drill line
0.00 10 Deviation Survey
0.00 11 Wireline logging
0.00 12 Casing & Cementation
0.00 13 Waiting on Cement
0.00 14 Nipple up BOP
0.00 15 Test BOP
0.00 16 DST
0.00 17 Plug back
0.00 18 Squeeze Cement
0.00 19 Fishing
0.00 20 Directional Work
2.75 21 Miscellaneous 1.00
0.00 22 Test Equipment
0.00 23 Production Testing
76.00 Total 4.00 24.00 24.00

ACTIVITY % TOTAL HOURS


Rig Up / Rig Down 0.00 0.00
Drilling 42.43 32.25
Reaming 28.62 21.75
Coring 0.00 0.00
Circulation 0.66 0.50
Tripping 23.03 17.50
Lubricate Rig 0.00 0.00
Repairs 1.64 1.25
Cut and slip drill line 0.00 0.00
Deviation Survey 0.00 0.00
Wireline line logging 0.00 0.00
Casing & Cementation 0.00 0.00
Wait on Cement 0.00 0.00
Nipple up BOP 0.00 0.00
Test BOP 0.00 0.00
DST 0.00 0.00
Plug back 0.00 0.00
Squeeze Cement 0.00 0.00
Fishing 0.00 0.00
Directional Work 0.00 0.00
Miscellaneous 3.62 2.75
Test Equipment 0.00 0.00
Production testing 0.00 0.00
TOTAL 100.00 76.00
4 5 6 7 8 9 10 11
21-Jan-20 22-Jan-20 23-Jan-20 24-Jan-20 25-Jan-20 26-Jan-20 27-Jan-20 28-Jan-20

10.50 15.50 20.75 14.00 7.00 12.75 16.50 7.25


4.00 1.25 3.25 5.25 3.25 9.25 7.50 5.75

2.00 1.00 3.75


7.25 5.75 2.75 10.50 5.75

0.50 1.00 2.00 1.50

1.75 1.50 1.25

24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00


12 13 14 15
29-Jan-20 30-Jan-20 31-Jan-20 1-Feb-20

3.50 4.00
12.50

1.50
1.00

2.50 17.00 5.00


18.00 6.00
10.25

3.00 3.00 6.75


1.00 1.00

24.00 24.00 24.00 24.00


TIME ANALYSIS OF 8.5" PHASE
Tijara#11 DAYS 1 2 3
TOTAL HOURS CODE ACTIVITY 20-Mar-19 21-Mar-19 22-Mar-19
0.00 1 Rig Up / Rig Down
80.00 2 Drilling
15.75 3 Reaming
0.00 4 Coring
12.25 5 Circulation
20.50 6 Tripping
0.00 7 Lubricate Rig
0.00 8 Repairs
0.00 9 Cut and slip drill line
0.00 10 Deviation Survey
0.00 11 Wireline logging
24.00 12 Casing & Cementation
54.75 13 Waiting on Cement
0.00 14 Nipple up BOP
0.00 15 Test BOP
0.00 16 DST
0.00 17 Plug back
0.00 18 Squeeze Cement
0.00 19 Fishing
0.00 20 Directional Work
8.75 21 Miscellaneous
0.00 22 Test Equipment
0.00 23 Production Testing
216.00 Total 0.00 0.00 0.00

ACTIVITY % TOTAL HOURS


Rig Up / Rig Down 0.00 0.00
Drilling 37.04 80.00
Reaming 7.29 15.75
Coring 0.00 0.00
Circulation 5.67 12.25
Tripping 9.49 20.50
Lubricate Rig 0.00 0.00
Repairs 0.00 0.00
Cut and slip drill line 0.00 0.00
Deviation Survey 0.00 0.00
Wireline line logging 0.00 0.00
Casing & Cementation 11.11 24.00
Wait on Cement 25.35 54.75
Nipple up BOP 0.00 0.00
Test BOP 0.00 0.00
DST 0.00 0.00
Plug back 0.00 0.00
Squeeze Cement 0.00 0.00
Fishing 0.00 0.00
Directional Work 0.00 0.00
Miscellaneous 4.05 8.75
Test Equipment 0.00 0.00
Production Testing 0.00 0.00
TOTAL 100.00 216.00
4 5 6 7 8 9 10 11
23-Mar-19 24-Mar-19 25-Mar-19 26-Mar-19 27-Mar-19 28-Mar-19 29-Mar-19 30-Mar-19

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


12 13 14 15 16 17 18 19 20
31-Mar-19 1-Apr-19 2-Apr-19 3-Apr-19 4-Apr-19 5-Apr-19 6-Apr-19 7-Apr-19 8-Apr-19

20.50 20.00 20.50


3.50 4.00 3.50

0.00 0.00 0.00 0.00 0.00 0.00 24.00 24.00 24.00


21 22 23 24 25 26
9-Apr-19 10-Apr-19 11-Apr-19 12-Apr-19 13-Apr-19 14-Apr-19

19.00
1.00 3.75

1.75 2.00 4.00 4.50


2.25 18.25

19.75 4.25
15.25 24.00 15.50

0.25 8.50

24.00 24.00 24.00 24.00 24.00 24.00


TIME ANALYSIS OF 8.5" PHASE
Tijara#1 DAYS 1 2 3
TOTAL HOURS CODE ACTIVITY 15-Apr-19 16-Apr-19 17-Apr-19
0.00 1 Rig Up / Rig Down
517.84 2 Drilling 6.10
122.61 3 Reaming 10.50
0.00 4 Coring
90.75 5 Circulation
301.80 6 Tripping 1.75 11.75 5.15
0.00 7 Lubricate Rig
3.50 8 Repairs
10.00 9 Cut and slip drill line
0.00 10 Deviation Survey
29.25 11 Wireline logging
36.75 12 Casing & Cementation
98.00 13 Waiting on Cement
20.50 14 Nipple up BOP
0.00 15 Test BOP
0.00 16 DST
0.00 17 Plug back
0.00 18 Squeeze Cement
0.00 19 Fishing
0.00 20 Directional Work
118.50 21 Miscellaneous 22.25 12.25 2.25
0.00 22 Test Equipment
0.00 23 Production Testing
1349.50 Total 24.00 24.00 24.00

ACTIVITY % TOTAL HOURS


Rig Up / Rig Down 0.00 0.00
Drilling 38.37 517.84
Reaming 9.09 122.61
Coring 0.00 0.00
Circulation 6.72 90.75
Tripping 22.36 301.80
Lubricate Rig 0.00 0.00
Repairs 0.26 3.50
Cut and slip drill line 0.74 10.00
Deviation Survey 0.00 0.00
Wireline line logging 2.17 29.25
Casing & Cementation 2.72 36.75
Wait on Cement 7.26 98.00
Nipple up BOP 1.52 20.50
Test BOP 0.00 0.00
DST 0.00 0.00
Plug back 0.00 0.00
Squeeze Cement 0.00 0.00
Fishing 0.00 0.00
Directional Work 0.00 0.00
Miscellaneous 8.78 118.50
Test Equipment 0.00 0.00
Production Testing 0.00 0.00
TOTAL 100.00 1349.50
4 5 6 7 8 9 10 11
18-Apr-19 19-Apr-19 20-Apr-19 21-Apr-19 22-Apr-19 23-Apr-19 24-Apr-19 25-Apr-19

22.00 19.45 7.00 20.00 18.50 17.15 20.80


2.00 2.05 5.60 4.00 4.00 4.10 3.20

1.50 1.00
1.00 11.00 10.40 1.50 1.75

3.00

10.00 1.00

24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00


12 13 14 15 16 17 18 19
26-Apr-19 27-Apr-19 28-Apr-19 29-Apr-19 30-Apr-19 1-May-19 2-May-19 3-May-19

10.84 15.75 18.72 19.47 19.23 15.70


1.16 6.00 8.25 5.28 4.53 4.77 2.05 2.00

1.50 1.00 1.75 2.50


10.50 10.75 4.50 15.50

0.75

4.00

5.50

24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00


20 21 22 23 24 25 26 27
4-May-19 5-May-19 6-May-19 7-May-19 8-May-19 9-May-19 10-May-19 11-May-19

17.16 20.41 20.62 20.61 20.22 17.75 16.25


2.84 3.59 3.38 3.39 3.78 6.25 2.50

0.50 1.00 1.75


10.75 3.00 3.50

1.50

10.00

1.25

24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00


28 29 30 31 32 33 34 35
12-May-19 13-May-19 14-May-19 15-May-19 16-May-19 17-May-19 18-May-19 19-May-19

18.00 19.75 6.00 21.25 20.45 20.95 21.06


6.00 2.75 0.25 0.75 2.75 3.55 3.05 2.94

1.50 0.25 3.50


19.25 12.25

2.25 1.50

2.00

24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00


36 37 38 39 40 41 42 43
20-May-19 21-May-19 22-May-19 23-May-19 24-May-19 25-May-19 26-May-19 27-May-19

19.65
3.60 0.50 0.50 0.75

0.75 7.25 4.50 3.00 22.25 9.50


14.50 15.50 17.50 13.00

2.00
1.00

7.75
5.50 21.00 1.75 8.50
6.00

1.75 0.75 0.50 2.75

24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00


44 45 46 47 48 49 50 51
28-May-19 29-May-19 30-May-19 31-May-19 1-Jun-19 2-Jun-19 3-Jun-19 4-Jun-19

7.00

6.25 7.50
15.00 17.75 9.50 17.00

24.00 24.00 24.00 20.00


3.00

6.00 7.00

24.00 24.00 24.00 20.00 24.00 24.00 24.00 24.00


52 53 54 55 56 57
5-Jun-19 6-Jun-19 7-Jun-19 8-Jun-19 9-Jun-19 10-Jun-19

6.00 5.75 0.25


18.00 7.25 19.00 3.50

1.50

7.50

15.00 2.50

11.00 3.25 5.50 14.00 9.50

24.00 24.00 24.00 24.00 24.00 9.50

Вам также может понравиться