Вы находитесь на странице: 1из 11

INSTAPOWER GUARANTEED TECHNICAL PARTICULARS

CUSTOMER : KEI INDUSTRIES LIMITED


CLIENT: POWER GRID CORPORATION OF INDIA. REV. NO
:0
TITLE : SOLAR SYSTEM FOR CONFERENCE ROOM & CONTROL ROOM
PROJECT: ARP-SS04

Block Diagram/System Layout:-

Solar Panel

285Wp x 28 nos.

Conference
Control Panel Room

230V / 50Hz Grid 96V/8KVA 360 W for 4


Hrs
Off Grid Inverter with
Battery charger With
Switch

Over controls, Control


Indicators, etc. Room
1260W
for 20
Hrs

Battery Bank

12V/150AH Batteries ( 8 Nos. Of


batteries connected in series . Such type
of three arrays connected in parallel)
INSTAPOWER GUARANTEED TECHNICAL PARTICULARS
CUSTOMER : KEI INDUSTRIES LIMITED
CLIENT: POWER GRID CORPORATION OF INDIA. REV.
NO : 0
TITLE : SOLAR SYSTEM FOR CONFERENCE ROOM & CONTROL ROOM
PROJECT: ARP-SS04

Specifications: - Quantity

(1) Power conditioning unit: -


• Make-PGCIL Approved (Statcon)
(i) Battery Charger: - 1 No.
96V/ 48A charger with –
• Reverse polarity protection
• Over/Under voltage protection
• Thermal monitoring
• Over current protection

(ii) Inverter: -
96V – 8KVA
• Overload protection
• Reverse polarity protection
• Deep discharge protection (cut off at 88V)

2. Battery Bank: - 1 Set

96V/450Ah
• 24 Nos. of 12V/150AH SMF Batteries.
• 8 Nos. of 12V/150AH Batteries connected in series. Such type of 3 Arrays are
connected in parallel.
• Make- PGCIL Approved (Amara Raja/HBL/EXIDE)
• Type-VRLA

3. Solar Panel: 285 Wp 28 Nos.

• 4 nos. of 285Wp PV module connected in series. Such type of 7 arrays


connected in parallel.
• Make—PGCIL Approved
KEI ARPSS04
Inverter Efficiency: 90%
Battery Bus Voltage (BBV): 96
Solar Insolation time in hours (SI): 5.5

(ALxOT)/IE
(AL) (OT) Reflecting
Actual Operating load in
(IE) Inverter Efficiency
load in Time in wattage at the
watt Hour input of the
inverter
Control
1260 20 0.9 28000.0
Room
Conference
360 4 0.9 1600.0
Room
Total Reflecting load at the input of the inverter / Total Energy demand
29600.0
per day(ED)
Battery Size
SI 5.5 Hrs.
calculation:
Total demand from the 96V battery bus(TAH):ED/BBV 308.3 AH
DoD of battry 0.75
96V Battery size in AH: TAH/DoD 411.1 AH

12V/150AH batteries (8 Nos. of batteries connected in series. Such type of


three arrays connected in parallel) 24 nos.

PV module calculation: 96 System


Total Energy demand per day (ED) 29600.0 W
Battery Round trip efficiency 70% to 85% (BRE) 0.75
Required PV module output per day in W-H:ED/BRE 39466.7 W
Required PV module output per hour in W-H:ED/BRE/SI 7175.8 W/hr
DF for moderate climats & non-critical applications 0.9
Required PV module out put per hour by considering
DF. : ED/BRE/SI/DF 7973.1 W/hr
Selected PV module at Max. power voltage at STC(x0.85) how calculated,
(36.42x4) any supporting 145.7 V
Selected PV module guaranteed power output at STC:M 285 W
document
Nos. of 285W PV module required:ED/BRE/SI/DF/M 28.0 nos.
Nos. of 285W PV module required making it round to the 28 nos.
next:N 28 nos.
Total PV module output required:MxN 7980 W
4 Nos. of 285W PV modules are connected in series
7 Nos. of such module arrays are connected in parallel
This drawing and design is the property of STATCON ENERGIAA PVT LTD. It should not be copied or communicated to any person without
without the written approval of the proprietors.

375 625 375

POWER CONDITIONING UNIT


RS-232
232
BATTERY
TEMP.
SIGNEL

M ODE/A
CK
- +
B AC K

FLA SH D RIVE
S OCK ET
ER ROR
S TA TU S
S AFE EJ ECT

AL W A Y S PR E S S S AF E E J EC T
K E Y B EF OR E R E M O VIN G
M E M OR Y C AR D

SPEC.
PLATE

BATTERY LOAD
MAINS PV
MCB MCB
594 1.
OPERATING INSTRUCTION
Conne ct ' PV ', ' BATT ER Y' ' MAIN S' & ' LO AD' ca bles in correct polarity. Ensure
tight conne ctions.
INSTRUCTION MCB MCB

2. Turn ON ' Battery MCB'. Front displa y & 'Pow er ON' LED come up.
3.
4.
5.
6.
Che ck display for any fault.
Turn front panel red sw itch to ON position for 23 0V AC output on display.
Turn on ' LOAD MC B' to pow er up loads.
Turn on ' PV MC B' and 'MAIN S MCB'.
652
3

BATTERY MAINS PV
LOAD
+ - P N + -
P N

BATTERY LOAD MAINS PV

MOV

Earthing
FRONT VIEW REAR VIEW
RHS VIEW

NOTE:-
1. All dimensions are in mm with ± 5 mm tolerance.
2. Panel frame shall be fabricated out of 1.6mm CRCA sheet.
3. All the cover of the panel shall be screwed type.
375
4. Panel shall be suitable for indoor use. The degree of protection shall be IP-31.
5. Panel shall be painted with Black colour (RAL-7032).

SHEET-1/1
REV. DATE DRAWN CHKD. APPD. P.O.NO.

0 05-12-19 L.K OWNER EAST CENTRAL RAILWAY


CONSULTANT POWER GRID CORPORATION OF INDIA LIMITED
625 CONTACTOR ANGELIQUE INTERNATIONAL LIMITED
BOTTOM VIEW SUPPLIER INSTAPOWER LIMITED

TITLE GRID PCU


GA DRAWING OF 8KVA/96V OFF-GRID
DRG.NO. STE/GA/MC/INV ISSUE : 1

SCALE-NTS: MANUFACTURER:

Doc. No./Rev No. : STE/ENG/F08 (Rev-1)


(Rev
There could be minor changes in GA Drg. during actual manufacturing of unit. The same will be shown in as
as-buit Drg. Rev Date : 08-12-2016

A B C D E
mention gasket
size

STATCON ENERGIAA PVT. LTD. info@energiaa.in, www.energiaa.in


B-81, Sector 63 Noida U.P. (Works at Ghaziabad) +91-120-3819600/653