Nombre Maquina: O/T:
Test
MODELO N° DE SERIE ARREGLO Espec. HORAS
MAQUINA 330D JLP 0K6787
MOTOR C9
(4) Main relief valve (7) Line relief valve (boom cylinder rod end).
(5) Locknut for the heavy lift (Lift Switch ON) (8) Line relief valve (bucket cylinder head end)
(6) Adjustment screw for the heavy lift (12) Line relief valve (stick cylinder rod end)
(7) Locknut for the main relief valve (Lift Switch OFF) (20) Line relief valve (bucket cylinder rod end)
(8) Adjustment screw for the main relief valve
OBSERVACIONES:
RECOMENDACIONES:
Presiones
Punto de Prueba
Especificacion Encontrados Corregidos
lift switch ON 5220 ± 73 psi
A. Main Relief Valve
lift switch OFF 5075 ± 73 psi
B. Boom Cylinder line (Head End) 5500 ± 145 psi
C. Boom Cylinder line (Rod End) 5350 ± 145 psi
D. Stick Cylinder line (Head End) 5350 ± 145 psi
E. Stick Cylinder line (Rod End) 5500 ± 145 psi
F. Bucket Cylinder line (Head End) 5350 ± 145 psi
G. Bucket Cylinder line (Rod End) 5350 ± 145 psi
H. Swing Right 4550 ± 145psi
I. Swing Left 4550 ± 145psi
J. Left Travel Crossover (Forward) 5439 ± 218 psi
K. Left Travel Crossover (Reverse) 5439 ± 218 psi
L. Right Travel Crossover (Forward) 5439 ± 218 psi
M.Right Travel Crossover (Reverse) 5439 ± 218 psi
N. Relief Valve Pilot 595 ± 29 psi
L. Power shift pressure 480 psi
Tiempo en segundos
Velocidad de Cilindros Valores
New Rebuild Service Limit Encontrado
Tiempo en segundos
Velocidad de Cadenas por tres vueltas Valores
New Rebuild Service Limit Encontrado
Tecnico Evaluador:
V
ERPILLAR
AT2
FECHA
Escape
25 ± 0.003")
Corregidas
rvaciones /Correciones
Corregidos
Valores
Corregido
Valores
Corregido