Вы находитесь на странице: 1из 1

----

LOAD COMBINATION
FOR MAXIMUM PILE CAPACITY

LC-1 NS LWL Span Dislodge FORCES @ PILE CAP BOTTOM LC-1


S.N. Description V HL HT MTT MLL
Tonne Tonne Tonne Tm Tm
1) Sub-structure & Foundation 440.8 -27.9 0.0 1
2) Earth fill 170.1 -273.0 0.0 1
9.1) Earth Pressure LWL (Abt c.g of Pile) 1
Horizontal Component 92.8 184.9 1
Vertical Component 33.8 -86.2 1
10.1) Surcharge Pressure LWL(O/S) 50.0 118.6 1

S.N. Description Forces about toe


V HL HT MTT MLL
Tonne Tonne Tonne Tm Tm

LC-1 NS LWL Span Dislodge 644.714 142.86 0 -83.6603 0

LC-2 NS LWL No LL,Service Condition FORCES @ PILE CAP BOTTOM LC-2


S.N. Description V HL HT MTT MLL
Tonne Tonne Tonne Tm Tm
1) Sub-structure & Foundation 440.8 -27.9 0.0 1
2) Earth fill 170.1 -273.0 0.0 1
3) Super-structure DL 129.2 20.7 0.0 1
4) SIDL (excluding surfacing) 21.7 3.5 0.0 1
5) Surfacing 28.6 4.6 0.0 1
6) Longitudinal Forces Frictional Component only 9.0 29.2 1
9.1) Earth Pressure LWL (Abt c.g of Pile) 1
Horizontal Component 92.8 184.9 1
Vertical Component 33.8 -86.2 1
10.1) Surcharge Pressure LWL(O/S) 50.0 118.6 1

S.N. Description Forces about toe


V HL HT MTT MLL
Tonne Tonne Tonne Tm Tm

LC-2 NS LWL No LL,Service Condition 824.238 151.83 0 -25.7101 0

Вам также может понравиться