Verigreen ELS has been hired to conduct a small business energy audit and energy conservation
measure (ECM) evaluation for the office of Surovell Isaacs Petersen & Levy (SIP&L). The office
occupies the second and third floors of 4010 University Drive in Fairfax, VA. The analysis was
accomplished by first performing an on-site survey in order to collect all the pertinent data on the
existing conditions. Second, a utility analysis was completed on the previous 12 months of utility
bills. This analysis generated a baseline for the building and determined the types and quantities of
utility costs. Finally, ECMs were developed and evaluated for their relative cost effectiveness.
Energy savings and ECM costs were determined using standard engineering methods and
conservative estimates and assumptions.
The following is a preliminary report, which presents and summarizes the proposed ECMs for
SIP&L. A building and utility overview are followed by the ECM analysis descriptions. Each ECM
description includes the motivating “Issue,” the “Proposed Upgrade,” the quantified “Energy
Benefits,” and the qualified “Facility Improvements.”
BUILDING OVERVIEW
4010 University Drive is located in Fairfax, VA. It is a freestanding office building with 20 to 30
offices on each of the second and third floors. There are 13,106 square feet of space. Lighting is
primarily from standard 2x4 and 2x2 fluorescent lamps. Thermostat temperature settings are 66 to
68 in winter and 72 to 74 in summer. The office space is heated and air conditioned by seven
electric heat pumps with a total tonnage of 30.5 tons. Overall Energy Utilization Index for this
space is 46 versus the national average of 62. The lower EUI is probably resulting from the space
being located in the upper two floors of the building. However, in winter there are uncomfortably
cold areas located on the third floor near the elevator and in the area of the west Men’s Room
despite the overall energy performance. Also, the conference room on the second floor is
uncomfortably warm during the day in the summer, and more HVAC capacity added in an attempt
to control temperatures in that space has not provided a solution. The library on the second floor
also is cooler during the winter, and there have been some general complaints about comfort in the
building.
UTILITY ANALYSIS
VERIGREEN analyzed the previous 12 months of utility consumption data as shown in the charts
below: A detailed analysis was completed for the latest 12 months of electric utility bills. This
analysis generated a baseline usage for the building and determined the types and quantities of utility
costs.
Electric Rates
Estimated
Seasonal
Versus
Baseload:
The annual electric consumption for the 12 months ending September 2010 was 170,827 kWh at a
cost of approximately $18,101* (an average of $0.103/kWh). Average monthly rates vary from
approximately $0.1031/kWh in the winter to approximately $0.102/kWh in the summer.
Approximately $6,270 of the total expenditure is considered seasonal cost. Figure 2-1 represents the
usage and costs by month for October 2009 through September 2010.
*Before the DVP’s rate base settlement credits
kWh Costs
Total energy used on-site for this office space was 602,467 kBtu. At 13,106 square feet, this area’s
EUI (Energy Utilization Index) was 46 EUI compared to the national average for office space of 62
EUI. As mentioned previously, the lower EUI is probably resulting from the space being located in
the upper two floors of the building. There are cost effective Energy Conservation Measures to be
taken that make the space more energy efficient, save money, and provide greater comfort for the
owners and employees of the firm.
(Data from Commercial Building Energy Consumption Survey (CBECS) by the Department of Energy’s – Energy
Information Administration (EIA)).
There are 245 T8/T12 Fluorescent lights employed for general lighting (Interior). A mixture of 97-
2x4 fixtures, 22- 2x2 fixtures and 7- 1x4 fixtures provide the primary source of interior lumens. In
addition, 24 incandescent lights are used in restrooms and storage rooms, 8 exits signs and 63
recessed can fixtures represent the balance of the Interior light system. 4 Metal Halide lights
(exterior poles) and 12 Metal Halide soffit squares over the parking garage are used for site lighting.
There are seven centralized electric air source heat pump split systems providing cooled or heated
conditioned air to the space:
Lennox – Model HP29-060-7Y Serial: 5808D06211 5 Tons - 2 years old
Carrier – Model: 25HBC360A500 Serial: 2110E22989 3 Tons – 1 year old
Carrier – Model: 25HBR360A520 Serial: 0508E20630 3 Tons – 2 years old
Carrier – Model: 38YG060500 Serial: 1891E46438 5 Tons – 19 years old
Carrier – Model: 38YKC060300 Serial: 3497E03049 5 Tons – 13 years old
Hot water is provided using one 50-gallon electric AO Smith ECT 52 210 hot water heater
manufactured in 2001, and rated at 4,500 Watts. R-Value of the tank is R-16 and the energy factor is
.91, both adequate factors.
One of the 5-Ton Carrier Compressors AO Smith Storage Tank Water Heater
While the building shell on the second and third floors is generally sound, there are holes in the
building’s shell that create outside air infiltration serious enough to cause comfort issues in certain
areas of the offices and to waste energy. Windows, with the exception of the conference room, are
in good condition. They are insulated and sashes are tight.
Significant infiltration into the conditioned space is occurring through a large hole in the building
envelope at the spot an exhaust duct accesses the outside, behind a roof soffit. It’s located over the
suspended ceiling, above the outside door to the 3rd floor balcony where heat pump compressors are
located. At the time of the audit, the rooms off the elevator were noticeably colder than average.
The cold, infiltrating air was making it’s way past the ceiling tiles in the suspended ceiling and into
the conditioned space. It is significant enough that there also undoubtedly is a significant loss of
conditioned air (ex-filtration) during the hot summer months.
Unsealed Opening Around Exhaust Duct (Left Digital Photo) with Cold Air Infiltration Evident
In the 3rd floor ceiling, located over the suspended ceiling, penetrations for plumbing vents through
it and into the attic space are unsealed and are allowing cold attic air infiltration, and ex-filtration of
conditioned air during warmer months, in areas near bathrooms.
There are isolated openings in the steel framing allowing infiltration along the north wall above the
suspended ceiling.
Example of Infiltration Point in North Wall (Same view, digital and infrared)
Air infiltration occurs through holes in the north wall at penetrations points for the heat pump lines
running between the outside compressors and the inside evaporators/air handlers on the second and
third floors. They are accessible above the suspended ceilings.
A 2nd Floor North Wall Penetration for Heat Pump Lines
Thermally, insulation is insufficient in the main attic and there are issues with areas of fiberglass batt
insulation under second floor roof decks on the south side of the building. Significant issues exist
with the insulation over the conference room. Windows in the building are sound, except for the
conference room windows.
The difficulty in keeping the conference room comfortable during warm periods, despite added air
conditioning, is attributable to the issues with insulation and windows. The problem with roof
insulation can be seen from a vantage point above suspended ceiling tiles in the hallway, looking
through holes in the drywall of the conference room wall above the suspended ceiling. Despite a
very limited view, it is possible to see three fiberglass insulation batts are no longer attached to the
rafters under the roof deck, having fallen down on top of the ceiling of the room. The batts appear
Left Photo: Fallen Batt Insulation Exposes Roof Deck Sheathing Over Conference Room
Right Photo: 80+ Degree Temperature of the Sheathing when Outside Weather was 41 Degrees and Sunny
The conference room windows currently have film added to the inside glazing, and that blocks some
solar heat gain. It is not very effective and with so much wall area in windows, solar heat gain is a
problem. Window shades currently installed are not effective in reducing solar heat gain.
Large Glazing Area of the Outside Wall and the Window Curtain Temperature with a Low Winter Sun
The loose-fill cellulous insulation in the main attic averages approximately 4 to 5 inches and has an
estimated R-Value of R-15, a 69% deficiency in the recommended thermal barrier for this climate,
R-49.
Loose-Fill Cellulous Insulation Approximately 4 to 5 Inches, Estimated R-15
Verigreen ELS P a g e 10
The attic scuttle’s cover is not weather-stripped nor is it insulated, so there is some air infiltration or
ex-filtration in addition to conducted cold or heat through the cover.
Un-insulated Attic Scuttle Cover with No Weather-Stripping
ECM-1: Retrofit Exterior Lights with Induction Kits and Interior Fluorescent Fixtures with
2 lamps and a Reflector
Issue 1: There are approximately 97, 2x4 Fluorescent recessed fixtures (4 lamps each)
throughout the office that use magnetic ballasts rated for 2 lamps. Most fixtures are
currently using two of the four lamps even though four lamps are in place. There are
approximately 22, 2x2 Fluorescent recessed fixtures (2 Ubend lamps each) that also use
magnetic ballasts. These fixtures have prismatic lenses that diffuse the light to the occupied
Verigreen ELS P a g e 11
space. In enclosed white painted fixtures like this, up to 25% of the light emitted from the
lamps is lost inside the fixture or absorbed by the lens.
Issue 2: The exterior lighting uses short life Metal Halide lights (10,000 hours) in poles and
garage area which increase the frequency of maintenance costs and require high wattages.
Moreover, it is possible that magnetic ballasts are in use and they can use a high efficiency
electronic ballast.
Issue 3: The recessed fixtures throughout the client waiting areas, lobby and a couple of
offices use Incandescent floods which have short durability ratings and high wattages (a few
Compact Fluorescents are in use which has helped lower the wattage in use). The Exit signs
can be switched to LED Exit signs for better efficiency and durability.
Proposed Upgrade:
Retrofit interior 2x4 fixtures with two T8 28watt lamps and a new reflector that will direct up to
96% of the light down to the floor space. Install one high efficiency 2 lamp T8 electronic ballast
with a ballast factor of 1.2 (to slightly increase light output) in each fixture. The addition of the
reflector and new ballast will ensure that light levels are maintained from existing conditions even
though the fixture will be using two lamps instead of three or four lamps. Retrofit the 2x2 fixtures
with three T8 17watt lamps and a new reflector that will provide more light for less energy
consumption. Also, retrofit all incandescent floods with either Induction (15-23watt, 60,000 hour
durability) or CFL (15-25 watt, 8,000 hour durability) lights.
Retrofit exterior site lighting fixtures (poles and garage area) with Induction lamps. We recommend
installing 100,000 hour rated Induction lamps at a wattage that is approximately half of current Metal
Halide. Induction lamps will achieve a 50%+ reduction in energy usage and avoid maintenance costs
associated with frequent bulb/ballast burnout experienced with current lights. Induction lamps will
provide a very high Color Rendering Index (CRI) of 85 or higher, for seeing true colors very close to
the effect of natural daylight (CRI = 100 for daylight by definition). This will improve security
camera surveillance results and provide customers and employees with excellent visibility and sense
of comfort when on the property.
Issue:
All air conditioning systems lose approximately 30% of original efficiency due to oil fouling
in the first 5 years of operation. Half of the current RTUs are at least 5 years old and require
a longer duty cycle to cool the office which leads to premature failure of the units. The
newer units will continue to lose performance over time and can benefit from protection
from oil fouling.
Verigreen ELS P a g e 12
Proposed Upgrade:
Install PermaFrost (one ounce of product per ton) into each air conditioning unit to eliminate oil
fouling in the coils and compressor. This will restore original SEER performance, remove heat
from metal surfaces faster, accelerate refrigerant flow and increase thermo-conductivity of the
refrigerant, oil and metal. Life cycle of existing units may be extended with reduced operating
cycles.
Issue:
Loose-Fill cellulous insulation currently installed on the attic floor is estimated to provide
only an R-15 thermal barrier, allowing excess cold or warm temperatures in the attic space to
conduct through the ceiling and either cool or heat conditioned space, putting additional
load on the HVAC systems. This also contributes to stack effect loads the zoned HVAC
systems must overcome. This wastes approximately 331 heating Therms and 220 cooling
therms annually.
Proposed Upgrade:
Increase insulation R-Value of the main attic to R-49 by installing the appropriate amount of loose-
fill blown cellulous insulation over the estimated R-15 cellulous or fiberglass insulation currently
installed. This will increase the depth of the insulation from about 4+ inches to approximately 14
inches.
ECM SUMMARY
Table 4 of this report is a summary of the ECMs selected for implementation. Implementing all
recommended ECMs will enable SIP&L to achieve significant operational cost savings with an
overall breakeven point of 3.8 years. Over the course of 10 years, savings will exceed $87,000 versus
the $26,795 initial total cost. If ECMs are done in phases, VERIGREEN recommends ECMs 1 & 2
as priorities due to rapid breakeven and size of annual cost savings.
Implementation of all of these measures will reduce electric consumption by approximately 70,150
kWh. This would reduce greenhouse gas emissions by approximately 100,000 lbs CO2 (about 50
tons) per year, which is the equivalent of planting 10.7 acres of trees or removing 9.6 cars from the
road every year
Verigreen ELS P a g e 13
There will be additional savings in heating and cooling energy costs that will also accrue from the
recommendations listed after the ECM summary, below.
*Actual cost may vary. Assumes $1.40 per square foot product and installation cost. Bid for best price and quality.
**Assumes 10.7 cents per kWh, an additional 34-R in thermal protection, and a 550 therm reduction in temperature loss through conduction in attic
insulation.
1. Conference room:
Re-install fallen R-21 (estimated) fiberglass insulation batts under roof deck over
the conference room to reduce the radiated heat from sunshine on the roof. An
alternative to achieve greater effective R-Value may be to install 5 inches of
closed cell spray foam under the roof deck to achieve approximately R-30. (An
evaluation by a foam insulating professional would be needed.) Access to the
roof deck through the conference room ceiling will be required in either case.
Install low solar heat gain coefficient (SHGC), low E windows to reduce
conducted heat from the outside and radiated heat from the sun into the room.
An interim step to take in order to determine if #3, new windows, can be avoided
is to install high quality, insulated window shades in the conference room to
block radiated heat from the sun. Additionally, air-seal all cracks and gaps in
frames and trim inside and outside the windows with caulk and 2-part foam
sealant along with air-sealing sashes to frames with weather-strips or, if the
windows will not be opened during milder weather, with caulk. Another option,
if Fairfax City allows it, is to install awnings on the exterior to block direct
sunlight from entering.
Verigreen ELS P a g e 14
2. Air-seal the openings in the walls and ceilings at the penetrations for the heat pump
lines connecting the compressors and the evaporators/air handlers with 2-part foam
sealant.
3. Air-seal around plumbing vent stack pipes penetrating the 3rd floor ceiling/attic floor
with 2-part foam sealant.
4. Weather-strip the opening of the attic hatch and insulate the hatch cover with
polystyrene solid foam board cut-to-fit and glued to the top of the cover. (Alternative:
Install an Attic Tent over the scuttle opening.)
5. Air-seal the gap between the outside wall top plate and the brick with caulk or 2-part
foam sealant.
6. Air-seal openings in steel wall framing that are accessible from above the suspended
ceilings with 2-part foam sealant.
8. Install properly sized filters in air handlers and magnetic filter slot covers to achieve
proper function of the filters. (example: http://www.batticdoor.com/filterseal.html) A
maintenance check of evaporator coils in air handlers is recommended.
2. Turn off lights when not in use or when natural daylight can be used.
3. Set back the thermostat in the evenings and other times when a building is unoccupied.
4. Educate tenants and employees about how their behaviors affect energy use.
5. Improve operations and maintenance practices by regularly checking and maintaining equipment
to ensure it is functioning efficiently.
Verigreen ELS P a g e 15