Maintenance Procedure

 Machine Name:
Cooling Tunnel
 Purpose:
Set of organized operations that need to be carried out on parts and
machines periodically and systematically.
 Procedure:
o Lubrication:
- Grease in the greasing points provided, placed at the sides of
the tunnel next to the shafts supports and in any other point
equipped with ball greaser every 3000 working hours.

 General checking of maintenance:

- checking the state of operation of the various parts.


- eliminating or correcting problems, also those that while not
being an immediate source of danger or bad service may lead to
trouble if they continue.

o In this table will explain the frequency calculated in hours of


operation, which is merely an indication to enable programming
maintenance.

Page 1 of 3 done by Eng. Loay al-Bzour


Maintenance type FREQUENCY (HOURS)
No MECHANICAL 8 40 200 600 1200 3000 9000
M1 Machine cleaning *
M2 Machine greasing *
M3 Check of drain presence in the *
collecting glass of the
compressed air filter
M4 Check of safety devices *
efficiency
M5 Check main belt tensioning *
M6 Check of filters cleaning of *
pumps tanks
M7 Check of the filters cleaning *
placed on the pumps tanks
deliveries
M8 Check of fan filter cleaning *
M9 Check of the correct tightening *
of the various clamps that make
up the electric and pneumatic
panel
M10 Check of steam filter cleaning *
M11 Check of state of wear of the *
brass guides of the product entry
belt
M12 Check of the correct tightening *
of the fixing bolts of the whole
structure
M13 Cleaning of conveyor belt *
M14 Valves check *
M15 Gear motors lubrication *
M16 Check of transmission chains *
M17 Check the bearings and any *
supports
M18 Check of the good condition of *
the fishbone-shaped conveyor
belt.
M19 Check of the good condition of *
welds

Page 2 of 3 done by Eng. Loay al-Bzour


Maintenance type FREQUENCY (HOURS)
No ELECTRICAL 8 40 300 600 1000 3000 9000
E1 Checking photoelectric cells *
E2 Cleaning the fan/exchanger *
filters in the electric cabinet.
E3 Checking residual current device *
operation
E4 Checking the safety circuit *

Page 3 of 3 done by Eng. Loay al-Bzour