Project Report

Metros Stations at Bengaluru


Apurva Bose Dutta, experiencing the benefits of rapid
An Introduction to
Architect, Bengaluru transit system, a number of Indian
the Bengaluru Metro cities including Bengaluru, Chennai,
Photo courtesy: India is fast approaching Hyderabad and Mumbai are fast on
Urbanisation - with rapid growth in the track to attain the same.
DKA Architects
population and in an attempt to Bengaluru - India’s Silicon Valley
decongest crowds, metros in major stands tall amongst the cities which
cities of the country are springing are brimming with metro work going
up. With Kolkata and Delhi already on in full vigour. Apparently, several

76 NBM&CW FEBRUARY 2010


2005 and the Union Government in been able to do justice to designing
2006, the Bangalore Metro Rail metros. It is common knowledge
Corporation Limited (BMRCL) was that initially all the metros stations
founded in 2006 as a joint venture in Bengaluru were given to leading
between the Government of India architectural firms in the city to
and the Government of Karnataka design; who came up with brilliant
for the implementation of Bangalore concepts but however exceeded the
Metro Rail system. The East-West budget of 35 crores (for each
Corridor starting from Byappanahalli station) that was permitted. This is
will terminate at the Mysore Road where the Government had to
Terminal whereas the North-South reconsider the proposals and
Corridor will begin at the RITES, the general consultants for
Hesarghatta Road Terminal and the project stepped in. It was
end at Puttenahalli. decided that all the metro stations
needed to be redesigned. Tenders
Metro Stations by were floated for the same and were
won by L&T (an electrical and civil
DKA construction company), S N Bhobe
Amongst the 43 metro stations
(an electrical company who are also
being planned for the city, 11 have
currently handling the Mumbai
been designed by local architects -
metro) and SNCL. Indraneel Dutta
Dutta & Kannan Architects (DKA).
who did his graduation from
This is indeed a major achievement
Chicago, following which he worked
in a country where such technical
in London for five years, is the
aviation designing is left to
principal architect of DKA. He says,
international architects and only a
“For an architectural firm to qualify
handful of architectural firms have
for a project worth 1000 crores,

MRTS proposals for this IT Capital


have been in the pipeline for the
past 24 years. Dating back to 2003,
the Delhi Metro Rail Corporation
(DMRC) and RITES (Rail India
Technical and Economic Services)
Mysore Road Station
prepared a detailed project report
for the Bengaluru metro rail with
the proposal of two double line
corridors: East-West (EW) and
North-South (NS) with their lengths
respectively being 18.10 km and
14.90 km. With a nod of approval
from the Karnataka government in

NBM&CW FEBRUARY 2010 77


Project Report

they need to collaborate with a SNC Lavalin’s responsibility for this DKA has been into commercial
structural engineering firm. Thus project was structural design and architecture for sometime and have
came in our collaboration with SNC project coordination while DKA was been working on contemporary
Lavalin, an engineering and heading the architectural, MEP and designs. They are working towards
construction company. SPAN, a fire fighting.” The project got opening offices in Kolkata and
structural engineering firm (which launched in 2007; the east-west Chennai. The Metro project was the
is currently doing the Hyderabad stations are looking forward to first of its kind which they decided
and Chennai Metro) was bought completion in Dec 2010 and the to work on, all thanks to senior
over by SNC Lavalin for the same. north-south in Dec 2012. partner Brinda Kannan who has
worked on three underground metro
projects and two airport terminals
in London before she moved down
to India to form DKA three years
back. Without making any other
metro stations as their reference,
the firm thus plunged into the
project. A lot of calculations are
involved in the design of the metro
since it needs to have a dynamic
structural design. Talking about the
complications in designing a project
as challenging as this, Indraneel
informs us, “Any building takes
dead load and thus requires a four
point check. In the case of metro
stations, they take load passing

78 NBM&CW FEBRUARY 2010


Project Report

through them and thus require a


12 point check. As architects we
were never trained to design metros
which have lots of calculations and
an important consideration in its
cost factor”.
The metro project was divided
into four reaches – Reach 1 (R1),
Reach 2 (R2), Reach 3 (R3) and
Reach 4 (R4). DKA are the project
leaders of R2 and R3B. The stations
designed by them on R2 are ‘on
the road stations’ with carriageway
on both the sides – comprising of
stations at Mysore Road (terminal
station), Deepanjali, Vijayanagar,
Hosahalli, Toll Gate, Magadi Road.
The stations on R3 are ‘off the
road’ and comprise of stations at
Peeniya Village, Peeniya Industrial
Area, Jalahalli, Dasarahalli,
Hessargatta (terminal station). Courtesy: Apurva Bose Dutta,
Apprising of the difference in both
Indraneel adds, “Off the road passengers”, says Indraneel. Each Association) and international
stations are possible in non-packed of the metro stations has standard norms have also been adhered to.
areas where there is lots of dimensions – 135 m long x 16 m / Referring to the other metros in
available land. It is easier to design 18 m wide. The width of the stations India Indraneel maintains that he
compared to ‘on the road’ stations was finalised considering the prefers the Kolkata one, since the
which are a structural challenge length of roads in Bengaluru which Delhi metro concentrates more on
since in them there is a median of are between 18m - 24m. The length function without paying much
a single pier of columns to which was calculated keeping in mind the importance to form. Abroad, his any
the load gets transferred. On ‘off length of the coaches (the width of day preference is the Jubilee Line,
the road’ stations you have one coach is 19m). According to London.
columns at both ends of the designs and calculations three
coaches would suffice for the Planning
structure for the load to distribute.”
amount of people travelling up to The metro lines in case of the R3
The Terminal stations have been
2015; after which the length has corridor have been kept parallel to
designed on a budget of 45 crores.
been maintained to adjust three the highway. In the R2 corridor the
Diagram for the additional coaches. Provisions have canopies of the metro stations fall
been made for peak hours till 2015 on the road. The entrance system
Different Reaches for the addition of three more on the footpath leads to the
Concept coaches if the existing three don’t escalator which leads to an unpaid
The metro stations have been suffice. It is also of note that these and paid concourse level. Part of
designed bearing in mind the vision trains will be electric trains sans the unpaid level also serves as the
to provide passengers with a engine. operational area where the staffs
secure, comfortable and an The stations have been so sits and the remaining has
attractive commuting experience. conceptualized that any station can automatic devices for tickets. The
“We got the preliminary design be evacuated in five minutes flat. paid levels in some of the stations
report by the BMRCL which This is based on the calculations have retail also. The next level above
contained a detailed survey of the of the ridership data that the this level is the platform level where
area on which the track has to government has provided the trains come. Circulation through
come up, its alignment, soil test architects. Based on this data which these levels is via stairs or elevator.
data, rider ship data and norms to keeps in mind the population and On each platform, there is one
be followed. These stations have local transit, staircase widths and escalator with a space provision for
been designed considering the platform widths have been finalized. a second one in the future.
public in general, operator and the NFPA (National Fire Protection Indraneel also points out at the

80 NBM&CW FEBRUARY 2010


Project Report

new strategy coming up… of these voltaic on the roof of one of the and Indraneel didn’t want to repeat
metro stations opening up into metro stations, different roof forms any of his designs. The result is
malls, one such being designed by to get in light, and harvesting rain definitely some swanky looking
the Mantri developers. water; but these concepts weren’t designs palpable of Bengaluru’s
The architect came up with okayed. Within very strict timelines contemporary architecture and
creative ideas–like having photo the product had to be delivered, evocative of a mesmerising image
of the IT Capital. Structural Glazing
and Natural stone form a part of all
the metro stations, with varied
additional materials being used in
them individually – like sandstone
in the Peeniya Village Station, ACP
in Ulsoor Station and regular plaster
in the Mysore Road station. All
thanks to the design, there is no
artificial light needed before 6 pm.
Track ceiling lights like ‘Hunter
Douglas’ with mirror optic tube
lights and CFL’s light up the
stations after evening. The
architects have also envisioned the
Metro as a means of ameliorating
the quality of urban life. Besides
the stations serving their basic

NBM&CW FEBRUARY 2010 81


Project Report

the metro everyday is estimated at


10.20 lakh in 2011 and 16.10 lakh
in 2021. With so much of pressure
on the transport system, everyone
is waiting for the metros which have
been in planning for long. Once
complete, they would be easing out
the traffic congestion, strains on the
road and reduction of pollution
levels. It is envisaged that the travel
time from end to end on the east-
west corridor will be 33 minutes,
and on the north-south corridor will
be 28 minutes. At the time DKA
took on this project, there was no
rule book in India detailing fire
norms for the design of metros.
Interior view of a station The Kolkata Metro was designed
without a rule book and the Delhi
Metro was designed on
international norms. But the
relevance of metros is fast pacing
up in India, with today a set of
rules being adopted for metro
constructions. The Bengaluru metro
story doesn’t end here. It is touted
to be one of the biggest
infrastructure projects for the city till
date. Though at present 43 stations
are being constructed which would
get completed by 2015 but the DBR
(Design Basis report) issued by
BMRCL shows an approval for 162
functions, there is a plaza for street Conclusion stations which means that in future
performance at the Mysore road there would be tributaries on the
Bengaluru has a population nearing
terminus, space for fairs, exhibitions North-South and East West
seven million. The number of
and a commercial complex at the corridors.
passengers expected to travel on
Magadi Road Station, site for
advertising and pathways to be used
for temporary exhibitions and
shopping.
Dwelling on the structure of the
stations Indraneel adds, “The
structural design was very
challenging on the single pier
design as the entire load of the
cantilevers (9m on either side) and
tracks station loads were on a
single pier. Also, the structure had
to take into account a lot of
movement from the trains coming
in and out. The roof truss had to be
designed to take into account a lot
of wind load from an approaching
train.”

84 NBM&CW FEBRUARY 2010


Project Report

For DKA, the approach to a project involves a


thorough knowledge about the programme, an in-
depth study of the images that the client has in
mind, stressing on the form and then fitting in the
function into it. Brinda and Indraneel have also
formed HybridArch under DKA for out-of-the-box
thinking projects, for experimentation with
architecture and product designs, one of them
being a luxury hotel in Slovakia that they are currently
working on. On a concluding note, Indraneel
affirmatively says, “We are amongst the five firms
in India which specialise in metro design. We just
need the ridership data to design a metro station.
We are a young firm and have established
ourselves as a totally architectural firm since 2006.
In three years, we have completed 3 million sqft of
construction in commercial and residential projects.
Our firm is consciously working towards aviation
projects like airports, bus terminals etc. The
Bengaluru metro project once completed will be
the best in India.”
The metro debate however does exist; making
everyone ponder if this would be the best solution
for Bengaluru people and traffic. Options like BMTC
buses might just fare better considering the
coverage, accessibility, commute time, cost and
economic viability. With bated breaths, we need to
wait and watch!!!
Bangalore-based architect Apurva Bose Dutta is
an architectural journalist and she can be contacted
at apurvabose@yahoo.com.

NBM&CW FEBRUARY 2010 85