CPCCPB3008A

Mix plastering compounds

TRAINERS ANSWER PACK


Type Title Standard Issue Version Ref Release date
TAP CPCCPB3008A NVR Standard 15.5 1 1 Mix Plastering Compounds 16/10/2014 Page 2 of 8
19/082013
TRAINER INSTRUCTIONS
This package has been compiled to assist Trainers in the onsite, timely and accurate
correction of students written or verbal assessments. All pages of the “Assessment Package”
are to be returned to TAM Administration for the recording of the student’s attainment.
Forms of Assessment
The trainer is required to obtain at least 3 types of evidence but preferably more. These may
include but are not limited to the following:-

1. Written or Verbal Assessment (the later for those with writing or literary difficulties)
2. Observation by the Trainer of ‘on-site work’ called Practical Assessment for work
carried out on the student’s jobsite.
3. A Third Party Report completed by the employer after he is satisfied that the
student/trainee has demonstrated the required knowledge and skills consistently whilst
on the job.
4. A Photographic Record of work completed on site corroborated/signed by the
employer where possible with the trainee carrying out the actual work. These photos
should contain name, date, and the units that are supported by the photographic
evidence. (Only to be used as supportive evidence)
5. Other forms of evidence including recognition of prior learning and skills, corroborated
by a former employer accompanied by photographic evidence or a CT being a credit
transfer from a previous RTO where a trainee has already completed some or that
entire unit of competency.
Completing the Assessment Cover Sheet
• Trainer is to tick the Yes box against each Form of Evidence if the student has completed
this part successfully.
• Trainer is to place a cross (X) against any element attempted that is not successful.
• Do not place anything against evidence if the student has not attempted it.
• Ensure that you can provide evidence of all assessments attempted. A minimum of 3
items of assessment, at a satisfactory standard, are required for students to achieve
competency. Normally it is possible to provide more.
Student Feedback
Trainer is to ensure that at the completion of the training course (Qualification) an AQTF
feedback form is completed, and forwarded to Administration for processing.
Administration Processing
Administration personnel must ensure all relevant forms of assessment are attached prior to
processing the outcomes of the training and assessment. If there is any information not
finalised the complete package for that student must be returned to the relevant trainer to
rectify.

Type Title Standard Issue Version Ref Release date


TAP CPCCPB3023A NVR Standard 15.5 1 001 Load & unload plaster & plaster-related products 01/05/2014 Page 3 of 8
19/082013
Written Assessment Answers

Question 1
Log Book or Training Record Book is to be completed on all units of competency, who is
responsible for recording the on-site information.
A The Learner (apprentice)

Question 2
When working outside it is recommended that sun creams be worn name the rating
required.
 
A 15 plus

Question 3
Plasterboard sheets or other products such as fibre cement boards shall always be
handled carefully any carrying should be done by how many people.

A 2 person

Question 4
When uncertain about proper safety measures and an injury is possible, what is your
requirement.

A Refer to supervisor

Question 5
A level 4 Finish is generally the accepted level of finish for domestic construction and
requires a three coat system, consisting of:

A First coat or taping in


Second coat
Top coat

Question 6
Fill in the missing word
Setting type compounds produce ________________ joints and reduce installation delays
and shrinkage associated with drying type compounds

A Stronger joint

Question 7
Name some setting time compounds

A Basecoat 45 and 60

Question 8
Name some drying type compounds
A Total coat lite and all purpose

Type Title Standard Issue Version Ref Release date


TAP CPCCPB3008A NVR Standard 15.5 1 1 Mix Plastering Compounds 16/10/2014 Page 4 of 8
19/082013
Question 9
True or False
Do not use a setting type compound over a drying type compound.

A True

Question 10
Drying-type compounds should not be used when the internal temperature is less than
what temperature.

A 10 degrees C

Question 11
True or False
This total coat compound is a drying vinyl-based compound designed for use as a three-
coat, total jointing system.

A True

Question 12
True or False
When constructing wall frames, all studs, plates and noggings must be in alignment.

A True

Question 13
Drywall Masonry Systems, popularly known as.

A Stick-on

Question 14
Fill min the missing word
Paper jointing tape is recommended for the strongest possible joint reinforcement. The use
of ____________ tape is not recommended.

A Mesh tape

Question 15
Is this statement correct?
Fibreglass tape will not resist movement of the framing timbers. (Its use in ceiling and butt
joints should be avoided).

A True

Question 16
Where would a level 4 finish be used?

A Residential construction

Type Title Standard Issue Version Ref Release date


TAP CPCCPB3008A NVR Standard 15.5 1 1 Mix Plastering Compounds 16/10/2014 Page 5 of 8
19/082013
Question 17
Does this product need to be mixed

A Yes
“Some folks think the words "ready-mixed" or "pre-mixed" mean the mud is ready to use
straight out of the tub. Not so. Well, you can, but not if you want good results. Pre-mixed
mud has been blended with water, but it's not smooth. If you want smooth, even walls, not
to mention a lot fewer headaches, you have to mix pre-mixed mud”.

Question 18
What is this product used for

A A tool to Scoop our mud

END

Type Title Standard Issue Version Ref Release date


TAP CPCCPB3008A NVR Standard 15.5 1 1 Mix Plastering Compounds 16/10/2014 Page 6 of 8
19/082013
Type Title Standard Issue Version Ref Release date
TAP CPCCPB3008A NVR Standard 15.5 1 1 Mix Plastering Compounds 16/10/2014 Page 7 of 8
19/082013
Type Title Standard Issue Version Ref Release date
TAP CPCCPB3008A NVR Standard 15.5 1 1 Mix Plastering Compounds 16/10/2014 Page 8 of 8