Week: 17 [ 9th to 13th March]

Date: Monday 9th March 2020.


Site Specification:
Task/List of Activities

Officers attending the Job

Skills Learned

Status and Updates

Target/Completion Date

Date: Tuesday 10th March 2020.


Site Specification: GUA 109 (Rua Sura)
Task/List of Activities

1. Refiling the Site.


 Collection of OBM (Outboard Motor) engine and Generator oil from Tasahe
(HON 101).
 Collection of fuel drums (2 x 44 Galloon diesel fuel drums) from Markwarth
Oil Limited, Point Cruz to refill the site.
 Refuel fuel containers from Point Cruz Fuel Station. Return to Yatch Club
(Point Cruz) to unload OBM, Fuel drums and load things for travelling in the
Company boat.
 Upon arrival, the fuel and oil level of the generator were checked; Fuel level is
satisfactory while the oil level is very low. The generator was turn off while
refueling the fuel and oil.
 After fueling, the generator fail to start.

2. Rectified the Generator, which fail to start.


 The batteries were checked if there are loose connection and the battery voltage
level recorded.
 Continuity test were perform on the entire fuse in the PowerWizard control
panel-using multimeter. Bad fuse were replaced with new ones.
 A backup battery was brought from the cabinet and connected in series with the
actual batteries in the generator to produce desire voltage to start of the
generator.

Officers attending the Job


 Brendan Manerara (Transmission Support Engineer)
 Walter Taravu (Field Engineer)

Skills Learned
There are few things I’ve to check apart from fuel and oil if the generator fail to start;
 Battery failure
a) Generator can’t start if there are loose connection or buildup of lead sulphate
crystals on the plate leading battery not being able to provide enough current.
b) Low voltage. Thus, the battery must have enough voltage to start the generator.
It is important to note the drop-off voltage reading of the battery at the instant
when you start the generator. If the drop-off voltage reading is below 10V,
then you need to replaced or a backup battery.
 Fuse failure
a) It is important to check the entire fuse in the PowerWizard control panel if it is
working by performed Continuity Test using Multimeter.

Status and Updates


 Generator was fueled and the fault rectified, site online as of 3:30pm.

Target/Completion Date
11/03/2020

Date: Wednesday 11th March 2020.


Site Specification:
Task/List of Activities

Officers attending the Job

Skills Learned

Status and Updates

Target/Completion Date

Date: Thursday 12th March 2020.


Site Specification:
Task/List of Activities

Officers attending the Job

Skills Learned

Status and Updates

Target/Completion Date

Date: Friday 13th March 2020.


Site Specification:
Task/List of Activities
Officers attending the Job

Skills Learned

Status and Updates

Target/Completion Date

Week: 18 [ 16 to 20 March]
Date: Monday 16th March 2020
Site Specification: GUA 105 (Henderson)
Task/List of Activities
1. Removal of ODU from one of standby antenna at GUA105, which will be used to
establish a microwave link between MAL219 and MAL202.
 Collection of toolbox, rope and hook from switch, Tasahe (HON 101).

Officers attending the Job
 Warren Pweka (Operation Manager)
 Maxwell Panasasa (Project Officer)
 Walter Taravu (Field Engineer)

Skills Learned

Status and Updates

Target/Completion Date

Date: Monday 16th March 2020


Site Specification:
Task/List of Activities

Officers attending the Job

Skills Learned

Status and Updates

Target/Completion Date

Date: Monday 16th March 2020


Site Specification:
Task/List of Activities
Officers attending the Job
Skills Learned

Status and Updates

Target/Completion Date

Date: Monday 16th March 2020


Site Specification:
Task/List of Activities

Officers attending the Job

Skills Learned

Status and Updates

Target/Completion Date

Date: Monday 16th March 2020


Site Specification:
Task/List of Activities

Officers attending the Job


Skills Learned

Status and Updates

Target/Completion Date