CONCRETE - NORMAL MIXED

CONCRETE GRADE 15 151.41 RM/m3 CONCRETE GRADE 40 191.58 RM/m3


RM RM
1) Material Qty Rate 1) Material Qty Rate
Redy Mixed Grd 1 1 151.41 /m3 = 151.41 m3 Redy Mixed Grd 1 1 191.58 /m3 = 191.58 m3
Curing Compound 1 1.00 /m2 = 1.00 m3 Curing Compound 1 1.00 /m2 = 1.00 m3

2) Labour 8 60 /day 480 /day = 8.00 m3 2) Labour 8 60 /day 480 /day = 8.00 m3
60 m3/day 60 m3/day

3) Machine Qty Rate Total = 10.42 m3 3) Machine Qty Rate Total = 10.42 m3
Crane 1 600 /day 600 /day Crane 1 600 /day 600 /day
Pump 300 /day 0 /day Pump 300 /day 0 /day
Vibrator 1 25 /day 25 /day Vibrator 1 25 /day 25 /day
60 m3/day 625 /day 60 m3/day 625 /day

4) Fuel Qty Rate RM 1.8 /day = 12.60 m3 4) Fuel Qty Rate RM 1.8 /day = 12.60 m3
Crane 1 200 lit/day 200 lit/day Crane 1 200 lit/day 200 lit/day
Pump 25 /day 0 /day Pump 25 /day 0 /day
Vibrator 1 10 lit/day 10 lit/day Vibrator 1 10 lit/day 10 lit/day
60 m3/day 210 183.43 m3 60 m3/day 210 223.60 m3
5) Wastage & 3% 5.50 m3 5) Wastage & 3% 6.71 m3
Unefficencies Unefficencies
6) Design & Fluctuati 0% - m3 6) Design & Fluctuati 0% - m3
Elements Elements

RAW COST 188.93 m3 RAW COST 230.30 m3


50mm thk per 1m2 = 9.45 m2 50mm thk per 1m2 = 11.52 m2

7) Profit 10% 18.89 m3 7) Profit 10% 23.03 m3


207.82 m3 253.34 m3
50mm thk per 1m2 = 10.40 m2 SAY 208.00 m3 50mm thk per 1m2 = 12.65 m2 SAY 253.00 m3