● Two under or over frequency stages
● Fully independent or differential
pick-up/drop-off operation
● Wide frequency setting range
● Built-in timer for each stage
● Wide operating voltage range
● Positive calibrated settings by
means of switches
● Test facility
2
Case earth
1 2
3 4
28
5 6
7 8 27 V , f1
9 10 V
T1 T T1 1
26
11 12
. f1
13 14 1
15 16
17 18 T2 T T2
, f2 2
3
19 20 5
21 22 Test . f2 RL1–1
2
23 24 1 t1 Set
f1 4
25 26 RL1 Reset
Reset 6
27 28 V f2 : f1 2 RL1–2
Set Reset 9
t2 PU : DO
f2
Module terminal 2 f2 : f2 Set 11
Inputs, Outputs and Indications frequency monitoring circuit. Each 0.00001s. This corresponds to a
output relay provided two changeover frequency setting range of 10.001 to
Three terminals are provided for the contacts. 500Hz.
voltage input to the frequency Front plate mounted leds are provided Switches are provided on the relay
monitoring circuits of which two are to indicate the operation of each of front plate to select and, also, to
selected depending on the maximum the two monitoring circuits. These can inhibit the operation of either channel.
voltage which can appear at the be reset by a push-button which can Note: The channel on/off switch must
terminals. The voltage input be operated with the front cover of the be in the off position before
connections must be either phase-to- relay in position. attempting to alter the T setting whilst
phase or phase-to-neutral and the
Operation of the relay can be tested the relay is in service.
maximum permissible input voltage for
by means of a test push-button which A further switch is provided to select
each pair of terminals is detailed in
energises the output relays and leds either independent operation of the
Figure 4. The relay can be supplied
after the set time delays which the two channels or configuration of the
for use with either ac or dc auxiliary
channels set to underfrequency two channels with f2 as pick-up and f1
supply voltage.
operation. Access to the test push- as drop-off. In this configuration,
For applications in which operation of button requires removal of the front output auxiliary relay RL2 energises at
the relay and subsequent load cover. This test facility should only pick-up (setting f2) and de-energises at
shedding is not desired, when the normally be used with the relay trip drop-off (setting f1). The output
system voltage drops to a very low circuits isolated. auxiliary relay RL1 energises and de-
value, it is recommended to drive the
energises at the f1 setting.
auxiliary voltage from the same
source as the measured voltage. With
Relay Settings Definite time delays t1 and t2 for the
this method, the relay stops operating two channels are set by means of
The two frequency detector circuits
when the voltage drops below switches. Each channel is adjustable
have set frequencies defined
approximately 65%. When a different between 0.1 and 21.15s in steps of
by f1 = 1 and f2 = 1
voltage cut-off is specified, it is 0.05s.
T1 T1
recommended to use a separate It should be noted that it is possible,
undervoltage relay MVTI with the where T1 and T2 are the periods of by use of the thumbwheel switches, to
underfrequency relay MFVU 21, the operation frequencies in seconds set frequencies higher than 500Hz,
suitable for dc auxiliary supply voltage. and are set by thumb-wheel switches but beyond 500Hz the operation
on the relay frontplate. characteristics of the relay cannot be
Separate electromagnetic auxiliary
output relays are provided for each In each case, T is selectable between guaranteed.
0.09999s and 0.00200 in steps of
3
Case earth
1 2
3 4
28
5 6
7 8 27 V , f1
9 10 V
T1 T T1 1
26
11 12
. f1
13 14 1
15 16
17 18 T2 T T2
, f2 2
3
19 20 5
21 22 Test . f2 RL1–1
2
23 24 1 t1 Set
f1 4
25 26 RL1 Reset
Reset 6
27 28 V f2 : f1 2 RL1–2
Set Reset 9
t2 PU : DO
f2
2 f2 : f2 Set 11
Module terminal 13
block viewed from rear RL2–1
RL2 10
L/+ + 17
+ 2
V 12
Vx A – 18 Reset
V 0V
– RL2–2 14
Note 1 N/–
(a) CT shorting links make
before (b) & (c) disconnect
A: Auxilliary supply unit required for ac and dc power supplies
(b) Short terminals break before (c) for Vx .125V and is for use with 110V dc relay
(c) Long terminals
400
300
Input at terminals 28–27
200
100
30
15
0 10 20 30 40 50 60 Hz
4
Technical Data
AC voltage ratings Phase-to-phase or phase-to-neutral
See Figure 4 for maximum admissible
voltage value
Minimum operating voltage
(terminals 28-27): 10V
Minimum operating voltage
(terminals 28-26): 20V
Settings
T1 and T2 0.09999s to 0.00200s adjustable in
steps of 0.00001s independently
(f1 = 1 Hz) (f2 = 1 Hz)
T1 T2
Contacts
2 changeover self reset - trip output f1
2 changeover self reset - trip output f2
Ratings
Carry continuously 5A
Make and carry for 0.5s 30A at 110V dc
Breaking capacity (105 operations) 0.3A at 110V dc L/R = 40ms
Burdens
Measuring circuits 1VA at 150V and 50Hz
Auxiliary supply:
relay de-energised < 30mA (dc)
< 60mA (ac)
relay energised As above plus 2W
5
Accuracy
Variation in auxiliary supply ±3%
Variation in temperature (–25°C to +55°C) ±3%
Frequency detector
Measuring time 50ms
Reset time < 50ms
Time measurement error of 1 cycle < 10µs
Timer
Timing circuit errors
Basic accuracy ±3%, not less than 20ms
Consistency ±1.5%, not less than 20ms
Thermal withstand
Terminals 28–26 450V 50Hz 5s
540V 60Hz 5s
Terminals 28–27 225V 50Hz 5s
270V 60Hz 5s
Voltage withstand
Insulation
IEC 255–5 2kV rms for 1 minute between all case
terminals connected together and the
case earth terminal
2kV rms for 1 minute between
independent circuits including contact
circuits
1kV rms for 1 minute across normally
open outgoing contact pairs
High voltage impulse withstand
IEC 255–5 5kV peak, 1.2/50µs, 0.5J between all
terminals and case earth and between
independent circuits
High frequency disturbance test
IEC 255–22–1 Class III 1MHz burst decaying to 50% of peak
value after 3 to 6 cycles
Repetition rate: 400 per second
2.5kV peak between independent
circuits and between circuits and
case earth
1.0kV peak across input circuits
Environmental withstand
Temperature
IEC 68–2–1/IEC 68–2–2 Storage and transit –25°C to +70°C
Operating –25°C to +55°C
Humidity
IEC 529 56 days (dust protected)
Vibration
IEC 255–21–1 0.5g between 10Hz and 150Hz
Mechanical durability
Loaded contact 10,000 operations minimum
Unloaded contact 100,000 operations minimum
6
Cases
MFVU 21 relays are housed in size 4 52
cases (see Figure 5) 4 holes 4.4 23.5
97
Information Required
with Order 168 159
Push button 99
projection 10 max
Panel cut-out:
Flush mounting fixing details
32 212 25 min.
Reset