INSULATION RESISTANCE TEST REPORT FOR DOCUMENT NUMBERING:

CONTROL CABLES

Project: Aqaba Screening Project task 5 of APC storing Contractor: Negemco

Employer: Arab Potash Company (APC)

EQUIPMENT NO:
SYSTEM/SUBSYSTEM No:
DESCRIPTION:

REPORT No:

INSULATION TEST

CABLE IDENTIFICATION (TAG): CABLE TYPE (cores/mm2):

TEST VOLTAGE: ____________________________VDC


ACCEPTANCE TEST VALUE: > _________________________________ Mega ohms
Duration: 1 min

Conduct test with instruments disconnected Do not test coaxial / telecom cables

Insulation Test on Armour Vs Overall Shield (Ω):

NOTE: ORIGIN and DESTINATION conductor CONNECTIONS must be checked according to WIRING DIAGRAM

INSULATION RESISTANCE (OHMS)

CONTINUITY &
NUMBER ORIGIN DESTINATION CONNECTION
CONDUCTOR TO RACEWAY, CONDUCTOR TO CHECKING
CONDUCTOR TO SHIELD
ARMOUR OR EARTH CONDUCTORS

TEST EQUIPMENT:
EQUIPMENT NAME, MANUFACTURER
AND MODEL:
SERIAL NUMBER:
CAL. CERTIFICATE NUMBER.:
CALIBRATION DATE
(FROM-TO):
REMARKS:
WITNESSED/REVIEWED BY: CONTRACTOR (NEGMCO) ENGINEER (DAR) APC (IF Required)

SIGNATURE:

PRINT NAME:

DATE: