Вы находитесь на странице: 1из 11

Project: ETAP Page: 1

Location: 20.0.0C Date: 08-11-2020


Contract: SN: GASMARSA
Engineer: Revision: Base
Study Case: TT
Filename: BHPspence Config.: Normal

Electrical Transient Analyzer Program

Short-Circuit Analysis

ANSI Standard

3-Phase Fault Currents

Swing V-Control Load Total

Number of Buses: 2 0 3 5

Line/Cable/
XFMR2 XFMR3 Reactor Busway Impedance Tie PD Total

Number of Branches: 2 0 0 0 0 1 3

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total

Number of Machines: 0 1 0 21 0 22

System Frequency: 60.00

Unit System: English

Project Filename: BHPspence

Output Filename: C:\Users\Gasmar\Desktop\Robert\Untitled.SA1S


Project: ETAP Page: 2
Location: 20.0.0C Date: 08-11-2020
Contract: SN: GASMARSA
Engineer: Revision: Base
Study Case: TT
Filename: BHPspence Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable / Busway Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable / Busway Resistance: Yes Individual


Project: ETAP Page: 3
Location: 20.0.0C Date: 08-11-2020
Contract: SN: GASMARSA
Engineer: Revision: Base
Study Case: TT
Filename: BHPspence Config.: Normal

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

Bus00 SWNG 23.000 23.000 1 100.00 0.00


Bus01 Load 23.000 23.000 1 100.00 0.00
Bus2 Load 0.380 0.380 1 100.00 0.00
Bus02 ,50HZ ,3F+N+T Load 0.380 0.380 1 100.00 0.00
Bus3 SWNG 0.380 0.386 2 203.16 0.00

5 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP.
Project: ETAP Page: 4
Location: 20.0.0C Date: 08-11-2020
Contract: SN: GASMARSA
Engineer: Revision: Base
Study Case: TT
Filename: BHPspence Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z

T1 1.000 23.000 0.380 5.75 5.79 0 0 0 0 0 5.7500

T2 0.025 0.380 0.380 2.30 1.13 0 0 0 0 0 2.3000


Project: ETAP Page: 5
Location: 20.0.0C Date: 08-11-2020
Contract: SN: GASMARSA
Engineer: Revision: Base
Study Case: TT
Filename: BHPspence Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

T1 2W XFMR Bus01 Bus02 ,50HZ ,3F+N+T 97.86 566.61 575.00

T2 2W XFMR Bus02 ,50HZ ,3F+N+T Bus2 6097.00 6889.60 9200.00


CB1 Tie Breaker Bus00 Bus01
Project: ETAP Page: 6
Location: 20.0.0C Date: 08-11-2020
Contract: SN: GASMARSA
Engineer: Revision: Base
Study Case: TT
Filename: BHPspence Config.: Normal

Power Grid Input Data

% Impedance
Power Grid Connected Bus Rating 100 MVA Base
ID ID MVASC kV X/R R X

U1 Bus00 1593.487 23.000 15.00 0.41744 6.26165

Total Connected Power Grids (= 1 ): 1593.487 MVA


Project: ETAP Page: 7
Location: 20.0.0C Date: 08-11-2020
Contract: SN: GASMARSA
Engineer: Revision: Base
Study Case: TT
Filename: BHPspence Config.: Normal

Induction Machine Input Data

% Impedance
Induction Machine Connected Bus Rating X/R Ratio Machine Base
ID Qty ID HP/kW kVA kV RPM X"/R X'/R R X" X'

Motors
Mtr28 1 Bus02 ,50HZ ,3F+N+T 11.00 12.27 0.380 1800 2.58 2.58 10.78 27.83 9999.00
Mtr27 1 Bus02 ,50HZ ,3F+N+T 5.50 6.60 0.380 1800 1.83 1.83 15.24 27.83 9999.00
Mtr2 1 Bus02 ,50HZ ,3F+N+T 1.00 1.42 0.380 1800 0.78 0.78 35.74 27.83 9999.00
Mtr1 1 Bus02 ,50HZ ,3F+N+T 1.00 1.42 0.380 1800 0.78 0.78 35.74 27.83 9999.00
Mtr7 1 Bus02 ,50HZ ,3F+N+T 1.00 1.42 0.380 1800 0.78 0.78 35.74 27.83 9999.00
Mtr6 1 Bus02 ,50HZ ,3F+N+T 1.00 1.42 0.380 1800 0.78 0.78 35.74 27.83 9999.00
Mtr8 1 Bus02 ,50HZ ,3F+N+T 1.00 1.42 0.380 1800 0.78 0.78 35.74 27.83 9999.00
Mtr9 1 Bus02 ,50HZ ,3F+N+T 1.00 1.42 0.380 1800 0.78 0.78 35.74 27.83 9999.00
Mtr10 1 Bus02 ,50HZ ,3F+N+T 1.00 1.42 0.380 1800 0.78 0.78 35.74 27.83 9999.00
Mtr11 1 Bus02 ,50HZ ,3F+N+T 3.00 3.81 0.380 1800 1.35 1.35 20.63 27.83 9999.00
Mtr12 1 Bus02 ,50HZ ,3F+N+T 3.00 3.81 0.380 1800 1.35 1.35 20.63 27.83 9999.00
Mtr13 1 Bus02 ,50HZ ,3F+N+T 3.00 3.81 0.380 1800 1.35 1.35 20.63 27.83 9999.00
Mtr14 1 Bus02 ,50HZ ,3F+N+T 3.00 3.81 0.380 1800 1.35 1.35 20.63 27.83 9999.00
Mtr15 1 Bus02 ,50HZ ,3F+N+T 3.00 3.81 0.380 1800 1.35 1.35 20.63 27.83 9999.00
Mtr16 1 Bus02 ,50HZ ,3F+N+T 3.00 3.81 0.380 1800 1.35 1.35 20.63 27.83 9999.00
Mtr18 1 Bus02 ,50HZ ,3F+N+T 5.50 6.60 0.380 1800 1.83 1.83 15.24 27.83 9999.00
Mtr17 1 Bus02 ,50HZ ,3F+N+T 0.50 0.80 0.380 1800 0.55 0.55 50.54 27.83 9999.00
Mtr23 1 Bus02 ,50HZ ,3F+N+T 5.50 6.60 0.380 1800 1.83 1.83 15.24 27.83 9999.00
Mtr20 1 Bus02 ,50HZ ,3F+N+T 5.50 6.60 0.380 1800 1.83 1.83 15.24 27.83 9999.00
Mtr19 1 Bus02 ,50HZ ,3F+N+T 5.50 6.60 0.380 1800 1.83 1.83 15.24 27.83 9999.00
Mtr25 1 Bus3 60.00 61.35 0.380 1800 6.03 6.03 3.32 20.00 50.00

Total Connected Induction Motors ( = 21 ): 140.2 kVA


Project: ETAP Page: 8
Location: 20.0.0C Date: 08-11-2020
Contract: SN: GASMARSA
Engineer: Revision: Base
Study Case: TT
Filename: BHPspence Config.: Normal

VFD Input Data

AC Rating
% Impedance
kVA kV FLA Input Output Bypass Equipment Base
ID Output Input Output Input Output % EFF % PF Hz % Imax Switch R X

VFD001 60.00 0.400 0.386 158.77 89.74 100.00 54.55 42.00 150.0 No 66.67 0.00
Project: ETAP Page: 9
Location: 20.0.0C Date: 08-11-2020
Contract: SN: GASMARSA
Engineer: Revision: Base
Study Case: TT
Filename: BHPspence Config.: Normal

SHORT-CIRCUIT REPORT

3-phase fault at bus: Bus02 ,50HZ ,3F+N+T


Prefault voltage = 0.380 kV = 100.00 % of nominal bus kV (0.380 kV)
= 100.00 % of base (0.380 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus02 ,50HZ ,3F+N+T Total 0.00 4.606 -26.062 5.7 26.466

Bus01 Bus02 ,50HZ ,3F+N+T 98.93 4.420 -25.763 5.8 26.140

Bus2 Bus02 ,50HZ ,3F+N+T 0.00 0.000 0.000 999.9 0.000

Mtr28 Bus02 ,50HZ ,3F+N+T 100.00 0.023 -0.058 2.6 0.062

Mtr27 Bus02 ,50HZ ,3F+N+T 100.00 0.015 -0.028 1.8 0.032

Mtr2 Bus02 ,50HZ ,3F+N+T 100.00 0.004 -0.003 0.8 0.005

Mtr1 Bus02 ,50HZ ,3F+N+T 100.00 0.004 -0.003 0.8 0.005

Mtr7 Bus02 ,50HZ ,3F+N+T 100.00 0.004 -0.003 0.8 0.005

Mtr6 Bus02 ,50HZ ,3F+N+T 100.00 0.004 -0.003 0.8 0.005

Mtr8 Bus02 ,50HZ ,3F+N+T 100.00 0.004 -0.003 0.8 0.005

Mtr9 Bus02 ,50HZ ,3F+N+T 100.00 0.004 -0.003 0.8 0.005

Mtr10 Bus02 ,50HZ ,3F+N+T 100.00 0.004 -0.003 0.8 0.005

Mtr11 Bus02 ,50HZ ,3F+N+T 100.00 0.010 -0.013 1.3 0.017

Mtr12 Bus02 ,50HZ ,3F+N+T 100.00 0.010 -0.013 1.3 0.017

Mtr13 Bus02 ,50HZ ,3F+N+T 100.00 0.010 -0.013 1.3 0.017

Mtr14 Bus02 ,50HZ ,3F+N+T 100.00 0.010 -0.013 1.3 0.017

Mtr15 Bus02 ,50HZ ,3F+N+T 100.00 0.010 -0.013 1.3 0.017

Mtr16 Bus02 ,50HZ ,3F+N+T 100.00 0.010 -0.013 1.3 0.017

Mtr18 Bus02 ,50HZ ,3F+N+T 100.00 0.015 -0.028 1.8 0.032

Mtr17 Bus02 ,50HZ ,3F+N+T 100.00 0.002 -0.001 0.6 0.002

Mtr23 Bus02 ,50HZ ,3F+N+T 100.00 0.015 -0.028 1.8 0.032

Mtr20 Bus02 ,50HZ ,3F+N+T 100.00 0.015 -0.028 1.8 0.032

Mtr19 Bus02 ,50HZ ,3F+N+T 100.00 0.015 -0.028 1.8 0.032

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.
Project: ETAP Page: 10
Location: 20.0.0C Date: 08-11-2020
Contract: SN: GASMARSA
Engineer: Revision: Base
Study Case: TT
Filename: BHPspence Config.: Normal

Momentary Duty Summary Report

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Momentary Device
Bus Device Duty Capability
Symm. X/R Asymm. Asymm. Symm. Asymm. Asymm.
ID kV ID Type kA rms Ratio M.F. kA rms kA Peak kA rms kA rms kA Peak

Bus02 ,50HZ ,3F+N+T 0.380 Bus02 ,50HZ ,3F+N+T MCC 26.466 5.8 1.293 34.224 59.128 85.000 106.000

- Method: IEEE - X/R is calculated from separate R & X networks.


- Generator protective device duty is calculated based on maximum through fault current. Other protective device duty is calculated based on total fault current.

- The multiplication factors for high voltage circuit-breaker and high voltage bus momentary duty (asymmetrical and crest values) are calculated based on system X/R.

* Indicates a device with momentary duty exceeding the device capability.


Project: ETAP Page: 11
Location: 20.0.0C Date: 08-11-2020
Contract: SN: GASMARSA
Engineer: Revision: Base
Study Case: TT
Filename: BHPspence Config.: Normal

Interrupting Duty Summary Report

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Bus Device Interrupting Duty Device Capability

CPT Symm. X/R Adj. Sym. Test Rated Adjusted


ID kV ID Type (Cy) kA rms Ratio M.F. kA rms kV PF Int. Int.

Bus02 ,50HZ ,3F+N+T 0.380 incoming -CB5-1 InsulUnfuse 26.466 5.8 1.037 27.448 0.480 20.00 65.000 65.000

- Method: IEEE - X/R is calculated from separate R & X networks.


- HV CB interrupting capability is adjusted based on bus nominal voltage.
- Short-circuit multiplying factor for LV Molded Case and Insulated Case Circuit Breakers is calculated based on asymmetrical current.
- Generator protective device duty is calculated based on maximum through fault current. Other protective device duty is calculated based on total fault current.

* Indicates a device with interrupting duty exceeding the device capability


** Indicates that the circuit breaker has been flagged as a generator circuit breaker. However, ETAP could not detect a single path, without a transformer, to the specified generator.
Therefore, this circuit breaker is treated as a regular circuit breaker in short-circuit calculations.
+ The prefault voltage exceeds the rated maximum kV limit of the circuit breaker - The rated interrupting kA must be derated.