Вы находитесь на странице: 1из 3

All bus bars shall be marked with normal current , short time current rating with duration at ** degree

& BIL****KV.
1
Provision for future bays as per tender SLD shall be provided.
2
Current rating for CBs, Disconnectors shall be mentioned (1500A for all feeders , 2000A for bus coupler). Moreover. Actual cu
3
4 Line side earth switches for feeder bays and bus bar earthing switches shall be fault making type.
All earthing switches shall have isolating facility for primary injection purpose.
5
6 Primary injection current and duration shall be indicated in the drawing
Location of CTs and VTs shall be as per tender single line diagram
7
8 VT shall be provided without isolator.
Polarity of CTs are mentioned as per tender SLD
9
Provision for future lightening arrestor for each line feeder shall be provided.
10
Arrangement of the circuit shall be from left to right when standing between GIS & LCC and looking to GIS.
11
12 Bus bar 1,3,5 shall be located bottom side( starting from left to right).
Bus bars 2,4,6 shall be located on top side ( starting from left to right).
13
14 Bus bar -1 disconnector shall be shown on left side and bus bar-2 disconnector shall be shown on right side for all feeders.
All feeders, CBs, disconnectors & earth switches shall be marked with SCADA numbers and device number( Q. number).
15
All feeders shall be marked with bay number, Scada number and feeder name (with number 1&2 in case of two feeders are co
16
17 Maintenance earth switches shall be provided on both sides of CB and shall have different legend from fault making earth swi
Following details shall not be indicated on SLD, to be shown only in the respective drawings.
18
- Power cables and earthing cables sizing details.
Power transformers with ratings , earthing transformers with ratings and neutral earthing for transformers shall be shown with th
19
CT/VT characteristics are mentioned as per CT/VT characteristics approved by DEWA in tabular format.
20
Symbols and details shall be given in Legend matching with SLD .
21
22 Number of reactors in line feeders, Remote ends etc shall be in line with PPR.
Provision of future cable head chamber for future reactor shall be provided for bays around bus coupler E05, E07
23
The adopted CT ratio is not mentioned since the same is not required to be shown in single line diagram
24
25 Only main protection function like M1FP, etc only shall be mentioned and the other internal functions of main protection like 5
Ratings and short circuit current shall be as per PPR
26
27 CT/VT characteristics shall be specified exactly as per tender SLD, detailed characteristics like Rct, VK, etc. need not be shown
degree & BIL****KV.

us coupler). Moreover. Actual current rating shall be provided also as per GTP.
pe.

ooking to GIS.

on right side for all feeders.


evice number( Q. number).
&2 in case of two feeders are connected to same remote end substation) as per tender document
end from fault making earth switches legend.

nsformers shall be shown with the required CTs.


ar format.

coupler E05, E07


diagram
nctions of main protection like 50BF1, etc is not mentioned

Rct, VK, etc. need not be shown.

Вам также может понравиться