Weekly Report Grinding Aids Cement Mill Project

5/28/2020

6/11/2020

6/18/2020

6/25/2020

7/16/2020

7/23/2020

7/30/2020

8/13/2020

8/20/2020

8/27/2020

9/10/2020

9/17/2020
6/4/2020

7/2/2020

7/9/2020

8/6/2020

9/3/2020
SCOPE

Progress/W
No TASK eek (%)
PLAN DAY ACT PLAN

W0 W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16


A.1 Pipeline Installation
A.1.1 PO and Purchase Equipment 100 10 3.7% 3.7% 1.85% 1.85%
75 21 5.8% 7.7% 2.58% 2.58% 2.58%
MECHANICAL WORK

A.1.2 Delivery Material


A.1.3 Pipe Installation 30 0.0% 11.1% 2.77% 2.77% 2.77% 2.77% 100.00%
A.1.4 Leak Test 5 0.0% 1.8% 1.85% 96.55%
A.2 Pump Installation
93.49%
90.80%
A.2.1 PO and Purchase Equipment 100 10 3.7% 3.7% 1.85% 1.85% 86.21%
A.2.2 Delivery Material 25 84 7.7% 31.0% 2.58% 2.58% 2.58% 2.58% 2.58% 2.58% 2.58% 2.58% 2.58% 83.52%
2.58% 2.58% 2.58%
80.84%
A.2.3 Pump Installation 14 0.0% 5.2% 2.58% 2.58%
74.90%
A.2.4 Function Test 7 0.0% 2.6% 2.58%
B.1 Programming and DCS Graphic 68.20%
B.1.1 Design Programming And Interlocking 100 14 5.2% 5.2% 2.58% 2.58% 60.73%
B.1.2 Design Graphic DCS 50 14 2.6% 5.2% 2.58% 2.58%
B.1.3 Interlock Test 2 0.0% 0.7% 0.74% 52.49%
ELECTRICAL WORK

B.2 Pump Control Panel


45.5%
44.44%
B2.1 PO and Purchase Equipment 100 14 5.2% 5.2% 2.58% 2.58%
B2.2 Delivery Material 100 20 7.4% 7.4% 2.46% 36.53%
2.46%
37.0% 2.46%
B2.3 Wiring Panel and installation 25 14 1.3% 5.2% 2.58% 2.58%
B2.4 Ladder Installation 100 2 0.7% 0.7% 27.84%
27.7% 0.74%
B2.5 Laying Power Cable 100 3 1.1% 1.1% 1.11%
B2.6 Laying Control Cable 100 3 1.1% 1.1%
19.92%
18.5% 1.11%
B2.6 Termination Cable 2 0.0% 0.7% 0.37% 0.37%
11.4%
C.1 Test And Commisioning
9.20%
T&C

C.1.1 Test 1 0.0% 0.4% 0.37%


0.00%
C.1.2 Commisioning 1 0.0% 0.4% 0.37%
OVERAL PROGRESS 271 45.5% 100.0%
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Prog/Week 0.0% 8.9% 10.3% 7.6% 8.4% 7.6% 7.7% 7.9% 7.2% 6.5% 5.7% 2.6% 2.6% 4.4% 2.6% 3.0% 3.3%
Accumulative Progress 0.0% 8.9% 19.2% 26.8% 35.2% 42.8% 50.6% 58.5% 65.7% 72.1% 77.9% 80.4% 83.0% 87.5% 90.0% 93.0% 96.3%
Progress (%) 0.0% 9.20% 19.92% 27.84% 36.53% 44.44% 52.49% 60.73% 68.20% 74.90% 80.84% 83.52% 86.21% 90.80% 93.49% 96.55% 100.00%
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Progress (%) 0.0% 11.4% 18.5% 27.7% 37.0% 45.5%
DASHBOARD GRINDING AID CEMENT MILL PROJECT
Update : 15 Nov 2019

S-Curve
120.0%

100.00%
100.0% 96.55%
90.80% 93.49%
83.52% 86.21%
80.84%
80.0% 74.90%
68.20%
60.73%
60.0%
52.49%
45.5%
44.44%
40.0% 37.0%
36.53%
27.84%
27.7%
19.92%
18.5%
20.0%
11.4%
9.20%

0.0%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Current Progress is cut n fill and concrete bore pile