YANGON
REVISION - II
AUGUST 2020
M & E DESIGN
10. THE LOCATION OF THE THERMOSTAT/FAN SPEED CONTROLLER SHALL BE WIRED TYPE. 18. FRESH AIR FAN (IF ANY) SUPPLIED FOR THE AIR-CONDITIONING SYSTEM SHALL BE LEGENDS
ELECTRICALLY INTERLOCKED WITH ITS RESPECTIVE FAN COIL UNIT. PROJECT TITLE
11. THE FAN & FCU STATIC PRESSURE INDICATED IN THE SCHEDULE ARE FOR GUIDANCE ABBREVIATIONS
DURING TENDERING ONLY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING
19. RUNNING SPEED FOR ALL MECHANICAL VENTILATION FANS SHALL NOT EXCEED 1480 RPM YAY TAR SHAY - FIVE STORIES
THE TOTAL PRESSURE LOSS OF EACH SYSTEM BASED ON THE ACTUAL DUCT RUN AND (UNDER NORMAL CONDITION) OR AS STATED IN THE SCHEDULE ( WHICHEVER IS LOWER),
NEW FRESH AIR DUCT AIR CURTAIN
EQUIPMENT OFFERED. FCU FAN COIL UNIT
SPEED CONTROLLER SHALL BE PROVIDED TO ACHIEVE THE DESIGN REQUIREMENTS.
12. ALL RETURN AIR PLENUM BOX FOR FAN COIL UNITS SHALL BE ACOUSTICALLY TREATED WITH NEW SUPPLY AIR DUCT NRD NON RETURN DAMPER
20. ALL MECHANICAL VENTILATION FANS SHALL BE CONTROLLED BY THE FOLLOWING :- WALL MOUNTED FAN ARCHITECT
50mm THK 80 Kg/m3 ROCK WOOL INSULATION.
a) AUTO-OFF-TEST SWITCH WITH RUNNING AND FAULT LIGHTS INDICATES ON THE LOCAL FD FIRE DAMPER
CONTROL PANEL. NEW KITCHEN EXHAUST DUCT
13. LOCAL CONTROL PANEL FOR EVERY FAN COIL UNITS SHALL BE PROVIDED.
b) START-STOP BY TIMER (AS INDICATED IN THE DRAWINGS/SPECIFICATIONS). A/P 600x600/450X450 CEILING ACCESS PANEL
VCD VOLUME CONTROL DAMPER
NEW TOILET EXHAUST AIR DUCT
PIPEWORK AND FITTINGS 21. THE CONTRACTOR/S SHALL LIAISE WITH THE ELECTRICAL CONTRACTOR/S THE POWER SUPPLY
F/A FROM ABOVE
REQUIREMENTS AND LOCATION OF THE POWER POINT FOR ALL ACMV EQUIPMENT. NEW DCUT C/W EXTERNAL & INTERNAL FAN WITH SILENCERS
1. CONDENSATE DRAIN FOR FAN COIL UNITS SHALL BE MINIMUM Ø20mm UNLESS OTHERWISE INSULATION
T/B TO BELOW
STATED AND SHALL BE INDIVIDUALLY RUN TO THE NEAREST FLOOR TRAP WITH SUFFICIENTLY
22. ALL EQUIPMENT SUPPLIED FOR FIRE SERVICES SHALL BE CAPABLE OF OPERATING NEW FLEXIBLE DUCT
GRADIENT FOR GRAVITY FLOW. CONTRACTOR TO CHECK THE EXACT LOCATION OF NEAREST CEILING FAN T/A TO ABOVE
EFFECTIVELY FOR AT LEAST TWO (2) HOURS AND SHALL BE CONNECTED TO A SECONDARY STRUCTURE
AVAILABLE FLOOR TRAPS AND COORDINATE WITH SANITARY PLUMBING CONTRACTOR FOR POWER SUPPLY. ALL LINKING COMPONENTS AND/OR CABLES FOR THE SYSTEM/S SHALL BE
FIRE RATED TO THE SAME INTREGRITY AS THE FANS IN ACCORDANCE TO FSB CODES AND EXISTING DUCT TO BE REMAINED F/B FROM BELOW
WATER INLET PROVISION TO THE FLOOR TRAP. REQUIREMENTS. TOILET EXHAUST FAN
H/L HIGH LEVEL
2. ALL CONDENSATE SHALL BE DRAIN TO THE NEAREST FLOOR TRAP/DRAIN OR OPEN DRAIN. 23. THE CONTRACTOR SHALL ENSURE THE FOLLOWINGS INSTALLATIONS :- EXISTING DUCT TO BE DELETED
3. ALL INSULATED AND UN-INSULATED REFRIGERANT PIPES SHALL BE RUN IN TRUNKING/TRAY. a) ALL FRESH AIR INTAKE SHALL BE LOCATED AT LEAST 5 M AWAY FROM ANY SUPPLY AIR GRILLE L/L LOW LEVEL
HOWEVER, PIPEWORK EXPOSE TO VIEW OR SHALL BE RUN IN SUITABLE SIZE TRUNKING. EXHAUST POINT.
NEW LINEAR SUPPLY AIR DIFFUSER SA SUPPLY AIR
4. PIPE WORKS PENETRATING THE ROOF TERRACE SHALL BE PROVIDED WITH APPROVED b) ALL FRESH AIR INTAKE SHALL BE LOCATED AT LEAST 3 M AWAY FROM NATURALLY (1200MMX2SLOT C/W VCD & PLENUM BOX)
VENTILATED STAIRCASE, SMOKE-STOP LOBBY, FIRE ACCESS PANEL AND/OR FIRE
M&E ENGINEER
METHOD OF WATER PROOFING SEAL TO AVOID WATER SEEPAGE. CEILING CASSETTE FAN COIL UNIT RA RETURN AIR
ESCAPE AREAS.
5. PIPE WORKS PENETRATING THE ROOF INDICATED IN THE DRAWINGS ARE INDICATIVE.
c) ALL EXHAUST AIR DISCHARGE SHALL BE LOCATED AT LEAST 5 M AWAY FROM FRESH DUMMY LINEAR EAL EXHAUST AIR LOUVER
CONTRACTOR TO CHECK ON THE SITE THE CONSTRAINT TO ENSURE THEY ARE VIABLE.
AIR INTAKE AND NATURALLY VENTILATED AREAS.
ALL PIPES PENETRATING THE WALL AND ROOF SHALL BE PROPERLY SEALED AGAINST DUCT FAN COIL UNIT OA OUTSIDE AIR
WATER SEEPAGE AND PROTECT FROM RODENT AND INSECT CRAWL. d) ALL KITCHEN EXHAUST SHALL NOT DISCHARGED DIRECTLY TO ANY ADJACENT PREMISES.
NEW LINEAR RETURN AIR DIFFUSER
e) FRESH AIR SHALL BE PROVIDED FOR ALL AIR-CONDITIONING UNITS IN ACCORDANCE (1200MMX2SLOT C/W VCD & PLENUM BOX) EAF EXHAUST AIR FAN
TO SS-553 (SS CP:13) AND BCD REQUIREMENTS.
FAF FRESH AIR FAN M&E CONTRACTOR
f) ALL ROOMS PROVIDED WITH AIR-CONDITIONING SYSTEM SHALL BE AIR-TIGHT AGAINST DUMMY LINEAR DUCT FAN COIL UNIT
AIR LEAKING. SAD SUPPLY AIR DUCT
ELECTRICAL 150MM WIDE RETURN AIR BAR GRILLE
24. ALL DUCT SIZES INDICATED ARE INTERNAL CLEAR SIZE DIMENSION.
1. ALL THE ELECTRICAL WIRING AND CIRCUIT BREAKER SHALL BE SIZED BASE ON THE WALL MOUNTED FAN COIL UNIT RAD RETURN AIR DUCT PEARL ROYAL Co., Ltd.
APPROVED STANDARD. 25. THE CONTRACTOR SHALL MADE-KNOWN TO THE M & E ENGINEER FOR ANY AIR VOLUME CONTROL DAMPER
Block-C, Room-802,8th Floor,Yadanar Housing,
2. ELECTRICAL POWER SUPPLY SHALL BE PROVIDED BY ELECTRICAL CONTRACTOR AND CHANGE IN DUCT SIZE DUE TO SITE CONSTRAINTS. EAD EXHAUST AIR DUCT
TERMINATED TO THE ISOLATORS NEAR THE FAN COIL UNITS. WIRING FROM THE ISOLATOR SPLITTER DAMPER
13Rd Quarter, South Okkalapa Township, Yangon.
CONDENSING UNIT ( DX SYSTEM )
SHALL BE INCLUDED IN THIS CONTRACT. FAD FRESH AIR DUCT
Ph: 09-420084410, Email: pearlroyal@contractor.net
3. ALL THE CONDUITS BELOW FALSE CEILING SHALL BE CONCEALED IN WALL. NON RETURN DAMPER
CMH AIR QUANTITY (CUBIC METER/HOUR)
CONDENSING UNIT ( DX SYSTEM )
REFRIGERANT PIPE(VRF) l/s AIR QUANTITY (LITER/SECOND)
DRAWING TITLE
D CONDENSATE DRAIN
REFRIGERANT PIPE (DX) REFNET JOINT
C/W COMPLETE WITH
CONDENSATE DRAIN PIPE
NOTES & LEGEND
CH CHILLER
DESIGNED BY HPT
CHECKED BY HL
Y LINE
ND A R Y
SITE BOU
1"
7'-52
Y LINE
SITE BOUNDAR
SITE BOUNDAR
TENDER DRAWING
3'-11"
1 REVISION
A
Y LINE
A-601
NO DATE DESCRIPTION
1 B B
DUCT RISER @ 500mm x500mm
1 NET WGT - KG
DUCT RISER @ 400mm x400mm
800mm x 400mm EAD
NET WGT - KG
93.6 1
SITE BOUNDAR
AC & FIRE
74
A-602 EAF - M&E- AXIAL
A-602
EAF -CP- AXIAL 12000CMH(FM)
600mm x 400mm EAD DUCT RISER @ 300mm x300mm
6000CMH(HM)
7000CMH(FM)
4000CMH(HM)
STAIR-1
13'-9"
LIFT
P&S
** FAN TESTED TO BS 7346 - 300'C FOR AT LEAST 1 HOUR AND
5
600mm x 300mm(FS)
LOCATION
14'-8"
2 STRUCTURE
19'-6"
LINE
1 1
A-603 A-603
SITE BOUNDAR
3
F.F.L -9'-0"
Y
S.F.L -9'-2"
2
1
M&E ENGINEER
SITE BOUNDAR
1
4
4 M&E CONTRACTOR
CAR PARKING - 6 NOS
6'-0"
DRAWING NO.
REV - II
DESIGNED BY HPT
CHECKED BY HL
Y LINE
D A RY
SITE BOUN
1"
7'-52
Y LINE
SITE BOUNDAR
SITE BOUNDAR
EXHAUST AIR LOUVER TENDER DRAWING
EXHAUST AIR LOUVER
3'-11"
1 REVISION
A
FRESH AIR LOUVER
Y LINE
NET WGT - KG
A-601
3.9
AC & FIRE
2 SLOT LSBG c/w VCD @ 4nos @1400CMH EACH
SITE BOUNDAR
1200mm x 200mm(FS)
A-602 @750CMH EACH A-602
2 SLOT LSBG c/w VCD @ 4nos
DUCT RISER @ 300mm x300mm
1
WC Director Rm
1200mm x 200mm(FS)
@750CMH EACH
FCU-HD-03
Stair Area A/P
31.75mm x 19.05mm
14.2KW
13'-9"
Vault Lift
Reception
A/P 249 SF
P&S
BY JOHNSON
BY JOHNSON
YORK
YORK
CONTROLS
CONTROLS
R
R
15.88mm x 9.52mm
F.F.L ±0'-0" @2800CMH EACH
F.F.L ±0'-0" 14.2KW
TENDER DRAWING
15.88mm x 9.52mm
22.2mm x 9.52mm
1200mm x 200mm(FS) 2 SLOT LSBG c/w VCD @ 10nos
@600CMH EACH 1200mm x 200mm(FS)
F.F.L ±0'-0" A/P @540CMH EACH F.F.L -3'-0"
S.F.L - 0'-2" FCU-HD-02 NET WGT - KG
14KG EACH
S.F.L -3'-2" LOCATION
28KW
NET WGT - KG
14'-8"
Air Curtain
81
NET WGT - KG
2NOS
2
189
YANGON
BY JOHNSON
15.88mm x 6.35mm
600mm x 300mm
47'-11"
FCU-HD-04
5.6KW
2 SLOT LRBG c/w VCD @ 2nos
1200mm x 200mm(FS)
F.F.L ±0'-0" T - 1' 0"
@500CMH EACH
A/P
BY JOHNSON
YORK
CONTROLS
PROJECT TITLE
R
S.F.L - 0'-2" F.F.L ±0'-0"
15.88mm x 9.52mm
@600CMH EACH
00m
x3
mm
ARCHITECT
3 2 SLOT LRBG c/w VCD @ 1nos
400
1200mm x 200mm(FS)
@1000CMH EACH
A/P Staff Dinning
Rm
MAIN ENTRANCE
NET WGT - KG
84
BY JOHNSON
YORK
CONTROLS
R
FCU-HD-05
LINE
7.1KW
STRUCTURE
(IN/OUT)
19'-6"
Y LINE
Y
1 1
A-603 A-603
SITE BOUNDAR
3
WC
2
1
M&E ENGINEER
SITE BOUNDAR
23 R @ 0' - 6 "
4
TEAF-CM
STAIR-2
Stair
EAF-WM
300CMH
500CMH
@100mm DIA; UP
NET WGT - KG
6.5
Area
4 Vent Hood
M&E CONTRACTOR
6'-0"
DRAWING NO.
REV - II
DESIGNED BY HPT
CHECKED BY HL
Y LINE
RY
SITE BOUNDA
1"
7'-52
Y LINE
SITE BOUNDAR
SITE BOUNDAR
TENDER DRAWING
3'-11"
1 REVISION
A
Y LINE
NET WGT - KG
A-601
3.9
EAF-WM
NET WGT - KG NO DATE DESCRIPTION
B B
600CMH 3.9
Vent Hood
1 SYSTEM - I
EAF-WM
200CMH
2 SLOT LSBG c/w VCD @ 2nos
1200mm x 200mm(FS)
1 1
S.F.L+12'-10"
AC & FIRE
ASSUME THAT KITCHEN HOOD SYSTEM IS
STAIR-1
SYSTEM - II @1000CMH EACH
SITE BOUNDAR
F.F.L+13'-0"
A-602 UNDER THE SCOPE OF KITCHEN SPECIALIST. A-602
Bath & WC
100mmDIA
+13'-0"
Bath & WC
Master Bed
31.75mm x 19.05mm
13'-9"
300mm x 300mm
Stair Area
NET WGT - KG
9.4
Lift
NET WGT - KG
Rm Balcony
EAF-WM
6.5
3000CMH
P&S
TEAF-CM
F.F.L+12'-10"
S.F.L+12'-8"
2 SLOT LRBG c/w VCD @ 1nos
1200mm x 600mm(FS)
F.F.L +12'-8"
Hall
Kitchen CYCLE-CM
S.F.L - 12'-6"
YORK
F.F.L +13'-0"
BY JOHNSON CONTROLS
R
56in BLADE
98 TENDER DRAWING
Store Rm
NET WGT - KG 300CMH @100mm DIA;
7.2
FCU-HD-02
28.58mm x 15.88mm
2 SLOT LRBG c/w VCD @ 2nos
1200mm x 600mm(FS)
@2500CMH EACH
NET WGT - KG
6.5
OWNER / DEVELOPER
2 22.2mm x 9.52mm
F.F.L±12'-8"
S.F.L-12'-6"
19.05mm x 9.52mm
2 SLOT LSBG c/w VCD @ 10nos
1200mm x 200mm(FS)
A/P 19.05mm x 9.52mm 19.05mm x 9.52mm
15.88mm x 9.52mm
F.F.L +13'-0"
15.88mm x 9.52mm
A/P
Wide Passageway @500CMH EACH
YARD
FCU-HD-04
NET WGT - KG
NET WGT - KG
LOCATION
22.4KW
104
S.F.L +12'-10" 81
14'-8"
300mm x 200mm
R
YORK
BY JOHNSON CONTROLS
Family Rm YANGON
BY JOHNSON
@100mm DIA;
F.F.L +13'-0"
YORK
CONTROLS
47'-11"
R
FCU-HD-03
Bath & WC 30
0m
m
S.F.L +12'-10"
PROJECT TITLE
A/P SA
D
15.88mm x 9.52mm
@100mm DIA;
500CMH
400mm x 300mm
NET WGT - KG
6.5
YORK
CONTROLS
BY JOHNSON
20 R @ 0' - 6 7/8"
F.F.L +13'-0" 400mm x 300mm 300mm x 300mm 2 SLOT LSBG c/w VCD @ 2nos
NET WGT - KG
A/P Study Rm
400mm x 300mm SAD
STRUCTURE
19'-6"
FCU-HD-01
Y LINE
1
Living Area 2 SLOT LRBG c/w VCD @ 1nos
1200mm x 600mm(FS)
1
@1000CMH EACH
A-603 A-603
SITE BOUNDAR
2
1
M&E ENGINEER
SITE BOUNDAR
2 SLOT LSBG c/w VCD @ 5nos
1200mm x 200mm(FS)
Balcony
4
@1000CMH EACH
SEC
B 4-002
PEARL ROYAL Co., Ltd.
Block-C, Room-802,8th Floor,Yadanar Housing,
13Rd Quarter, South Okkalapa Township, Yangon.
SITE BOUNDARY LINE SITE BOUNDARY LINE Ph: 09-420084410, Email: pearlroyal@contractor.net
DRAWING NO.
REV - II
DESIGNED BY HPT
CHECKED BY HL
Y LINE
D AR Y
SITE BOUN
1"
7'-52
Y LINE
SITE BOUNDAR
SITE BOUNDAR
TENDER DRAWING
3'-11"
1 REVISION
A
Y LINE
NET WGT - KG
A-601
3.9
EAF-WM
NO DATE DESCRIPTION
B A
600CMH
1 SYSTEM - I
1 ASSUME THAT KITCHEN HOOD SYSTEM IS SEC
STAIR-1
AC & FIRE
SYSTEM - II
SITE BOUNDAR
Stair Area
NET WGT - KG
7.2
22.2mm x 9.52mm
CYCLE-CM FCU-HD-01
S.F.L +24'-0"
F.F.L +24'-2"
2 SLOT LRBG c/w VCD @ 2nos
13'-9"
31.75mm x 19.05mm
NET WGT - KG
lift
9.4 1200mm x 600mm(FS)
189 R
YORK
@2500CMH EACH
CONTROLS BY JOHNSON
EAF-WM
3000CMH
P&S
600mm x 300mm
22.2mm x 9.52mm 28.58mm x 15.88mm
20 R @ 0' - 6 7/8" 2 SLOT LSBG c/w VCD @ 6nos
1200mm x 200mm(FS)
TENDER DRAWING
19.05mm x 9.52mm
@850CMH EACH
OWNER / DEVELOPER
2
S.F.L - 24'-0"
F.F.L +24'-2"
2 SLOT LSBG c/w VCD @ 8nos 2 SLOT LRBG c/w VCD @ 2nos
A/P
22.2mm x 9.52mm
NET WGT - KG
22.4KW
Circulation
R
YORK
BY JOHNSON CONTROLS
104
22.2mm x 9.52mm
14'-8"
0m
Vent Hood
m x3
00
mm
S.F.L +24'-4"
SA
Bath & WC D
PROJECT TITLE
A/P
100mmDIA
NET WGT - KG
FCU-HD-04 189
28KW
YORK
BY JOHNSON CONTROLS
R
YAY TAR SHAY - FIVE STORIES
Stair Area
NET WGT - KG
@2500CMH EACH
Bath & WC
6.5
NET WGT - KG
FCU-HD-02 189
28KW
YORK
BY JOHNSON CONTROLS
R
A/P
NET WGT - KG
6.5
DN
R @ 0' - 6 7/8"
UP TEAF-CM
400CMH
Master Bed Rm
Y LINE
Balcony
400mm x 300mm SAD
600mm x 300mm
S.F.L - 24'-0"
F.F.L +24'-2"
STRUCTURE
19'-6"
S.F.L +24'-0"
F.F.L +24'-2"
Y LINE
1 1
A-603 Master Bed Rm A-603
SITE BOUNDAR
3
100mmDIA
400mm x 300mm
Balcony
2
1
300mm x 300mm SAD M&E ENGINEER
SITE BOUNDAR
2 SLOT LSBG c/w VCD @ 5nos 2 SLOT LSBG c/w VCD @ 5nos
20
4
@1000CMH EACH @1000CMH EACH
STAIR-2
4 Vent Hood
M&E CONTRACTOR
6'-0"
1
A A-601 PEARL ROYAL Co., Ltd.
Block-C, Room-802,8th Floor,Yadanar Housing,
13Rd Quarter, South Okkalapa Township, Yangon.
SITE BOUNDARY LINE SITE BOUNDARY LINE Ph: 09-420084410, Email: pearlroyal@contractor.net
DRAWING NO.
REV - II
DESIGNED BY HPT
CHECKED BY HL
Y LINE
U ND AR Y
SITE BO
1"
7'-52
Y LINE
SITE BOUNDAR
SITE BOUNDAR
TENDER DRAWING
3'-11"
1 REVISION
A
Y LINE
A-601
NET WGT - KG NET WGT - KG NET WGT - KG
NET WGT - KG
3.9
EAF-WM
3.9
EAF-WM 20 R @ 0' - 6 7/8" 3.9
EAF-WM EAF-WM
3.9
NO DATE DESCRIPTION
B A
1000CMH 600CMH 400CMH
200CMH
1 Vent Hood
AC & FIRE
STAIR-1
SITE BOUNDAR
FCU-HD-08
A-602 SYSTEM - III 4-001
9KW
& Yard DN SYSTEM - IV
R
YORK
CONTROLS
Sauna
BY JOHNSON
Bath & WC
22.2mm x 9.52mm
NET WGT - KG
S.F.L +35'-10"
98
13'-9"
Stair Area
F.F.L +36'-0"
2 SLOT LRBG c/w VCD @ 1nos
lift
P&S
1200mm x 600mm(FS)
Maid
A/PRm
@100mm DIA;
UP
1200mm x 200mm(FS)
@1000CMH EACH
15.88mm x 6.35mm
25.4mm x 12.7mm 125
OWNER / DEVELOPER
@1000CMH EACH
A/P
F.F.L +36'-0"
2
BY JOHNSON
YORK
CONTROLS
R
2 SLOT LRBG c/w VCD @ 1nos NET WGT - KG 2 SLOT LSBG c/w VCD @ 5nos
15.88mm x 9.52mm
81
1200mm x 600mm(FS)
ASSUME THAT KITCHEN HOOD SYSTEM IS FCU-HD-11
S.F.L +35'-10" 1200mm x 200mm(FS)
15.88mm x 9.52mm
Shoe Cabinet
6.5 R
YORKCONTROLS BY JOHNSON
EAF-CM
300CMH
S.F.L +35'-10"
F.F.L +36'-0"
Wet Kitchen LOCATION
Powder Rm
@2500CMH EACH
S.F.L +35'-10" Master Bed Rm
S.F.L +34'-10"
F.F.L +36'-0"
F.F.L +35'-0"
YANGON
15.88mm x 9.52mm
A/P
S.F.L +35'-10"
47'-11"
FCU-HD-10
2 SLOT LSBG c/w VCD @ 2nos
14.2KW
NET WGT - KG
1200mm x 200mm(FS)
125
@600CMH EACH
YORK
BY JOHNSON CONTROLS
R
PROJECT TITLE
A/P Circulation
FCU-HD-09 YAY TAR SHAY - FIVE STORIES
14.2KW NET WGT - KG
125
R
YORK
BY JOHNSON CONTROLS
400mm x 300mm SAD
UP
400mm x 300mm SAD
1200mm x 200mm(FS)
14.2KW 125
R
YORK
BY JOHNSON CONTROLS
F.F.L +36'-0"
2 SLOT LSBG c/w VCD @ 5nos
Master Bed Rm
Y LINE
1200mm x 200mm(FS)
S.F.L +35'-10"
300mm x 300mm
@600CMH EACH
S.F.L +35'-6"
2 SLOT LRBG c/w VCD @ 1nos
STRUCTURE
F.F.L +35'-8"
19'-6"
1200mm x 600mm(FS)
400mm x 300mm
@2500CMH EACH
C C
Balcony
Y LINE
1 1
A-603 A-603
SITE BOUNDAR
3
300mm x 300mm
Dinning Area Bath & WC
2
1
NET WGT - KG
SITE BOUNDAR
Stair Area
4
EAF-CM
2 SLOT LSBG c/w VCD @ 5nos
400CMH
1200mm x 200mm(FS)
@100mm DIA;
@600CMH EACH
STAIR-2
4 M&E CONTRACTOR
6'-0"
Vent Hood
1
A A-601 PEARL ROYAL Co., Ltd.
Block-C, Room-802,8th Floor,Yadanar Housing,
13Rd Quarter, South Okkalapa Township, Yangon.
SITE BOUNDARY LINE SITE BOUNDARY LINE Ph: 09-420084410, Email: pearlroyal@contractor.net
DRAWING NO.
REV - II
DESIGNED BY HPT
CHECKED BY HL
Y LINE
NDA R Y
SITE BOU
1"
7'-52
Y LINE
SITE BOUNDAR
SITE BOUNDAR
TENDER DRAWING
3'-11"
SEC REVISION
B
LINE
4-002
NET WGT - KG NET WGT - KG NET WGT - KG
3.9
EAF-WM
3.9
EAF-WM
3.9
EAF-WM
NO DATE DESCRIPTION
B A
250CMH 200CMH 200CMH
2 SLOT LRBG c/w VCD @ 2nos
1
Vent Hood
1200mm x 200mm(FS)
@2000CMH EACH
Y
Balcony
S.F.L +47'-2"
F.F.L +47'-4"
SYSTEM - I
1 Balcony SEC
AC & FIRE
SYSTEM - II
STAIR-1
SITE BOUNDAR
Bath & WC
SYSTEM - IV 2 SLOT LSBG c/w VCD @ 5nos
1200mm x 200mm(FS)
SYSTEM - V @800CMH EACH
Master Bed Rm
31.75mm x 19.05mm
Stair Area Bath & WC
13'-9"
100mmDIA
P&S
S.F.L +47'-4"
300mm x 300mm
NET WGT - KG
144
15.88mm x 9.52mm
UP
YORK
BY JOHNSON CONTROLS
Store Rm
NET WGT - KG
OWNER / DEVELOPER
Master Bed Rm
6.5
400mm x 300mm
400mm x 300mm
EAF-CM
2 SLOT LSBG c/w VCD @ 4nos
2
300CMH
1200mm x 200mm(FS)
Wardrobe
@1000CMH EACH
2 SLOT LRBG c/w VCD @ 1nos F.F.L +47'-6" @100mm DIA;
F.F.L +47'-6"
Walk-in
2 SLOT LSBG c/w VCD @ 1nos 1200mm x 600mm(FS)
@2500CMH EACH
15.88mm x 9.52mm
1200mm x 200mm(FS)
200mm x 200mm @200CMH EACH S.F.L +47'-4"
S.F.L +47'-4" 2 SLOT LRBG c/w VCD @ 2nos
1200mm x 600mm(FS)
300mm x 300mm
CONTROLS BY JOHNSON
YORK
R
@2000CMH EACH
Walk-inA/P
Wardrobe
NET WGT - KG
144 LOCATION
15.88mm x 9.52mm
15.88mm x 9.52mm
14'-8"
FCU-HD-06
16KW
YANGON
47'-11"
15.88mm x 9.52mm
A/P
NET WGT - KG FCU-HD-05
14.2KW
PROJECT TITLE
Vent Hood
125 YORK
BY JOHNSON CONTROLS
R
@100mm DIA;
A/P
R
NET WGT - KG YORK
Bath & WC
CONTROLS BY JOHNSON
ARCHITECT
3
6.5
FCU-HD-04
14.2KW 2 SLOT LRBG c/w VCD @ 1nos
22 R @ 0' - 6 1/4" 2 SLOT LRBG c/w VCD @ 2nos
1200mm x 600mm(FS)
NET WGT - KG
F.F.L +47'-6"
UP
R
YORK
1200mm x 600mm(FS)
BY JOHNSON CONTROLS
125
@12000CMH EACH
@2400CMH EACH
DN
400mm x 300mm
S.F.L +47'-4"
300mm x 300mm SAD
400mm x 300mm
Walk-in Wardrobe
Y LINE
S.F.L +47'-0"
F.F.L +47'-2"
F.F.L +47'-6"
19'-6"
300mm x 300mm
C S.F.L +47'-4"
2 SLOT LSBG c/w VCD @ 5nos A
Balcony
F.F.L +47'-6" 300mm x 300mm SAD Stair
2 SLOT LSBG c/w VCD @ 4nos
LINE
1200mm x 200mm(FS) 1200mm x 200mm(FS)
@700CMH EACH @800CMH EACH
3
NET WGT - KG
6.5
Bath & WC
Y
EAF-CM
2
1
400CMH
M&E ENGINEER
SITE BOUNDAR
4
2 SLOT LSBG c/w VCD @ 6nos
1200mm x 200mm(FS)
@100mm DIA;
@500CMH EACH
STAIR-2
4 M&E CONTRACTOR
6'-0"
Vent Hood
SEC
B 4-002 PEARL ROYAL Co., Ltd.
Block-C, Room-802,8th Floor,Yadanar Housing,
13Rd Quarter, South Okkalapa Township, Yangon.
SITE BOUNDARY LINE SITE BOUNDARY LINE Ph: 09-420084410, Email: pearlroyal@contractor.net
DRAWING NO.
REV - II
DESIGNED BY HPT
CHECKED BY HL
Y LINE
RY
SITE BOUNDA
1"
7'-52
Y LINE
SITE BOUNDAR
SITE BOUNDAR
TENDER DRAWING
3'-11"
SEC
B
LINE
4-002 REVISION
1 A A NO DATE DESCRIPTION
Y
SEC STAIR-1
SYSTEM - I SEC
SITE BOUNDAR
AC & FIRE
327+240+240 327+240 327+327
SYSTEM - III
Lift
SYSTEM - IV
Stair SYSTEM - V
machine
13'-9"
31.75mm x 19.05mm
Area
room 38.1mm x 19.05mm
31.75mm x 19.05mm
TENDER DRAWING
LOCATION
14'-8"
YANGON
47'-11"
PROJECT TITLE
STRUCTURE
A A
Y LINE
SEC SEC
4-001 4-001
SITE BOUNDAR
2
1
SITE BOUNDAR
M&E ENGINEER
4
4
6'-0"
M&E CONTRACTOR
SEC
B 4-002
PEARL ROYAL Co., Ltd.
Block-C, Room-802,8th Floor,Yadanar Housing,
SITE BOUNDARY LINE SITE BOUNDARY LINE 13Rd Quarter, South Okkalapa Township, Yangon.
Ph: 09-420084410, Email: pearlroyal@contractor.net
DRAWING NO.
REV - II
DESIGNED BY HPT
CHECKED BY HL
Cooling: 63.3kW
Cooling: 70.4kW
+72'-0" FFL
Heating: 0.0kW Cooling: 101.9kW Cooling: 67.5kW Cooling: 76.4kW
Heating: 0.0kW
Heating: 0.0kW Heating: 0.0kW Heating: 0.0kW
SYS1 [JTOH260VPEM-0AQ1]
SYS2 [JTOH280VPEM-0AQ1] SYS3 [JTOH380VPEM-0AQ1] SYS4 [JTOH260VPEM-0AQ1]
Roof Level
JTOH140VPEM-0AQ1 JTOH120VPEM-0AQ1 SYS5 [JTOH280VPEM-0AQ1]
JTOH140VPEM-0AQ1 JTOH140VPEM-0AQ1 JTOH140VPEM-0AQ1 JTOH120VPEM-0AQ1 JTOH120VPEM-0AQ1 JTOH140VPEM-0AQ1 JTOH120VPEM-0AQ1 JTOH140VPEM-0AQ1 JTOH140VPEM-0AQ1
0.5m 1m
f25.4mm f25.4mm 0.5m 0.5m 1m
0.5m 1m
f12.7mm f12.7mm f25.4mm f25.4mm f25.4mm f25.4mm f25.4mm
JM-30SNQE f12.7mm f12.7mm f12.7mm f25.4mm f25.4mm f25.4mm f25.4mm
f12.7mm f12.7mm 0.5m
f12.7mm 1m
f12.7mm 0.5m
f12.7mm 1m
f12.7mm
JM-30SNQE JM-30SNQE
0.5m
f28.58mm JM-30SNQE JM-30SNQE JM-30SNQE
f15.88mm
+62'-0" FFL
5th Floor Level
f31.75mm JE-302SNQ JE-162SNQ JE-102SNQ
f19.05mm Piping Correction Factor(Cooling): 0.933
23m
f28.58mm f22.2mm Piping Correction Factor(Heating): 0.968
f25.4mm f12.7mm f9.52mm
f12.7mm JE-162SNQ Additional Refrigerant Charge: 10.8kg
6m 6m
5m
Ind23 Ind24 Ind25 Gas pipe : Red
Ind21 Ind22
JTDH160H0NN0AQ JTDH160H0NN0AQ JTDH142H0NN0AQ JTDH160H0NN0AQ JTDH142H0NN0AQ Liquid pipe : Green
TENDER DRAWING
f15.88mm f15.88mm f15.88mm f15.88mm f15.88mm
f9.52mm f9.52mm f9.52mm f9.52mm f9.52mm REVISION
5.5m 6.5m 5.5m 8m
Cooling: 16.4kW Cooling: 16.4kW Cooling: 13.6kW Cooling: 16.4kW Cooling: 13.6kW
Heating: 0.0kW Heating: 0.0kW Heating: 0.0kW Heating: 0.0kW Heating: 0.0kW
NO DATE DESCRIPTION
7.5m
Sensible Cooling: 11.9kW Sensible Cooling: 11.9kW Sensible Cooling: 9.8kW Sensible Cooling: 11.9kW Sensible Cooling: 9.8kW
+50'-6" FFL
JE-302SNQ JE-162SNQ JE-162SNQ JE-102SNQ
Piping Correction Factor(Cooling): 0.928
4th Floor Level
f31.75mm f28.58mm f25.4mm f19.05mm Piping Correction Factor(Heating): 0.966
f19.05mm f22.2mm f12.7mm f12.7mm f9.52mm
25m f9.52mm JE-102SNQ 3m 5.5m 4.5m Additional Refrigerant Charge: 10.9kg
2m
Gas pipe : Red
Ind15 Ind16 Ind17 Ind18 Ind19 Ind20
JTDM056H0NN0AQ JTDH142H0NN0AQ JTDH090H0NN0AQ JTDH142H0NN0AQ Liquid pipe : Green
JTDH142H0NN0AQ JTDH142H0NN0AQ
+39'-0" FFL
Cooling: 26.8kW Cooling: 26.8kW Cooling: 21.5kW Cooling: 26.8kW YAY TAR SHAY - FIVE STORIES
Heating: 0.0kW Heating: 0.0kW Heating: 0.0kW Heating: 0.0kW
Sensible Cooling: 18.9kW Sensible Cooling: 18.9kW Sensible Cooling: 15.4kW Sensible Cooling: 18.9kW
ARCHITECT
+27'-6" FFL
JE-302SNQ JE-242SNQ
Piping Correction Factor(Cooling): 0.916 2nd Floor Level
f31.75mm f28.58mm
f19.05mm f19.05mm f15.88mm Piping Correction Factor(Heating): 0.960
33m f9.52mm JE-102SNQ JE-102SNQ 3.5m
4.5m Additional Refrigerant Charge: 14.6kg
f19.05mm f22.2mm
f9.52mm f9.52mm
3m 16.5m
Cooling: 6.7kW Cooling: 8.8kW Cooling: 6.7kW
Heating: 0.0kW Heating: 0.0kW Heating: 0.0kW Cooling: 21.4kW Cooling: 26.8kW M&E ENGINEER
Sensible Cooling: 4.7kW Sensible Cooling: 6.2kW Sensible Cooling: 4.7kW Heating: 0.0kW Heating: 0.0kW
Sensible Cooling: 15.3kW Sensible Cooling: 18.9kW
+16'-0" FFL
JE-302SNQ JE-102SNQ JE-102SNQ
DRAWING NO.
REV - II
CHECKED BY HL
X
281 - 442
A A 443 - 638 300 X 300
Y
639 - 867 350 X 350
868 - 1130 400 X 400
1131 - 1435 450 X 450
1436 - 1768 500 X 500
1769 - 2250 550 X 550
NOTES:
1) ALL FACE SIZE (DIFFUSER & GRILLE SIZE) TO BE 600 X 600 MM
TO SUIT CEILING PATTERN UNLESS OTHERWISE STATED
- ALL FACE VELOCITY NOT MORE THAN 2.5 M/S ( 500 FPM ).
o o
50mm
TENDER DRAWING
REVISION
NO DATE DESCRIPTION
1 1
4 7
1 1
TENDER DRAWING
4 7
35°
OWNER / DEVELOPER
EQ EQ
1200
LOCATION
YANGON
25 MM THK. FIBERGLASS ACOUSTICAL
NOTE:
DUCT LINER WITH NEOPRENE SURFACE COATING
ALL DUCTS AT PLANT ROOM AND THOSE
EXPOSED TO WEATHER SHALL BE COVERED
W/ GAGE 26 ALUMINUM SHEET CLADDING.
WASHER GAGE 24 G.I. SHEET MECHANICAL CLIPS DUCT
152.4 WIDE GALVANIZED
STEEL CORNER BEAD PLASTIC STRAP BAND
WITH WASHER ADHERED TO DUCT (TYPICAL)
PROJECT TITLE
25.4mm THICK INSULATION
W/ FIRE RESISTANT GLASS FABRIC
TAPE 1
VAPOR BARRIER
75(MINI)
45
--------- ---------
75 75
45 MINI
M&E CONTRACTOR
FLOOR SLAB
DRAWING TITLE
TYPICAL LINEAR DIFFUSER
FALSE CEILING INSTALLATION DETAIL
DETAIL 'A'
DETAIL
DRAWING NO.
DESIGNED BY HPT
CHECKED BY HL
2. THE FIRE PROTECTION CONTRACTOR SHALL CO-ORDINATE WITH OTHER SERVICES FOR RUNNING
OF PIPES / CABLES .
PLAN SCHEMATIC 3. THE ACTUAL POSITION OF ALL FIRE HYDRANTS / HOSE REEL / DRY RISER /
SHALL BE BASED ON ARCHITECT'S APPROVED BUILDING PANS.
4. THE DRY / WET RISING MAIN SHALL BE INSTALLED PROGRESSIVELY AS THE BUILDING GAINS
HEIGHT DURING THE COURSE OF CONSTRUCTION , C/W LANDING VALVES , AIR RELEASE VALVE
AND FIRE BRIGADE INLETS AND SHALL BE MAINTAINED IN AN OPERATIONAL CONDITION.
SPRINKLER ( PENDENT TYPE ) SPRINKLER
5. ELECTRICAL WORKS SHALL BE CARRIED OUT IN ACCORDANCE WITH CP 5 .
(2) ALL DRAIN COCKS SHALL BE STRAPPED AND PADLOCKED WITH MASTER KEY LOCK IN ''CLOSED" POSITION.
CHECK VALVE (3) AUTOMATIC AIR RELEASE VALVE SHALL BE PROVIDED AT THE HIGHEST POINT OF EACH INSTALLATION . ( DRY RISER SYSTEM )
GATE VALVE
(4) ALL SYSTEM DRAINAGE SHALL BE DISCHARGED TO OPEN DRAIN .
LOCATION
MILD STEEL CABINETS SHALL BE STAINLESS STEEL.
GATE VALVE M
3. FIRE SERVICES BREECHING INLETS YANGON
4. FIRE SERVICES INLET OF 100MMDIA; 2-WAY OR 4-WAY C/W CHECK VALVES SHALL BE
MODULATING VALVE
PROVIDED TO SUPPLEMENT WATER SUPPLY TO EACH DRY RISER MAN .
INDIVIDUAL EARTHING PIT SHALL BE PROVIDED FOR EACH BREECHING INLETA . PROJECT TITLE
M THE GRAVITY FEED PIPING SYSTEM ALSO SHALL BE INDIVIDUALLY ELECTRICAL EARTHED .
MODULATING VALVE PRV LIGHTING PROTECTION SHALL BE PROVIDED WHERE RISING MAIN INSTALLED AT THE
PRESSURE RELEASE VALVE HIGHEST FLOOR / OPEN ROOF AREA .
DESIGNED BY HPT
CHECKED BY HL
DATE
TENDER DRAWING
REVISION
NO DATE DESCRIPTION
5
PENDENT WITH ESCUTHCION PLATE TYPICAL INSTALLATION OF PENDENT TYPE UPRIGHT SPRINKLER HEAD DETAIL
SPRINKLER HEAD DETAIL SPRINKLER HEAD ON AREAS W/OUT CEIL.ING TYPICAL SIDE WALL TYPE TYPICAL RECESSED PENDENT TYPE TYPICAL CUT-OFF SPRINKLER DETAIL SPRINKLER IN SPACE & BELOW CEILING
4
NOTE: 3
ACTUATOR COVER
2
MOUNTING PLATE
NUT (TYPICAL)
DIRECTION OF FLOW 1
PIPE ARROW
SADDLE
0 TENDER DRAWING
MAXIMUM ALLOWABLE
DISTANCE OF DEFLECTOR VANE
DISTANCE FROM SPRINKLER TO ABOVE BOTTOM OF
BRANCHLINE
SIDE OF OBSTRUCTION (A) OBSTRUCTION (in.) (B)
LESS
1 ft.
THAN 1 FEET (305 mm)
(305 mm) TO LESS THAN 1 ft. 6 in. (457.2 mm) 2
0
1/2 (63 mm)
OWNER / DEVELOPER
1 ft. 6 in. (457.2 mm) TO LESS THAN 2 ft. (610 mm) 3 1/2 (89 mm)
2 ft. (610 mm) TO LESS THAN 2 ft. 6 in. (762 mm) 5 1/2 (140 mm)
2 ft. 6 in. (762 mm) TO LESS THAN 3 ft. (915 mm) 7 1/2 (190 mm)
FEEDMAN
3 ft. (915 mm) TO LESS THAN 3 ft. 6 in. (1066.8 mm) 9 1/2 (241 mm) PIPE
3 ft. 6 in. (1066.8 mm) TO LESS THAN 4 ft. (1220 mm) 12 (305 mm)
4 ft. (1220 mm) TO LESS THAN 4 ft. 6 in. (1371.6 mm) 14 (355 mm)
DRAIN
TEST
4 ft. 6 in. (1371.6 mm) TO LESS THAN 5 ft. (1525 mm) 16 1/2 (419 mm)
DRAIN
TEST
5 ft. (1525 mm) TO LESS THAN 5 ft. 6 in. (1676.4 mm) 18 (457 mm)
5 ft. 6 in. (1676.4 mm) TO LESS THAN 6 ft. (1830 mm) 20 (508 mm)
6 ft.
6 ft.
(1830 mm) TO LESS THAN 6 ft. 6 in. (1981.2 mm)
6 in. (1981.2 mm) TO LESS THAN 7 ft. (2135 mm)
24 (610 mm)
30 (762 mm)
LOCATION
7 ft. (2135 mm) TO LESS THAN 7 ft. 6 in. (2286 mm) 35 (889 mm)
YANGON
BRANCH TO SPRINKLLER CONNECTION DETAIL INSTALLATION OF SPRINKLER HEAD NEAR FIXED OBSTRUCTION TYPICAL DETAIL OF 4.5 kg. (10 LBS.) PORTABLE FLOOR CONTROL VALVE ASSEMBLY FLOW SWITCH INSTALLATION DETAIL
ACCEPTABLE TYPE OF HANGERS
EXTINGUISHER MOUNTING
PROJECT TITLE
ARCHITECT
STRUCTURE
SECTIONAL ELEVATION OF HYDRANT WATER STORAGE TANK WET RISER LANDING VALV WITHIN THE SHAFT
ALARM GONG DETAIL C/W SLOPING ROOF
M&E ENGINEER
M&E CONTRACTOR
TYPICALSPRINKLER CONTROL VALVE INSTALLATION TYPICAL PIPE HANGER IN PUMP ROOM TYPICAL INSTALLATION FOR HOSEREEL, ALARM BELL & DETAIL OF 2 WAY FIRE DEPARTMENT CONNECTION DRAWING TITLE
MANUAL CALL POINT
DRAWING NO.
DESIGNED BY HPT
CHECKED BY HL
DATE
A A' B C C' D E F G N
9'-9" 78'-6" 16'-8"
4'-32" 5'-53
1
4" 5'-5" 14'-7" 6'-4" 7'-1" 5'-3" 12'-6" 18'-10" 8'-6" 11'-73
4" 5'-0"
LI N E
Y LINE
N D A R Y
SITE BOU
1"
7'-52
TENDER DRAWING
Y LINE
SITE BOUNDAR
SITE BOUNDAR
REVISION
3'-11"
1 NO DATE DESCRIPTION
A
Y LINE
A-601
1 B B
1 1
SITE BOUNDAR
AC & FIRE
A-602 A-602
STAIR-1
13'-9"
LIFT
2
5
LOCATION
YANGON
14'-8"
47'-11"
PROJECT TITLE
M&E RM
6 F.F.L -9'-0" YAY TAR SHAY - FIVE STORIES
CAR PARKING
S.F.L -9'-2"
ARCHITECT
STRUCTURE
Y LINE
2
19'-6"
LINE
1 1
A-603 A-603
SITE BOUNDAR
3
F.F.L -9'-0" M&E ENGINEER
Y
S.F.L -9'-2"
2
1
SITE BOUNDAR
1
4
M&E CONTRACTOR
4
CAR PARKING - 6 NOS
6'-0"
DRAWING NO.
REV - II
DESIGNED BY HPT
CHECKED BY HL
Y LINE
RY
SITE BOUNDA
1"
7'-52
TENDER DRAWING
Y LINE
SITE BOUNDAR
SITE BOUNDAR
REVISION
3'-11"
1 NO DATE DESCRIPTION
A
Y LINE
A-601
1 B B
1 STAIR-1 1
AC & FIRE
SITE BOUNDAR
A-602 A-602
1
WC Director Rm Stair Area
13'-9"
Vault Lift
Reception
249 SF
LOCATION
F.F.L ±0'-0" F.F.L -3'-0"
S.F.L - 0'-2" S.F.L -3'-2" YANGON
14'-8"
2
Shop Area(Gold & Diamond) R - 0' 6"
47'-11"
PROJECT TITLE
F.F.L ±0'-0" T - 1' 0"
S.F.L - 0'-2" F.F.L ±0'-0" YAY TAR SHAY - FIVE STORIES
S.F.L - 0'-2"
ARCHITECT
3 Staff Dinning
Rm
MAIN ENTRANCE
STRUCTURE
Y LINE
(IN/OUT)
19'-6"
Y LINE
1 1
A-603 A-603
SITE BOUNDAR
3
WC M&E ENGINEER
2
1
SITE BOUNDAR
23 R @ 0' - 6 "
4
STAIR-2
UP Stair
Area M&E CONTRACTOR
4
6'-0"
DRAWING NO.
REV - II
DESIGNED BY HPT
CHECKED BY HL
Y LINE
A R Y
SITE BOUND
1"
7'-52
TENDER DRAWING
RY LINE
SITE BOUNDA
SITE BOUNDAR
REVISION
3'-11"
1 NO DATE DESCRIPTION
A
Y LINE
A-601
1 B B
1 1
S.F.L+12'-10"
AC & FIRE
STAIR-1
SITE BOUNDAR
F.F.L+13'-0"
A-602 A-602
+13'-0" Bath & WC
Bath & WC
Master Bed
13'-9"
F.F.L+12'-10"
2
F.F.L±12'-8"
S.F.L-12'-6"
LOCATION
F.F.L +13'-0"
Wide Passageway
YARD
Family Rm
F.F.L +13'-0"
47'-11"
PROJECT TITLE
ARCHITECT
20 R @ 0' - 6 7/8"
F.F.L +13'-0"
STRUCTURE
Stair Area S.F.L +12'-10"
Y LINE
Study Rm
19'-6"
C Master Bed Rm C
Y LINE
1
Living Area 1
A-603 A-603
SITE BOUNDAR
3
M&E ENGINEER
2
1
SITE BOUNDAR
Balcony
4
STAIR-2 F.F.L +12'-8"
S.F.L +12'-6"
M&E CONTRACTOR
4
6'-0"
DRAWING NO.
REV - II
DESIGNED BY HPT
CHECKED BY HL
Y LINE
RY
SITE BOUNDA
1"
7'-52
TENDER DRAWING
Y LINE
SITE BOUNDAR
SITE BOUNDAR
REVISION
3'-11"
1 NO DATE DESCRIPTION
A
Y LINE
A-601
1 B A
1 SEC
STAIR-1
AC & FIRE
SITE BOUNDAR
A-602 4-001
Stair Area
S.F.L +24'-0"
F.F.L +24'-2"
13'-9"
lift
2
S.F.L - 24'-0"
F.F.L +24'-2"
LOCATION
Yard
Circulation
Wide Passageway
Living Area YANGON
14'-8"
F.F.L +24'-6"
47'-11"
Bath & WC
YAY TAR SHAY - FIVE STORIES
ARCHITECT
3
Stair Area Bath & WC
DN STRUCTURE
R @ 0' - 6 7/8"
UP Master Bed Rm
Y LINE
Balcony
S.F.L - 24'-0"
F.F.L +24'-2"
19'-6"
C C
S.F.L +24'-0"
F.F.L +24'-2"
Y LINE
1 1
A-603 Master Bed Rm A-603
SITE BOUNDAR
3
M&E ENGINEER
Balcony
2
1
SITE BOUNDAR
20
4
STAIR-2 M&E CONTRACTOR
4
6'-0"
DRAWING NO.
REV - II
DESIGNED BY HPT
CHECKED BY HL
Y LINE
N D A R Y
SITE BOU
1"
7'-52
TENDER DRAWING
Y LINE
SITE BOUNDAR
SITE BOUNDAR
REVISION
3'-11"
1 NO DATE DESCRIPTION
A
Y LINE
A-601
20 R @ 0' - 6 7/8"
1 B A
1 Bath & WC Laundary SEC
AC & FIRE
STAIR-1
SITE BOUNDAR
A-602 4-001
& Yard DN
Sauna Bath & WC
S.F.L +35'-10"
13'-9"
Stair Area
F.F.L +36'-0"
lift
Maid Rm
S.F.L +35'-6"
F.F.L +35'-8"
NET WGT - KG
19.4
OWNER / DEVELOPER
Lift Lobby Walk-in Wardrobe
Home Theater
F.F.L +36'-0"
2 S.F.L +35'-10"
Shoe Cabinet
LOCATION
S.F.L +35'-10"
F.F.L +36'-0"
Wet Kitchen
Powder Rm
F.F.L +36'-0"
F.F.L +35'-0"
S.F.L +35'-10"
47'-11"
PROJECT TITLE
ARCHITECT
F.F.L +36'-0"
3 Dry Kitchen
S.F.L +35'-10"
S.F.L +35'-10"
S.F.L +35'-6"
F.F.L +35'-8"
19'-6"
C C
Balcony
Y LINE
1 1
A-603 A-603
SITE BOUNDAR
3
M&E ENGINEER
Dinning Area Bath & WC
2
1
Living Area
SITE BOUNDAR
Stair Area
4
STAIR-2
M&E CONTRACTOR
4
6'-0"
DRAWING NO.
REV - II
DESIGNED BY HPT
CHECKED BY HL
Y LINE
D A R Y
SITE BOUN
1"
7'-52
TENDER DRAWING
Y LINE
SITE BOUNDAR
SITE BOUNDAR
REVISION
3'-11"
4-002
1 B A
Balcony
S.F.L +47'-2"
F.F.L +47'-4"
1 Balcony SEC
AC & FIRE
STAIR-1
SITE BOUNDAR
A-602 4-001
DN
Bath & WC
Stair Area Bath & WC Master Bed Rm
13'-9"
Wardrobe
F.F.L +47'-6"
F.F.L +47'-6"
Walk-in
S.F.L +47'-4" LOCATION
S.F.L +47'-4"
Walk-in Wardrobe YANGON
14'-8"
47'-11"
PROJECT TITLE
3 Bath & WC
22 R @ 0' - 6 1/4"
F.F.L +47'-6"
UP
S.F.L +47'-4" DN
STRUCTURE
Walk-in Wardrobe
Y LINE
Master Bed Rm
S.F.L +47'-0"
F.F.L +47'-2"
F.F.L +47'-6"
19'-6"
C S.F.L +47'-4" A
Balcony
F.F.L +47'-6" Stair
Y LINE
1 S.F.L +47'-4" Shrine SEC
A-603 Area Master Bed Rm 4-001
SITE BOUNDAR
3
M&E ENGINEER
Bath & WC
2
1
SITE BOUNDAR
4
STAIR-2 M&E CONTRACTOR
4
6'-0"
DRAWING NO.
REV - II
DESIGNED BY HPT
CHECKED BY HL
LINE
R Y
SITE BOUNDA
1"
7'-52
TENDER DRAWING
Y LINE
Y
SITE BOUNDAR
SITE BOUNDAR
REVISION
3'-11"
4-002
1 A A
SEC STAIR-1 SEC
SITE BOUNDAR
4-001 4-001
DN
AC & FIRE
Lift
Stair
machine
13'-9"
Area
room
HRP - 02 -STANDBY P
ELE & ELV
HRP - 01 -DUTY
20 R @ 0' - 6 7/8" TENDER DRAWING
P
RAW WATER TANK ( DOMESTIC & FIRE ) 2 NOS.OF HOSE REEL PUMP
(1 DUTY & 1 STANDBY)
FLOW RATE : 2.5 l/s
PUMP HEAD : 40 m (Est.)
OWNER / DEVELOPER
DESIGN CAPACITY ; 12.5Cu.M
TREATED WATER TANK ( DOMESTIC ) NET WGT - KG
27.5KG EACH
EFF CAP ; 10Cu.M
DESIGN CAPACITY ; 12.5Cu.M
F.F.L +58-8" Gallon ; 2200( Half-Day Storage )
EFF CAP ; 10Cu.M
12500KG
Gallon ; 2200( One Half-Day Storage )
(2.5 x 2.5 x 2) m
12500KG
LOCATION
YANGON
14'-8"
PROJECT TITLE
47'-11"
9738KG STRUCTURE
Y LINE
19'-6"
A A
Y LINE
SEC SEC
4-001 4-001
SITE BOUNDAR
3
M&E ENGINEER
2
1
SITE BOUNDAR
4
M&E CONTRACTOR
4
6'-0"
DRAWING NO.
REV - II
DESIGNED BY HPT
CHECKED BY HL
AAV
P HOSEREEL PUMP 2 P
+62'-0" FFL
5th Floor Level
OWNER / DEVELOPER
PROJECT TITLE
STRUCTURE
M&E CONTRACTOR
DV DV
FIRE FIGHTING SYSTEM
SCHEMATIC DIAGRAM
DRAWING NO.
REV - II
CHECKED BY HL