Project: 20SLM1 – L&T (APAC) RFP Due Date: 01.09.2020
Pall Water invites you to submit a priced proposal (INR) in accordance with all of the applicable drawings,
bills of material, specifications and conditions of this request. Please bid this project based on the
information provided. Proposals submitted with incomplete documentation may not be technically
evaluated. You may offer an alternate proposal provided that all deviations and exceptions are clearly
defined within a separate section of your proposal.
Note: For any technical clarifications, please contact the following individual and copy
rahul_mehetre@pall.com on all correspondence.
CONFIDENTIAL INFORMATION
All information, bid documents, etc. disclosed to or acquired by the Bidder in connection with this inquiry
shall be regarded as strictly confidential and used only for the preparation of the applicable proposal and
for no other purposes. Bidder shall not disclose any such information to any third party, except to the extent
necessary to prepare the proposal, without prior written consent. All drawings, specifications, standards,
memoranda and other documents relating to this inquiry shall remain the property of Pall Water or our
Customer (if applicable) and shall be returned immediately upon completion of the proposal, if requested.
GENERAL INFORMATION
1. The Bidder’s Proposal must include the following information:
A. As stated in this RFQ Summary and all included documentation.
B. Standard Manufacturer’s Warranty
C. Lead Time based on current capacities
D. Detailed Milestone Schedule for work to be completed
E. Documentation required as per RFQ
It is the Bidders responsibility to review all attachments that are being included as part of this
RFP. Failure to complete a thorough review of all attachments will not be deemed just cause for
errors. Bidder’s proposal shall conform in all respects to the attached specifications, drawings,
bills of material, Terms and Conditions and any other documents forming a part of this RFP. No
oral interpretations, instructions, directions or clarifications will be considered as a part of this
RFP.
2. Buyer reserves the right to accept other than the lowest proposal and to accept or reject any
proposal in whole or in part. Any expenses or costs incurred by the Bidder in the preparation of
their proposal shall be at the sole cost and expense of the Bidder.
3. Any exceptions, options or alternatives to the specifications, drawings, bills of material,
Terms & Conditions or any other bid documents included in the RFP must be clearly defined
in the Bidder’s Proposal
COMMERCIAL NOTES
2. Payment Terms: Standard Pall Water payment terms are Net 90 days.
5. Tagging: Please include (as a separate line) the cost to supply and install tag(s) for all equipment
as specified.
6. Documentation: The Bidder is required to include in their price the provision of all documents
listed in the request for proposal.
7. Change Orders: The Bidder must include the costs for labor rates per hour and material markup
as a percentage, as a separate line item on the Proposal. If requested, information to validate
these change order costs must be provided.
8. Field Support: If there are field services required and available after shipment to the jobsite, the
Bidder must include all applicable costs for Installation & Start-Up Support as a separate line item
on the Proposal. The Bidder is also required to furnish a copy of their Service Rate Schedule,
including field service rates, days included and applicable charges for expenses.
FILTERS
Option 1 Option 2
Scope of work:
• Mechanical design
• Issue of Design Calculations
• Issue of Overall General Assembly & detail fabrication drawings
• Supply of raw materials
• Fabrication (pre-fabrication, assembly, welding,)
• Inspection and testing whenever applicable
• Surface Preparation internal / external
• Assembly of all internals at shop, (excluding cartridges installation, cartridges have to be installed
on site)
Technical description of the housings
1. Weekly Updates: status report updates are required until all requirements of the Purchase Order
have been satisfied. The successful Bidder must submit a Milestone/Deliverables/Production
Schedule within 1 week after issuance of the Purchase Order. This schedule is to include all
milestones related to design, document submittals, procurement, fabrication, painting, inspection,
and testing. When requested digital photos will be required, showing progress.
2. Technical Compliance: The Bidder’s proposal must include a statement indicating that the
proposed equipment strictly complies with all technical specifications
Should a Pall Water QA Representative arrive at your facility for a “Scheduled” Inspection and the
Fabricated Equipment or Component or documentation is not completed and available for a
complete inspection. The Supplier will be back charged for all time, materials and expenses
incurred as a result of this.
4. Packaging/Shipment:
Vessels are to be packaged to prevent damage during shipment and when required comply with
the project shipping and packaging specifications.
Supplier is responsible for loading or unloading, (whichever applies) of Pall Water equipment,
On or from Pall Water supplied trailers, this must not exceed 2 hours
Vessels are to be photographed as loaded onto the truck to clearly show equipment packaging
(such as crating, pallets, tarping, boxes, shrink-wrapping) and placement within truck. Copies of
the photos shall be emailed to rahul_mehetre@pall.com
A detailed Packing List must be included with all shipments and include the project number,
purchase order number, item tag(s), and item description(s). Upon shipment, a copy of the
detailed Packing List and tracking information are to be emailed to rahul_mehetre@pall.com
Important:
Drop Shipments must have the shipping documents with tracking number and/or Bill of Lading,
packing list sent to the buyer via email, at time of shipment. Suppliers not following this & these
packaging & shipping instructions, WILL be back charged for all transportation and accessorial
costs as a result of non-compliance
Please confirm via email your intentions on submitting a proposal for this requirement by:
01/09/2020.
Thanks in advance,
Rahul Mehetre
Sr. Buyer-APAC