Product Costing Cockpit - Material Costing Run

Version 1.60.1 (Updated 10/01/2010)

Transaction Code: CK40N

1) Enter Costing Run id (e.g. AIO_00x)

2) Enter Costing Run Date (today's date)

3) Click on (Create) button

6) Click (Save)

1) Enter description

2) Enter Costing Variant (YPC1)

3) Enter Costing Version (01)

4) Enter Controlling Area (e.g. B


5) Enter Company Code (e.g. BP
2) Enter Costing Variant (YPC1)

3) Enter Costing Version (01)


4) Enter Controlling Area (e.g. B
5) Enter Company Code (e.g. BP

4) Click on (Save)

3) Click on (Enter)

1) Click on (Dates) tab

2) Change (Costing Date From), (Qty


Structure Date), and (Valuation Date)
(today's date).

1) Click (Change Parameter) on (S


step
4) Click (Back)

3) Click (Save)

1) Exclude Material Type (PRO

2) Note: Only select (Select C


Matls Only) when you are goi
material variants -- for step 8

1) Click (Execute) on (Selection)


1) Select (Start Immediately)

2) Click (Check)
3) Click (Confirm)

1) Click (Enter)

1) Click (Refresh)
until (Still Open) is 0 or blank
1) Click (Refresh)
until (Still Open) is 0 or blank

2) Analize the results, only proceed


next steps if there is no errors
(warning is ok).

1) Click (Change Parameter) on (Struc


Explosion) step

2) Click (Back)

1) Click (Save)
1) Click (Execute)
on (Struct. Explosion) step

1) Select (Start Immediately)

2) Click (Check)

3) Click (Confirm)

1) Click (Enter)
1) Click (Enter)

1) Click (Refresh)
until (Still Open) is 0 or blank

2) Analize the results, only proceed


next steps if there is no errors
(warning is ok).
1) Click (Change Parameter)
on (Costing) step

2) Click (Back)

1) Click (Save)
1) Click (Execute)
on (Costing) step

1) Select (Start Immediately)

2) Click (Check)

3) Click (Confirm)

1) Click (Enter)
1) Click (Refresh)
until (Still Open) is 0 or blank

2) Analize the results, only proceed to


next steps if there is no errors
(warning is ok).

1) Click (Change Parameter)


on (Analysis) step
1) Choose (SAP&12)

2) Click (Enter)

2) Click (Back)

1) Click (Save)
1) Click (Execute) on (Analysis) step.

2) Click (Back)

1) Analyze the cost e


1) Click on (Not yet allowed)
on (Marking) step.

1) Click on company code to allow


(e.g. BP01)

1) Click (Save)

2) Click (Back)
2) Click (Back)

1) Click (Save)

1) Click (Change Parameter)


on (Marking) step

3) Click (Back)

2) Click (Save)

1) Untick (Test Run)


1) Click (Execute)
on (Marking) step

1) Select (Start Immediately)

2) Untick (Change print param.)

3) Click (Check)

4) Click (Confirm)

1) Click (Enter)
1) Click (Refresh)
until (Still Open) is 0 or blank

2) Analize the results, only proceed


next steps if there is no errors
(warning is ok).
1) Click (Change Parameter)
on (Release) step

3) Click (Back)

2) Click (Save)

1) Untick (Test Run)

1) Click (Execute)
on (Release) step
1) Select (Start Immediately)

2) Untick (Change print param.)

3) Click (Check)

4) Click (Confirm)

1) Click (Enter)

1) Click (Refresh)
until (Still Open) is 0 or blank
1) Click (Refresh)
until (Still Open) is 0 or blank

2) Analize the results, only proce


next steps if there is no errors
(warning is ok).

Back to client create


id (e.g. AIO_00x)

Date (today's date)

button

ick (Save)

nter description

nter Costing Variant (YPC1)

nter Costing Version (01)

nter Controlling Area (e.g. BP01)


nter Company Code (e.g. BP01)
nter Costing Variant (YPC1)

nter Costing Version (01)


nter Controlling Area (e.g. BP01)
nter Company Code (e.g. BP01)

n (Save)

(Enter)

(Dates) tab

(Costing Date From), (Qty


Date), and (Valuation Date) to
ate).

ck (Change Parameter) on (Selection)


Click (Back)

Click (Save)

Exclude Material Type (PROD)

) Note: Only select (Select Configured


Matls Only) when you are going to cost VC
material variants -- for step 8703

lick (Execute) on (Selection) step


lect (Start Immediately)

ick (Check)
ick (Confirm)

Refresh)
l Open) is 0 or blank
Refresh)
l Open) is 0 or blank

ize the results, only proceed to the


eps if there is no errors
ng is ok).

hange Parameter) on (Struct.


) step
ecute)
Explosion) step

ect (Start Immediately)

ck (Check)

ck (Confirm)
(Refresh)
till Open) is 0 or blank

ize the results, only proceed to the


eps if there is no errors
ng is ok).
Change Parameter)
ting) step
Execute)
ting) step

ect (Start Immediately)

ck (Check)

ck (Confirm)
Refresh)
Open) is 0 or blank

e the results, only proceed to the


s if there is no errors
is ok).

Change Parameter)
ysis) step
ute) on (Analysis) step.

2) Click (Back)

1) Analyze the cost estimate results


(Not yet allowed)
g) step.

on company code to allow marking


P01)

(Back)
(Back)

(Save)

k (Change Parameter)
arking) step
ute)
step

lect (Start Immediately)

ntick (Change print param.)

ck (Check)

ck (Confirm)
Refresh)
ll Open) is 0 or blank

ze the results, only proceed to the


ps if there is no errors
g is ok).
Parameter)
p

ecute)
e) step
lect (Start Immediately)

ntick (Change print param.)

ick (Check)

ick (Confirm)

k (Refresh)
Still Open) is 0 or blank
k (Refresh)
Still Open) is 0 or blank

nalize the results, only proceed to the


steps if there is no errors
ning is ok).

Вам также может понравиться