I GENERAL REQUIREMENTS
Mobilization/Demolition lot
Temporary Facilities & Utilities lot
Site Survey & Staking-out lot
Materials Testing & Sampling lot
As-built Plans/Shop Drawings lot
SUB-TOTAL
II Warehouse
A Civil/Structural Works
a Column Footing
Excavation cu. m. 85.00
Backfill/Disposal cu. m. 85.00
Soil Poisoning sq. m. 45.00
Gravel Bedding cu. m. 10.00
Concrete cu. m. 15.00
Rebars, Grade 33 kg 545.00
Tie Wire kg 11.00
b Column
Concrete cu. m. 17.00
Rebars, Grade 40 kg 650.00
Rebars, Grade 33 kg 1,200.00
Tie Wire kg 40.00
Formworks sq. m. 160.00
c Tie Beam
Excavation cu. m. 55.00
Backfill/Disposal cu. m. 55.00
Soil Poisoning sq. m. 55.00
Concrete cu. m. 20.00
Rebars, Grade 33 kg 1,700.00
Rebars, Grade 40 kg 720.00
Tie Wire kg 50.00
Formworks sq. m. 140.00
d Slab on Fill
Soil Poisoning sq. m. 1,000.00
Gravel Bedding cu. m. 150.00
Concrete cu. m. 150.00
Rebars, Grade 40 kg 11,600.00
Tie Wire kg 250.00
Formworks sq. m. 30.00
f Steel Works
Column kg 5,000.00
Truss kg 17,000.00
Purlins kg 5,000.00
Sag Rod w/ Nuts and Washers kg 260.00
Cross Bracing kg 140.00
Turn Buckle pcs 16.00
Welding Rod kg 2,500.00
SUB-TOTAL
d Painting Works
Exterior
Semi-gloss Paint Finish, Exterior Wall sq. m. 420.00
Semi-gloss Paint Finish, Column sq. m. 30.00
Interior
Semi-Gloss Paint Finish, Interior Wall sq. m. 420.00
SUB-TOTAL
III CR
a Column Footing
Excavation cu. m. 0.70
Backfill/Disposal cu. m. 0.70
Soil Poisoning sq. m. 0.70
Gravel Bedding cu. m. 0.15
Concrete cu. m. 0.25
Rebars, Grade 33 kg 18.00
Tie Wire kg 0.40
b Column
Concrete cu. m. 0.85
Rebars, Grade 40 kg 58.00
Rebars, Grade 33 kg 80.00
Tie Wire kg 3.00
Formworks sq. m. 12.00
c Tie Beam
Excavation cu. m. 0.70
Backfill/Disposal cu. m. 0.70
Soil Poisoning sq. m. 2.00
Concrete cu. m. 0.70
Rebars, Grade 33 kg 58.00
Rebars, Grade 40 kg 28.00
Tie Wire kg 1.80
Formworks sq. m. 10.00
c Beam
Concrete cu. m. 0.70
Rebars, Grade 33 kg 58.00
Rebars, Grade 40 kg 28.00
Tie Wire kg 1.80
Formworks sq. m. 10.00
d Slab on Fill
Soil Poisoning sq. m. 6.00
Gravel Bedding cu. m. 0.60
Concrete cu. m. 0.60
Rebars, Grade 40 kg 50.00
Tie Wire kg 1.00
Formworks sq. m. 1.50
f Steel Works
Purlins kg 60.00
Sag Rod w/ Nuts and Washers kg 9.50
Cross Bracing kg 7.50
Turn Buckle pcs 2.00
Welding Rod kg 40.00
e Doors
PVC Door 2.10 H x .70 W, Pretty Door Brand pcs 2.00
SUB-TOTAL
IV ARCHITECTURAL WORKS
a Roofing
Corrugated GI Sheets Rib-type (Colored) sq. m. 9.00
d Painting Works
Exterior
Semi-gloss Paint Finish, Exterior Wall sq. m. 26.00
Interior
Semi-Gloss Paint Finish, Interior Wall sq. m. 47.00
SUB-TOTAL
V OFFICE
a Fiber Cement Board (Hardiflex) sq. m. 75.00
Metal Studs (.50mm x 35mm x 76mm x 3.0m) pcs
VI Architectural Works
a Ceiling Works
Acoustic Board sq. m. 20.00
T-runners pcs
Wall Angle pcs
Hangers pcs
b Painting Works
Exterior Wall
Semi-gloss Paint Finish, Exterior Wall sq. m. 40.00
Interior Wall
Semi-Gloss Paint Finish, Interior Wall sq. m. 40.00
SUB-TOTAL
d Plumbing Fixtures
Water Closet , white with complete fittings set 2.00
Lavatory, wall hung wash basin with single set 2.00
lever basin Faucet
Faucet, quarter turn, single lever pillar tap pc 3.00
e Septic Tank
Excavation cu. m. 5.00
Backfill/Disposal cu. m. 2.00
Soil Poisoning sq. m. 3.20
Gravel Bedding cu. m. 0.35
Concrete cu. m. 0.70
Rebars, Grade 40 kg 65.00
Tie Wire kg 1.50
CHB, 100mm THK sq. m. 15.00
SUB-TOTAL
SUB-TOTAL
TOTAL
Unit Cost
TOTAL AMOUNT
Materials Labor Total
100,000.00 100,000.00
100,000.00 100,000.00
52,000.00 52,000.00
50,000.00 50,000.00
50,000.00 50,000.00
352,000.00
4,451,300.00
2,872,100.00
200.00 200.00 140.00
150.00 150.00 105.00
75.00 50.00 125.00 87.50
850.00 80.00 930.00 139.50
4,000.00 500.00 4,500.00 1,125.00
45.00 10.00 55.00 990.00
70.00 5.00 75.00 30.00
86,345.50
44,870.00
28,000.00
625.00 187.50 812.50 8,125.00
220.00 66.00 286.00 1,716.00
80.00 24.00 104.00 416.00
60.00 18.00 78.00 312.00
30.00 9.00 39.00 312.00
25.00 7.50 32.50 195.00
125.00 37.50 162.50 650.00
105.00 31.50 136.50 273.00
195.00 58.50 253.50 507.00
140.00 42.00 182.00 546.00
40.00 12.00 52.00 156.00
60.00 18.00 78.00 156.00
390.00 117.00 507.00 507.00
145.00 43.50 188.50 565.50
215,544.50
726,036.95
11,145,770.13
PROJECT : PROPOSED WAREHOUSE
LOCATION :
Unit Cost
ITEM NO ITEM DESCRIPTION UNIT QTY
Materials
I GENERAL REQUIREMENTS
Mobilization/Demolition lot
Temporary Facilities & Utilities lot
Site Survey & Staking-out lot
Materials Testing & Sampling lot
As-built Plans/Shop Drawings lot
SUB-TOTAL
II Warehouse
A Civil/Structural Works
a Column Footing
Excavation cu. m. 85.00
Backfill/Disposal cu. m. 85.00
Soil Poisoning sq. m. 45.00 75.00
Gravel Bedding cu. m. 10.00 850.00
Concrete cu. m. 15.00 4,000.00
Rebars, Grade 33 kg 545.00 45.00
Tie Wire kg 11.00 70.00
b Column
Concrete cu. m. 17.00 4,000.00
Rebars, Grade 40 kg 650.00 47.00
Rebars, Grade 33 kg 1,200.00 45.00
Tie Wire kg 40.00 70.00
Formworks sq. m. 160.00 175.00
c Tie Beam
Excavation cu. m. 55.00
Backfill/Disposal cu. m. 55.00
Soil Poisoning sq. m. 55.00 75.00
Concrete cu. m. 20.00 4,000.00
Rebars, Grade 33 kg 1,700.00 45.00
Rebars, Grade 40 kg 720.00 47.00
Tie Wire kg 50.00 70.00
Formworks sq. m. 140.00 300.00
d Slab on Fill
Soil Poisoning sq. m. 1,000.00 75.00
Gravel Bedding cu. m. 150.00 850.00
Concrete cu. m. 150.00 4,000.00
Rebars, Grade 40 kg 11,600.00 45.00
Tie Wire kg 250.00 70.00
Formworks sq. m. 30.00 175.00
f Steel Works
Column kg 5,000.00 40.00
Truss kg 16,400.00 40.00
Purlins kg 5,000.00 30.00
Sag Rod w/ Nuts and Washers kg
Cross Bracing w/ Turn Buckle kg
Welding Rod kg 2,000.00 55.00
SUB-TOTAL
Painting Works
Exterior
Semi-gloss Paint Finish, Exterior Wall sq. m. 380.00 200.00
Semi-gloss Paint Finish, Column sq. m. 30.00 200.00
Interior
Semi-Gloss Paint Finish, Interior Wall sq. m. 420.00 300.00
SUB-TOTAL
III CR
a Column Footing
Excavation cu. m. 0.70
Backfill/Disposal cu. m. 0.70
Soil Poisoning sq. m. 0.70 75.00
Gravel Bedding cu. m. 0.15 850.00
Concrete cu. m. 0.25 4,000.00
Rebars, Grade 33 kg 18.00 45.00
Tie Wire kg 0.40 70.00
b Column
Concrete cu. m. 0.85 4,000.00
Rebars, Grade 40 kg 58.00 47.00
Rebars, Grade 33 kg 80.00 45.00
Tie Wire kg 3.00 70.00
Formworks sq. m. 12.00 175.00
c Tie Beam
Excavation cu. m. 0.70
Backfill/Disposal cu. m. 0.70
Soil Poisoning sq. m. 2.00 75.00
Concrete cu. m. 0.70 4,000.00
Rebars, Grade 33 kg 58.00 45.00
Rebars, Grade 40 kg 28.00 47.00
Tie Wire kg 1.80 70.00
Formworks sq. m. 10.00 300.00
c Beam
Concrete cu. m. 0.70 4,000.00
Rebars, Grade 33 kg 58.00 45.00
Rebars, Grade 40 kg 28.00 47.00
Tie Wire kg 1.80 70.00
Formworks sq. m. 10.00 300.00
d Slab on Fill
Soil Poisoning sq. m. 6.00 75.00
Gravel Bedding cu. m. 0.60 850.00
Concrete cu. m. 0.60 4,000.00
Rebars, Grade 40 kg 50.00 47.00
Tie Wire kg 1.00 70.00
Formworks sq. m. 1.50 175.00
f Steel Works
Purlins kg 60.00 30.00
Sag Rod w/ Nuts and Washers kg
Cross Bracing kg
Turn Buckle pcs
Welding Rod kg 1.00 55.00
SUB-TOTAL
IV ARCHITECTURAL WORKS
Roofing
Corrugated GI Sheets Rib-type (Colored) sq. m. 9.00 300.00
Painting Works
Exterior
Semi-gloss Paint Finish, Exterior Wall sq. m. 26.00 200.00
Interior
Semi-Gloss Paint Finish, Interior Wall sq. m. 47.00 300.00
SUB-TOTAL
V ELECTRICAL WORKS
Service Entrance
32mm dia Entrance Cap pc 1.00 120.00
Secandary Rack w/ 3 Spool Insulators set 1.00 520.00
32mm dia. RSC Pipe ls 10.00 380.00
32mm dia. RSC Coupling pcs 20.00 25.00
32mm dia. RSC Locknut and Bushing sets 2.00 18.00
32mm dia. RSC Elbow pcs 6.00 98.00
22mm sq. THW Copper Wire mtrs 50.00 122.00
SUB-TOTAL
Unit Cost
TOTAL AMOUNT
Labor Total
100,000.00 100,000.00
100,000.00 100,000.00
52,000.00 52,000.00
50,000.00 50,000.00
50,000.00 50,000.00
352,000.00
4,337,600.00
2,247,600.00
78,610.50
44,870.00
686,333.70 546477
7,747,014.20
0.045436860048611
Concrete Works
volume (cu.m.) Unit Cost Total
Slab 200
Cement 1900 260 494000
Gravel 100 700 70000
Sand 200 1200 240000
Wall 59
Cement 531 260 138060
Gravel 29.5 700 20650
Sand 59 1200 70800
Column 16
Cement 152 260 39520
Gravel 8 700 5600
Sand 16 1200 19200
Footing 19.2
Cement 182.4 260 47424
Gravel 9.6 700 6720
Sand 19.2 1200 23040