Академический Документы
Профессиональный Документы
Культура Документы
Pile cap
H 1m
D 1.5 m bx (x by)
ex
bx (x by)
ex
d1 2
d1
lb/2
0.05 m
2
lb
CB1 CB2
H (x B)
H (x B)
h1
d2
h2
0.15 m 1 TB1 1 TB2
d2
d2
Column C D C C D C
bx 0.5 m
REd,1 REd,1 REd,2 REd,2
by 0.5 m b x (x b y)
As
ex
lb 0.55 m
NEd 3000 kN 2
d
CB
H (x B)
ex 0.25 m
h
1 TB
d2
Circular piles C D C
Node 1 - stress check (Combined model) - CCT node Node 2 - stress check (Model 1) - CCC node
b 0.53 m b 0.5 m
a1 0.53 m a2 0.5 m
u 0.30 m a22' 0.1 m
a12 0.60 m a21 0.26 m
k2 0.85 k1 1
finc 1.1 finc 1.1
n' 0.88 n' 0.88
fcd 20.0 MPa fcd 20.0 MPa
sRd,max,1 16.5 MPa sRd,max,2 19.4 MPa
Reinforcement steel in main tie Reinforcement in secondary ties (CB and q in the combined model)
TB 1279 kN H' 0.96 m Horizontal reinforcement (in h) Vertical reinforcement (in l )
As1,req 29.43 cm2 a21 0.26 m Ash,req 10.77 cm2 Asv,req 9.18 cm2
N f As1,prov CB 1971 kN N f As1,prov N f As1,prov
[mm] [cm2] q 49.5 º [mm] [cm2] [mm] [cm2]
10 20 31.42 10 12 11.31 12 12 13.57
25 0.00 2T 615 kN 25 0.00 25 0.00
Total 31.42 2Th 468 kN Total 11.31 Total 13.57
OK 2Tv 399 kN OK OK
se
n
cos