SR.NO DATE NO. NATURE OF AMENDMENT
1 02.03.2020 00 INTRODUCTION
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
1 2 3 4 5=3*4
Sub activity / Sub assembly of facilities & equipments / Situation / Event - Plaster Breaking
3 Eye injury 4 1 4
N
Sub activity / Sub assembly of facilities & equipments / Situation / Event - Demolishing of RCC Road
1 Minor cut injury 5 1 5
N
2 Eye injury 5 1 5
N
3 Electric shock 3 2 6
A
4 Fire hazards. 3 1 3
E
5 Vibrating Hazard 3 1 3
N
Sub activity / Sub assembly of facilities & equipments / Situation / Event - Manual Excavation & Trenching
3 Underground cables 3 2 6
A
6 Flying Objects 3 1 3
N
1 Fall Pipe from slings. Breakage of lifting accessories like rope and 3 1 3
chain
E
1 Fall of objects 3 1 3
N
1 Collapse of soil/pits 4 1 4
2 Emission of noise 4 1 4
N
Sub activity / Sub assembly of facilities & equipments / Situation / Event - Plain Cement Concrete.
Prepared by
Department Representative
Note:- Refer "Amendment Control Record (ACR) to note history of changes / periodic review
OHSP 01
RF/SJ
Risk Evaluation
Risk Rating Ri - Risk rating
after valuation
Adequacy of of control
Existing controls Preventive Additional controls
control (Ro x C)
6 7=5*6 H T
The Work Area cover by safety barrigation Tape at site And Protection Screen 1 6 Only experience & skills labours allow to
applying work.
All Material Tie 1 4 Work to be Supervised By Experienced &
responsible Person
1 5
Use Safety Helmet, Handgloves, safety shoes, safety goggles. Use Tested hand tools such as breaker
1 5 Trained and approved work should be
Use Safety safety goggles. deployed for cutting steel.
ELCB board must present on the site. 2 12 Work to be Supervised By Experienced &
responsible Person
Keep EXTINGUISHER Near Working Place. 2 6 Only experience & skills labours allow to
work.
Excavation only done through permit to work 1 6 Continuous Dewatering is Required in high
Seepages area.
1 4
Use Safety Helmet, Handgloves, safety shoes, safety goggles. Use of Wheelbarrow vehicle
1 4
Use of good quality nose mask Check All PPE is used or not by labours
1 4
Use of good quality nose mask Check All PPE is used or not by labours
Access ladders must be properly erected tied and project at least 1 meter Work to be Supervised By Experienced &
above the landing platform. 1 3
responsible Person
Equipment must be in good order
Workers must be provided with safe access to the work. 1 4 before use. Original manufacturer’s pins
must be used in adjustable props.
1 3
Use Safety Helmet, Handgloves, safety shoes, safety goggles. Use cotton handglooves for breaking.
2 6
Only experience & skills labours allow to work. Use Tested hand tools.
pe Loading & Unloading of Pipe
1 4
Safe access shall be provided for unloading the sand/soil. Use stopper at the time of unloading
1 3
Use of good quality nose mask Check All PPE is used or not by labours
1 3
Observer hazards at work place and surrounding area. Use Tested hand tools.
1 5
Use Safety Helmet, Handgloves, safety shoes, safety goggles. Inspect All PPE Before Use
Reviewed by
Head of Function
Function