Defining the IT

Project
Defining the project
1 Defining the Project Scope
Project Scope is an outline of the requirements of the project. At this
stage, the project team should develop a clear picture of which things
are to be included in the project itself.
A definition of the end result and the mission of the project.
It should be specific , tangible, measureable
identifies the broad or general tasks that must be undertaken.
Purpose of the Scope
Statement
- To clearly define the deliverable
- to focus clearly on the goals
- for the clients and project owner to measure
the level of success of the projct
Project Scope Checklist
 Project Objectives
Deliverables
Milestone
Technical Requirements
Limits and Exclusions
Reviews with Customer
2 Establish your Priorities

Benefits
Project Prioritizing Process
3 Creating the Work
Breakdown Structure
Work Breakdown Structure (WBS) is a part of the project
plan that defines all the tasks needed to complete the
project. The WBS is basically a table that lists the
activities/tasks and subtasks involved.
A hierarchical outline (map) that identifies the products
and work elements involved in a project.
Defines the relationship of the final deliverable (the
project) to its sub deliverables, and in turn, their
relationships to work packages.
Best suited for design and build projects that have
tangible outcomes rather than process-oriented projects.
Scope vs. Work
Scope
the characteristics of the product of the
project.

Work
the actions that must be taken in order to
deliver a product with the characteristics.
WBS for software development
WBS for building a home
WBS for a personal computer
Developing a WBS:
Six Simple Steps
1. Meeting with stakeholders
2. Organize the first level according to how they will be managed.
3. Add branches of project management deliverables and
activities
4. Ask for addition details of the project (what are the thing to do,
to produce like reports, and to have tangible outputs)
5. Arrange to hierarchy
6. Edit and revise as needed so that deliverables are nouns
(requirements documents/manuals), activities has a verb and
nouns (write requirements) and to have an enough data for
estimation.
4 Integrate WBS to
Organization
Organizational Breakdown Structure (OBS)
Depicts how the firm is organized to discharge its
work responsibility for a project.
◦ Provides a framework to summarize organization
work unit performance.
◦ Identifies organization units responsible for work
packages.
◦ Ties the organizational units to cost control
accounts.
5 Coding the WBS for the
information system
WBS Coding System Defines:
◦ Levels and elements of the WBS
◦ Organization elements
◦ Work packages
◦ Budget and cost information

Allows reports to be consolidated at any level in the


organization structure
Sample templates for project
plan
Thank you.