Вы находитесь на странице: 1из 1

Handover Notes SRO

Pending Document for SRO

1- Air Selangor – QT 7

2- IWK – PDC 7

3- NCR

 PB/20135/NCR/02/M&E

 PB/20135/NCR/03/M&E

 PB/20135/NCR/05/ST

 PB/20135/NCR/06/ST

4- As-Built drawing.

Bangunan Depot

1- Verification for roof truss by contractor engineer.

2- External work (Road, Drainage, vehicle washing bay)

3- As-Built drawing.

Вам также может понравиться