Вы находитесь на странице: 1из 1

1500 FDN. BOLT 4 NOS. 1515 FDN. BOLT 4 NOS.

M24 X 750 (TYP.) M24 X 500 (TYP.)

400 405
(TYP) (TYP)
FDN. BOLT 4 NOS.
100mm DIA. HDPE
PIPE FOR CABLE
100mm DIA. HDPE
PIPE FOR CABLE
B M24 X 750 (TYP.)

100 100 90 90
(TYP)

(TYP)

(TYP)

(TYP)
400

405
900

900
R1 FDN. BOLT 4 NOS.
M24 X 750 (TYP.)
100mm DIA. HDPE
PIPE FOR CABLE 480

900 900

1600

1800
900
(TYP) (TYP)
A A

450
900
BASE PLAN BASE PLAN

E E C C 1100
1100
100 100 90 90

(TYP)
900
ANCHOR BOLT SETTING PLAN
1800

2000

B
900

FOUNDATION PLAN FOUNDATION PLAN FOUNDATION PLAN


900

1100
R1 450 R1
480
PL-300 ABOVE F.G.L. PL-300 ABOVE F.G.L.
R1 R1
PL-300 ABOVE F.G.L. PL-300 ABOVE F.G.L.
EGL EGL EGL EGL
300

300
500

500

500

500
EGL EGL EGL EGL

CONC. MIX M-20 GRADE CONC. MIX M-20 GRADE

2100

2100
2000

2000
CONC. MIX M-20 GRADE CONC. MIX M-20 GRADE
(TMT BARS) (TMT BARS)
C/C (BOTH WAYS) C/C (BOTH WAYS)
(TMT BARS) (TMT BARS)
(TMT BARS) (TMT BARS)
(TMT BARS) (TMT BARS)

350 C/C (BOTH WAYS) 350 C/C (BOTH WAYS)


(TMT BARS) (TMT BARS)

50 50

(TYP)

(TYP)
200

200
100 100
1:4:8 CEMENT 1:4:8 CEMENT
P.C.C. (1:4:8) P.C.C. (1:4:8) CONCRET (TYP) CONCRET (TYP)

100

100
1800 1600
2500 2515
100

100

2000 1800

SECTION E-E (E-8) SECTION C-C (E-5) SECTION A-A (F-3) SECTION B-B (F-3)

66 KV BREAKER (ABB Make) 66 KV BREAKER (Siemens Make) 66 KV BREAKER (CGL Make)

GENERAL NOTES:-

1. ALL DIMENSIONS ARE IN MILIMETER AND LEVELS ARE IN METER.


2. DO NOT SCALE THIS DRAWING ONLY WRITTEN DIMENSION SHALL BE FOLLOWED.
3. THIS DRAWING MUST BE READ IN CONJUCTION WITH ALL OTHER RELEVANT
DRAWING (i.e. ARCHITECTURAL AND ELECTRICAL/STRUCTURAL DRAWING)
4. ALL THE RCC WORK SHALL BE CARRIED OUT AS PER IS 456-2000 WITH LATEST
REVISION.
5. REINFORCEMENT BAR SHALL BE TMT BARS CONFIRMING TO IS: 1786, FE-415 FOR RCC
WORKS.
6. LAP LENGTH SHOULD BE 50 X DIA OF BAR.
7. LAP @ SUPPPRT SECTION, JOINT SECTION, MID SPAN SHALL BE AVOIDED.
8. CLEAR COVER TO ALL REINFORCEMENT SHALL BE AS UNDER.
SLAB=15MM, BEAM=25MM, COLUMN=40MM, COLUMN FOOTING =50MM.
9. THE GRADE OF CONCRET SHALL BE .-M-20EXCEPT LEAN CONCRETE.
10. REINFORCEMENT SHALL BE BENT AND FIXED IN ACCORDANCE WITH THE PROCEDURE
SPECIFIED IN IS: 2502-1963.
11. NO FOUNDATIONS SHALL BE REST ON FILLED UP SOIL.
12. BEFORE CONCRETING LOCATION OF FOUNDATION BOLT SHALL BE CHECKED AND
APPROVED BY ENGINEER IN CHARGE.
13. ALL THE WORK SHALL BE CARRIED OUT AS PER RELEVANT FIELD QUALITY PLAN
APPORVED BY GETCO.
14. IF IN THE COURSE OF EXCAVATION, IF SUB SOIL STRATA DIFFERS FROM THE
BORELOG STRATA THE SAME SHALL BE REPORTED FOR NECESSARY STEPS.
15. ALL CONCRETE SHALL BE MACHINE MIXED, VIBRATED AND CURED FOR MINIMUM 10
DAYS.
16. FONDATION BOLTS IS SHALL BE CONNECTED TO REINFORCEMENT CAGE BY MEANS OF
12 MM DIA BAR (TO PROVIDE THE EARTHING TO THE FOUNDATION).
17. PLAN & SECTION SHALL BE SELECTED AS PER CIRCUIT BREAKER RECEIVED ON SITE.
18. 10 MM DIA HDPE PIPE WITH LONG RADIUS ELBOW FOR CABLE SHALL BE PROVIDED
WHILE CASTING OF FOUNDATION. PIPE SHALL BE PROVIDED IN SUCH A WAY THAT
OUTLET OF PIPE MUST BE 100MM BELOW F.G.L.

OWNER : ------------- DRG. NO. RPSPL/66KV/FDN-3

REVISION R0 DATE 08/06/2011


PROJECT : --------------
PREPARED NJS APPROVED AGD
EPC CONTRACTORE : RAJESH POWER SERVICES PVT. LTD., SIDDHI HOUSE, OFF CG ROAD, AHMEDABAD
SIGNATURE

REV. DESCRIPTION APP. DATE DRAWING : TYPICAL FOUNDATION PLAN & SECTION FOR 66KV CIRCUT BREAKER AT 66KV SUB-STATION
SCALE NOT TO SCALE

Вам также может понравиться