Whole plant Lighting Follow up

Name of site Total no. of light No. Run

RW 4 3
East side roof north south
corner

Pre-treatment area 16 3

Wall West,South side 6 0


Meteor

Blower Room 10 6

Lifting pump area 2 0

East side 2 0

Chemical Building
MCC Room 3 3
Pump Room 8 5
West side 2 0

Sludge tank Extraction pump 2 2

Dviding Chamber 3 3

Pulsatube and Clarifier 14 14

Filter gallery roof top 8 5

Filter Desk gallery 72 10

TW mcc room 14 14

TW pump room back side sump area east/west 4 2

TW tranformer room area 6 0


16 8
TW Pumping room area
14 8
33 KV tranformer area 2 1

chlorinator 4 1
evaporator 2 2
Chlorine Building
PLC 2 2
Out Side 2 0
11 KV tranformer area 18 2
11KV substation 12 8
Generator MCC Room 16 13
LED 3 3
Engine room Tube Light 36 12
Back side 2 0
ng Follow up
No. damage Remarks

13

0
3
2

3 Halogen
62 Tube light

6
Tube light
Tube light
8
6 Halogen
1

3
0
0
2
16
4
3
0 Light not sufficient