Вы находитесь на странице: 1из 1

NOTE:

ADOPTED FROM MODIFIED STANDARD DPWH-DEPED PLAN REPUBLIC OF THE PHILIPPINES

OFFICE OF THE CITY/ MUNICIPAL


ENGINEER/ BUILDING OFFICIAL

APPROVED COLOR SCHEME


DISTRICT / CITY / MUNICIPALITY
ELEMENTS DepED MPSS COLOR SCHEME PAINT / COLOR SCHEDULE MASONRY PAINT (LATEX) PAINT FOR WOOD, METAL, etc.

1. ROOFING & ACCESSORIES (IF INTRODUCED) FOAM GREEN FOAM GREEN QUICK - DRY ENAMEL (QDE) SEMI - GLOSS
LAND USE AND ZONING

2. DOORS
PALMYRA GREEN TEMPTATION SEMI - GLOSS LATEX QUICK - DRY ENAMEL (QDE) SEMI - GLOSS

3. COLUMNS AND BEAMS BEIGE (LIGHT SHADE) YELLOW RAIN SEMI - GLOSS LATEX QUICK - DRY ENAMEL (QDE) SEMI - GLOSS

4. EXTERIOR WALL BEIGE (VERY LIGHT SHADE) CRISP ECRU SEMI - GLOSS LATEX QUICK - DRY ENAMEL (QDE) SEMI - GLOSS

5. INTERIOR WALL BEIGE (LIGHTEST SHADE) BRIGHT WONDER SEMI - GLOSS LATEX QUICK - DRY ENAMEL (QDE) SEMI - GLOSS

LINE AND GRADE


6. CEILING (SUSPENDED OR SLAB/STAIRSLAB SOFFIT) WHITE WHITE SEMI - GLOSS LATEX QUICK - DRY ENAMEL (QDE) SEMI - GLOSS

TABLE OF CONTENTS
ARCHITECTURAL

ARCHITECTURAL STRUCTURAL PLUMBING ELECTRICAL ELECTRONICS MECHANICAL

A-1 · PERSPECTIVE A-15 · TYPICAL DETAIL SECTION OF STAIR S-1 GENERAL CONSTRUCTION NOTES, P-1 GROUND FLOOR PLAN AND SECOND FLOOR E-1 GROUND FLOOR LIGHTING LAYOUT EC-1 GROUND FLOOR AND SECOND FLOOR FIRE M-1 GROUND FLOOR & SECOND FLOOR
· VICINITY MAP · TYPICAL DETAIL SECTION OF STAIR (TO DECK DESIGN CRITERIA PLAN (SEWER AND DRAINAGE LINE LAYOUT) GROUND FLOOR POWER LAYOUT DETECTION AND ALARM SYSTEM AIR-CONDITIONING AND VENTILATION LAYOUT
· SITE DEVELOPMENT PLAN ROOF) SCHEDULE OF EQUIPMENTS
S-2 GENERAL CONSTRUCTION NOTES P-2 THIRD FLOOR PLAN AND FOURTH FLOOR DECK E-2 SECOND FLOOR LIGHTING LAYOUT EC-2 THIRD FLOOR AND FOURTH FLOOR FIRE
· SUMMARY OF QUANTITIES · DETAIL SECTION OF STAIR LANDING ROOF FLOOR PLAN (SEWER AND DRAINAGE SECOND FLOOR POWER LAYOUT DETECTION AND ALARM SYSTEM
· DETAIL SECTION OF STAIR LANDING (TO DECK S-3 FOUNDATION PLAN LINE LAYOUT) M-2 THIRD FLOOR & FOURTH FLOOR
A-2 · TABLE OF CONTENTS ROOF) SECOND FLOOR FRAMING PLAN E-3 THIRD FLOOR LIGHTING LAYOUT EC-3 FIRE ALARM SYSTEM RISER DIAGRAM AIR-CONDITIONING AND VENTILATION LAYOUT
· APPROVED COLOR SCHEME · TYPICAL DETAIL SECTION OF STAIR STEPS P-3 ROOF DECK FLOOR PLAN (SEWER AND THIRD FLOOR POWER LAYOUT LEGEND
S-4 THIRD FLOOR FRAMING PLAN SCHEDULE OF EQUIPMENTS
· TYPICAL DETAIL SECTION OF STAIR STEPS (TO DRAINAGE LINE LAYOUT) E-4 FOURTH FLOOR LIGHTING LAYOUT SYMBOL
FOURTH FLOOR FRAMING PLAN
A-3 · GROUND FLOOR PLAN (SCIENCE LAB. ROOM) DECK ROOF) GROUND FLOOR PLAN (WATER & FIRE LINE FOURTH FLOOR POWER LAYOUT
EC-04 VOICE AND DATA RISER DIAGRAM M-2 GENERAL NOTES
· SECOND FLOOR PLAN (COMPUTER LAB. ROOM) · SPOT DETAIL (NON-SKID NOSING STRIP) S-5 DETAIL PLAN AND ELEVATION OF COMBINE LAYOUT)
LEGENDS STRUCTURAL
· SCHEDULE OF FINISHES, FLOOR FINISHES · SPOT DETAIL (TYPICAL HANDRAIL) FOOTING E-5 ROOF DECK LIGHTING LAYOUT EC-05 CLOSED CIRCUIT TELEVISION RISER DIAGRAM
P-4 SECOND FLOOR PLAN AND THIRD FLOOR ROOF DECK POWER LAYOUT MISCELANEOUS DETAILS
SCHEDULE OF FOOTING TIE BEAM
A-4 · THIRD FLOOR PLAN (WATER AND FIRE LINE LAYOUT) EC-06 MISCELLANOUES DETAILS 1
· FOURTH FLOOR PLAN S-6 WALL TO TIE-BEAM CONNECTION DETAILS E-6 GENERAL NOTES
P-5 FOURTH FLOOR PLAN AND ROOF DECK FLOOR
A-16 · TYPICAL DETAIL OF CORRIDOR RAILING (FRONT DETAIL OF WALL FOOTING -1 ELECTRICAL SYMBOLS WP-1 SCHEDULE OF EQUIPMENTS, ISOMETRIC
· SCHEDULE OF FINISHES, FLOOR FINISHES PLAN (WATER AND FIRE LINE LAYOUT)
DETAIL SECTION OF HAN WASHING COUNTER SCHEDULE OF LOADS DIAGRAM OF WATER PUMPING SYSTEM,
RAILING).
A-5 DETAIL LAVATORY (HAND WASH) SCHEDULE OF LIGHTING FIXTURES AND LAMPS MISCELLANEOUS DETAILS
· ROOF DECK FLOOR PLAN (SHOWING PARTIAL · TYPICAL DETAIL OF CORRIDOR RAILING ( SIDE
P-6 ISOMETRIC DIAGRAM (SEWER LINE LAYOUT) ELECTRICAL RISER DIAGRAM
PLAN OF ROOF) RAILING). DETAIL SECTION OF CONCRETE SEATING
PLUMBING NOTES
· ROOF PLAN · TYPICAL DETAIL SECTION OF STAIR. DETAIL SECTION OF CONCRETE CANOPY E-7 GROUND FLOOR POWER LAYOUT
· SCHEDULE OF FINISHES, FLOOR FINISHES · TYPICAL DETAIL SECTION OF STAIR STEPS. P-7 ISOMETRIC DIAGRAM (WATER LINE LAYOUT), (WITH HOME ECONOMICS ROOM - OPTION - 2)
FP-1 GENERAL NOTES
· DETAIL SECTION OF CONCRETE BENCH S-7 REF. DETAIL ELEVATION OF COLUMNS PLUMBING LEGEND GROUND FLOOR LIGHTING LAYOUT
LEGEND
A-6 · FRONT ELEVATION SCHEDULE OF COLUMN (EXPOSURE -B & V=270) (WITH HOME ECONOMICS ROOM - OPTION - 2)
P-8 ISOMETRIC DIAGRAM (DRAINAGE LINE LAYOUT), GROUND FLOOR FE AND FHC LAYOUT,
· SCHEDULE OF FINISHES, FLOOR FINISHES A-17 · SCHEDULE OF DOORS & WINDOWS DETAIL SECTION OF STAIR ON FILL
PLUMBING LEGEND E-8 GENERAL NOTES SECOND FLOOR FE AND FHC LAYOUT
ELECTRICAL SYMBOLS
A-7 · REAR ELEVATION A-18 · DETAIL OF CORRIDOR RAILINGS LOCATED SCHEDULE OF BEAMS AND GIRDERS FP-2 GROUND FLOOR FE AND FHC LAYOUT,
S-8 P-9 DETAIL OF CATCH BASIN SCHEDULE OF LOADS SANITARY/ PLUMBING
· LEFT SIDE ELEVATION ALONG GRID-1 & 13, GRID- A OF 2ND AND 4TH (EXPOSURE - B) SECOND FLOOR FE AND FHC LAYOUT
DETAIL OF SEPTIC VAULT SCHEDULE OF LIGHTING FIXTURES AND LAMPS
· RIGHT SIDE ELEVATION FLOOR DETAIL SECTION OF R.C. RAMP ELECTRICAL RISER DIAGRAM MISCELANEOUS DETAILS
SCHEDULE OF SLAB REINFORCEMENT
· SCHEDULE OF WALL FINISHES · DETAIL OF WINDOW GRILLE FOR W-2
P-10 DETAIL OF CISTERN TANK E-9 GROUND FLOOR LIGHTING LAYOUT
S-9 END WALL DETAIL (WITH COMPUTER LABORATORY ROOM - OPTION - 3)
A-8 · LONGITUDINAL SECTION A-19 · DETAIL OF TOILETS
ROOF FRAMING PLAN DETAIL GROUND FLOOR POWER LAYOUT
· CROSS SECTION P-11 RAINWATER COLLECTOR PLAN & DETAILS
DETAIL OF R.C. GUTTER (WITH COMPUTER LABORATORY ROOM - OPTION - 3)
· SCHEDULE OF WALL FINISHES A-20 · DETAIL OF TOILETS
DETAIL OF PLANTED COLUMN (PC-1)
E-10 GENERAL NOTES
A-9 · SCHEDULE OF CEILING FINISHES A-21 · DETAIL OF BLACKBOARD ELECTRICAL SYMBOLS
S-10 DETAIL ELEVATION OF TRUSS 1
· GROUND FLOOR REFLECTED CEILING PLAN DETAIL OF CHALK DUST BOX SCHEDULE OF LOADS
REFERENCE WELD DETAIL
· TYP. SECOND & THIRD FLOOR REFLECTED SCHEDULE OF LIGHTING FIXTURES AND LAMPS
SCHEDULE OF TRUSS MEMBERS AND WELDS
CEILING PLAN ELECTRICAL RISER DIAGRAM
(EXPOSURE - B)
SCHEDULE OF TRUSS MEMBERS AND WELDS E-11 GROUND FLOOR LIGHTING LAYOUT
A-10 · SCHEDULE OF CEILING FINISHES
(EXPOSURE - D) (WITH COMPUTER LABORATORY ROOM - OPTION - 4)
· FOURTH FLOOR REFLECTED CEILING PLAN
· DETAIL OF CEILING AIR-VENT SECOND FLOOR POWER LAYOUT ELECTRICAL
S-11 DETAIL SECTIONS, CONNECTIONS & ANCHORAGES
(WITH SCIENCE LABORATORY ROOM - OPTION - 4)
OF TRUSS MEMBERS
A-11 · DETAIL BAY SECTIONS
· DETAIL SECTION (R.C. GUTTER) E-12 GENERAL NOTES
· DETAIL SECTION OF CORRIDOR RAILING (TYP.@ S-12 DETAIL ELEVATION OF TRUSS - 2 ELECTRICAL SYMBOLS
SECOND TO FOURTH FLOOR) DETAIL CONNECTION AND SPACING OF J-BOLT SCHEDULE OF LOADS
ISOMETRIC VIEW OF CONNECTION OF ROOFING TO SCHEDULE OF LIGHTING FIXTURES AND LAMPS
A-12 · DETAIL OF MAIN ENTRANCE PURLINS ELECTRICAL RISER DIAGRAM
· TYPICAL DETAIL OF SERVICE ENTRANCE
· SPOT DETAIL SECTION OF CORRIDOR RAILING S-13 DETAIL ELEVATION OF STAIR
(AT GROUND FLOOR) DETAIL SECTION OF STAIR
· SPOT DETAIL SECTION OF STAIR STEP (MAIN/ DETAIL PLAN OF LINTEL BEAM
SERVICE ENTRANCE) DETAIL PLAN OF STAIRWAY COLUMN

A-13 · DETAIL OF RAMP S-14 FRAMING PLAN OF SATIR @ FOURTH FLOOR LEVEL
· DETAIL SECTIONS OF RAMP FRAMING PLAN OF STAIR @ ROOF DECK LEVEL MECHANICAL
· DETAIL SECTION OF RAMP RAILING STAIR DETAIL FROM 4TH FLOOR TO ROOF DECK
· TYP. DET. PLAN OF HAND WASHING COUNTER DETAIL PLAN OF LINTEL BEAM (LB-1)
· TYP. DETAIL SECTION OF HAND WASHING DETAIL PLAN OF MEDIA AGUA
COUNTER

A-14 · TYPICAL DETAIL OF STAIR


· TYPICAL DETAIL OF STAIR FROM FOURTH FLOOR
TO DECK ROOF FLOOR LEVEL

PROJECT: SHEET CONTENTS: DRAWN BY: CHECKED : (ARCHITECTURAL) REVIEWED & SUBMITTED: RECOMMENDING APPROVAL: APPROVED : CONCURRED : SET NO. SHEET NO.

· COLOR SCHEME
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF 4-STOREY 16 CLASSROOM · INDEX OF SHEETS
ILOILO FIRST DISTRICT ENGINEERING FFICE (ICT & SCIENCE LAB. SCHOOL BUILDING) A-2
AT IGBARAS NATIONAL HIGH SCHOOL MA. VICTORIA B. LABISCASE DORISA PANIZA RIVERA VICTORIO G. GEMOTO NINFA M. ENRIQUEZ JAIME J. URIARTE MIGUEL MAC D. APOSIN, Ed. D, CESO V
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICER-IN-CHARGE OFFICER-IN-CHARGE
21 70
FORT SAN PEDRO, ILOILO CITY LOCATION: IGBARAS, ILOILO ENGINEER ii ARCHITECT I I DISTRICT ENGINEER SCHOOLS DIVISION SUPERINTENDENT
CHIEF, PLANNING & DESIGN SECTION OFFICE OF THE ASSISTANT DISTRICT ENGINEER

Вам также может понравиться