Вы находитесь на странице: 1из 2

INSPECTION REPORT page 1

Project Name :- Monte South Tower B


CheckList Title :- CL-STC-007-COLUMN AND SHEARWALL(CONCRETING)
Drawing No :- -
SubCheckList :- Pour 4
Date :- 25-02-2020 11:23 AM
Remark :- Testing of approver
Latitude :- null
Longitude :- null

No Category Title Question OK/NO Comment Image


T
OK/N.A
CheckList Score :-0.00 Obtained Score :-0.00
1 CONCRETING SHUTTERING CAN BE DONE Not OK Cleaning to be done
with jet spray
throughly.

2 CONCRETING Is cement slurry of appropriate OK Image Not Found


w-c ratio applied to the cold
joint surface before pouring
concrete?
3 CONCRETING Is the concrete of specified OK Image Not Found
grade poured exactly upto the
specified height(i.e.upto
Beam/DP bottom level)? Is the
concrete compacted properly?
4 CONCRETING Is the laitance removed OK Image Not Found
properly from the column top
surface after concreting just
after intial setting of the
concrete?
5 CONCRETING Is the column cured properly OK Image Not Found
for minimum 10 days period
INSPECTION REPORT page 2
SPECIAL NOTES :-
* center line / architectural requirements for elevation treatments/concrete members size is to be checked by PMC/ARCH/client as per drawings.

* r.c.c-q to be done only if all the necessary statutory permissions are obtained from all concern authorities.

* Call for re-inspection after complying with above instruction before r.c.c-q :- YES

* r.c.c-q can be done :- NO

I confirm having noted above defects which shall be complied us as instructed before Next visit.

* Client Engineer :-X

* Contractor Engineer :-Y

* PMC Engineer :-Z

* Assessment Engineer :-
* Submitter Engineer :- Suraj Rao
* Responder Engineer :-
* Approval Engineer :-
* Head Approval :-

Note:This is System generated PDF no signature required.