of roof Slab.

The suitable provision of terrace slope would result in smooth Disposal of

rainwater.

• Water tanks:
For overhead R.C.C. water storage tanks, it should be seen that the permissible limits of
stresses relating to Resistance to cracking are not exceeded. The detailed bar bending
Schedule should be supplied by the designer. The bottom slab of Overhead water tank
should be placed one metre above the roof Slab. It will facilitate proper centering during
construction and also for locating and repairing the leakages after construction.

Water leakage