Вы находитесь на странице: 1из 7

ENGINEERING PROCUMENT CONSTRUCTION & COMMISIONING

EAST COAST RAIL LINK SECTION 4

NON COMPLIANCE OF STATUTORY REQUIREMENT DURING CONCRETING


ACTIVITY AT BRIDGE 3 CHAINAGE 217 + 003
Date & Time : 30th June 2020 (Tuesday) @ approximately 1000hours

Non Compliance : Bridge 3 Pier 5, Ch217+003


Location

Activity : Pier Concreting

Brief of non :-
Compliance

1) Fail to comply with local statutory requirements (Working Platform). No proper guardrails, mid rails,
toe boards and working platform along all open sides and ends of working platforms.

2) Fail to comply with local statutory requirements (Confine Space). No implementation of confine
space entry programme to worker.
Non Conformance Overview

No implementation of
No proper guardrails,
Improper Working platform confine space entry
mid rails, toe boards
programme to worker.
Law & Regulation

FMA (BOWEC reg 72-98) – OSHA 1994 – Section 15


(Building operation and works of
engineering construction)
(Scaffold).

ICOP (Confine Space 2010)


FMA (Safety Health and Welfare
reg 13) – Confine Space
Non Conformance Overview (Confine Space Definition)
Enclosed or partially enclosed space that is at atmospheric
pressure during occupancy
.

Not intended or designed primarily as a place of work

Could have restricted means for entry and exit

is liable at any time to

• Have an atmosphere which contain potentially harmful level of


contaminant
• Have an oxygen deficiency or excess
• Cause engulfment
Pier Schedule

8.5 Meter

8.5 Meter

2.0 Meter -------------


2.0 Meter

No of Pier Chainage S(mm) W(mm) H(mm)

P5 CH217+003. 4338 138 10500


015
Confine Space Entry Programme
But not limited to:-
HIRADC

Coordinati
Competent
on of entry
Person
operations

Space
Entry
Programme

Mean Of
Permit
Communica
system
tion

Employee
Training

Вам также может понравиться