Project: PHAN LAM 2 SOLAR POWER PLANT

Job number

Drawing number PLA2_DNI_172

Issued Date 20.05.20


Issued stage FOR FACTORY

Contract number

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S CRP2 CONTROL AND PROTECTION PANEL
B FOR FACTORY 18.05.20 20.05.20 PHAN LAM 2 SOLAR POWER PLANT + A1
Job No. Drawing No. Page A1-1
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

13-Jul-20

110kV TRANMISSION LINE GRL 200 GRD 200

LVT F87L F67

0.5 3
3P 3
GBU 200

0.5 3
TO TARIFF METER CUBICLE
BCU

ES72
DS7 M
ES71
Unauthorized duplication prohibited without written consent

3
5P20 TO F87B PROTECTION

XG2 ES72

XG2 F67,67N,50/51,50/51N,79/25
400-800-1200/1/1/1/1/1/1A

3
5P20 27/59,50BF,85 XG2 ES71
DS7

SW79 SW87
GRD200
CB
ES11
SWEC SW25 SWBP
XG3
3 XG3 BCU,25 DS1

CL0.5 XG3
PRS PLT

GBU200 TC11

F86P F86S F74_1A F74_2A

3
CL0.5 TO TARIFF METER CUBICLE
XG1 XG2 XG3

ARTECHE ARTECHE ARTECHE

XG1 F87L,21/21N,67,67N,50/51 XG1


3
5P20 50/51N,SOFT,85,68,FL/FR
GRL200

CB

ES11
M
DS1

BILL OF MATERIAL
C11
NO. DESCRIPTION FUNCTION Q.TY
CVT11
3P 3 1 ENCLOSURE INDOOR PANEL 01
2 GRL200 LINE DIFFERENTIAL PROTECTION RELAY 01
0.5 3
TO TARIFF METER CUBICLE 3 GRD200 LINE OVERCURRENT RELAY 01
0.2 3 4 GBU200 BAY CONTROL UNIT 01
TO TARIFF METER CUBICLE
5 F86 TRIP/LOCKOUT RELAY 02
6 F74 TRIP SUPERVISOR RELAY 02
7 TSB-14 TEST BLOCK 01 LOT
8 ACCESSORIES TERMINAL, MCB ... 01 LOT

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S CONTROL AND PROTECTION PRINCIPLE PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + A1
EQUIPMENT LAYOUT Job No. Drawing No. Page A1-2
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

13-Jul-20

BOTTOM VIEW
8-Ø13x20
800
INDOOR CTRL. AND PROT. PANEL (W800xH2200xD800)
Front side
SPECIFICATION

* Material : Tole 2.0 (mm)

800

598

694
* Electrostatic coating
* Painting color: RAL 7032
Back side * Protection level: IP41
695
720
Unauthorized duplication prohibited without written consent

FRONT VIEW SIDE VIEW BACK VIEW


TVI_RCP
2100

2100
2200

2200
100

100

800 800 800

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S DIMENSION PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + A1
Job No. Drawing No. Page A1-3
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

13-Jul-20
SCADA LEVEL CUBICLE LEVEL LOCAL CB'BOX

SYNCHECK ELEMENT ENABLED


CB CLOSING ORDER FROM RLDC BUS AND LINE VOLTAGES IS SYNCHORNIZED
BUS AND LINE VT's MCB ON &
≥1 SYNCHECK OK (*)

HOT BUS AND DEAD LINE OR DEAD BUS AND


HOT LINE OR DEAD BUS AND DEAD LINE
&
SYNCHECK ELEMENT DISABLED

& &
SCADA/SUBSTATION SWITCH ON SCADA BAY EMERGENCY/COMPUTER SWITCH ON COMPUTER

≥1 &
CB CLOSING ORDER FROM HMI

SCADA/SUBSTATION SWITCH ON SUBSTATION & SYNCHECK OK (*)


≥1
&
HMI LEVEL
AUTO-RECLOSING ORDER
&
Unauthorized duplication prohibited without written consent

SW79 SWITCH AT MIMIC ENABLED


RECLOSE SUPERVISION LOGIIC OK & CB CLOSING ORDER FROM LOCAL

LOCAL/REMOTE SWITCH IN CB'S BOX ON LOCAL


DS1 FULLY OPENED CB CLOSING OPERATION
DS7 FULLY OPENED
& BYPASS CONDITION (**) & FROM LOCAL BOX

≥1
LVT DS1 FULLY CLOSED DS1 FULLY OPENED ≥1
&
DS7 FULLY CLOSED
&
DS7 FULLY OPENED
&
CB_SF6 LOCKOUT
PROTECTION OPERATED
M

ES72 TRIP COIL FAILURE ≥1 ≥1


DS9

M DS7
CB_SF6 LOCKOUT
LOCAL/REMOTE SWITCH IN CB'S BOX ON REMOTE
CB CLOSING OPERATION
ES71 BYPASS CONDITION (**)
≥1 & FROM SCADA, HMI, BCU, MIMIC

E02

BCU
CT

SWITCH F25 AT MIMIC ON

SYNCHECK OK (*)
&
CB

ES11
CB CLOSING ORDER FROM MIMIC ≥1
M DS1 BAY EMERGENCY/COMPUTER SWITCH ON EMERGENCY
&
C11
&
SWITCH F25 AT MIMIC OFF
BAY SINGLE LINE

MIMIC

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S CB CLOSING LOGIC PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + A2
Job No. Drawing No. Page A2-1
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

13-Jul-20
SCADA LEVEL CUBICLE LEVEL LOCAL CB'BOX

CB OPENING ORDER FROM RLDC

SCADA/SUBSTATION SWITCH ON SCADA & BAY EMERGENCY/COMPUTER SWITCH ON COMPUTER

≥1 &
CB OPENING ORDER FROM HMI

SCADA/SUBSTATION SWITCH ON SUBSTATION &


LOCAL/REMOTE SWITCH
HMI LEVEL
IN CB'S BOX ON REMOTE

& CB OPENING OPERATION


Unauthorized duplication prohibited without written consent

≥1 FROM SCADA, HMI, BCU, MIMIC

BCU
LVT
M

CB OPENING ORDER FROM MIMIC


ES72
DS9

M DS7 BAY EMERGENCY/COMPUTER SWITCH ON EMERGENCY &


ES71 MIMIC

E02
CB_SF6 LOCKOUT

CT TRIP ORDER FROM RELAY 1 & CB TRIPPING OPERATION


FROM RELAY

≥1
TRIP ORDER FROM RELAY 2

CB
RELAY

ES11
CB OPENING OPERATION
M DS1
CB OPENING ORDER FROM LOCAL
& FROM LOCAL BOX

C11 LOCAL/REMOTE SWITCH IN CB'S BOX ON LOCAL

BAY SINGLE LINE

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S CB OPENING LOGIC PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + A2
Job No. Drawing No. Page A2-2
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

13-Jul-20
SCADA LEVEL CUBICLE LEVEL LOCAL CB'BOX

DS1 CONTROL ORDER FROM RLDC

SCADA/SUBSTATION SWITCH ON SCADA & BAY EMERGENCY/COMPUTER SWITCH ON COMPUTER

≥1 &
DS1 CONTROL ORDER FROM HMI &
SCADA/SUBSTATION SWITCH ON SUBSTATION &
HMI LEVEL
Unauthorized duplication prohibited without written consent

DS1 LOCAL/REMOTE SWITCH ON REMOTE


&
CB FULLY OPENED DS1 CONTROL OPERATION
LVT ≥1 ≥1 FROM SCADA, HMI,
ES11 EARTH SWITCH FULLY OPENED BCU, MIMIC, LOCAL BOX

ES71 EARTH SWITCH FULLY OPENED


& DS1 CONTROL ORDER FROM LOCAL

DS1 LOCAL/REMOTE SWITCH ON LOCAL


&
M

ES72 ES32 - E01 (C11 EARTH SWITCH) FULLY OPENED


DS9

M DS7

ES71 ≥1
BYPASS CONDITION (**)
E02

BCU
DS1 FULLY OPENED
CT

DS7 FULLY OPENED


&
ES11, ES71 CONTROL
≥1 OPERATION FROM LOCAL BOX
DS1 CONTROL ORDER FROM MIMIC & BYPASS CONDITION (**)
BAY EMERGENCY/COMPUTER SWITCH ON EMERGENCY
CB

ES11
M DS1
C11

BAY SINGLE LINE

MIMIC

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S DS1 CONTROL LOGIC PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + A2
ES11, ES71 CONTROL LOGIC Job No. Drawing No. Page A2-3
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

13-Jul-20
SCADA LEVEL CUBICLE LEVEL LOCAL CB'BOX

DS7 CONTROL ORDER FROM RLDC

SCADA/SUBSTATION SWITCH ON SCADA & BAY EMERGENCY/COMPUTER SWITCH ON COMPUTER

≥1 &
DS7 CONTROL ORDER FROM HMI &
SCADA/SUBSTATION SWITCH ON SUBSTATION &
HMI LEVEL
Unauthorized duplication prohibited without written consent

DS7 LOCAL/REMOTE SWITCH ON REMOTE


&
CB FULLY OPENED DS7 CONTROL OPERATION
LVT ≥1 ≥1 FROM SCADA, HMI,
ES11 EARTH SWITCH FULLY OPENED BCU, MIMIC, LOCAL BOX

ES71 EARTH SWITCH FULLY OPENED


& DS7 CONTROL ORDER FROM LOCAL

DS7 LOCAL/REMOTE SWITCH ON LOCAL


&
M

ES72 ES72 EARTH SWITCH FULLY OPENED


DS9

M DS7

ES71 ≥1
BYPASS CONDITION (**)
E02

BCU
DS7 FULLY OPENED
CT
DEAD LINE
&
VTLINE MCB'S ON
ES72 CONTROL
≥1 OPERATION FROM LOCAL BOX
DS7 CONTROL ORDER FROM MIMIC & BYPASS CONDITION (**)
BAY EMERGENCY/COMPUTER SWITCH ON EMERGENCY
CB

ES11
M DS1
C11

BAY SINGLE LINE

MIMIC

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S DS7 CONTROL LOGIC PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + A2
ES72 CONTROL LOGIC Job No. Drawing No. Page A2-4
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

13-Jul-20
SCADA LEVEL CUBICLE LEVEL LOCAL CB'BOX

DS9 CONTROL ORDER FROM RLDC

SCADA/SUBSTATION SWITCH ON SCADA & BAY EMERGENCY/COMPUTER SWITCH ON COMPUTER

≥1 &
DS9 CONTROL ORDER FROM HMI &
SCADA/SUBSTATION SWITCH ON SUBSTATION &
HMI LEVEL
Unauthorized duplication prohibited without written consent

DS9 LOCAL/REMOTE SWITCH ON REMOTE


&
DS9 CONTROL OPERATION
LVT CB FULLY OPENED ≥1 ≥1 FROM SCADA, HMI,
ES71 EARTH SWITCH FULLY OPENED BCU, MIMIC, LOCAL BOX
ES72 EARTH SWITCH FULLY OPENED & DS9 CONTROL ORDER FROM LOCAL

ES71 (E03) EARTH SWITCH FULLY OPENED DS9 LOCAL/REMOTE SWITCH ON LOCAL
&
M

ES72 ES72 (E03) EARTH SWITCH FULLY OPENED


DS9

M DS7

ES71 ≥1
BYPASS CONDITION (**)
E02

BCU
CT

DS9 CONTROL ORDER FROM MIMIC &


BAY EMERGENCY/COMPUTER SWITCH ON EMERGENCY
CB

ES11
M DS1
C11

BAY SINGLE LINE

MIMIC

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S DS9 CONTROL LOGIC PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + A2
Job No. Drawing No. Page A2-5
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

13-Jul-20

CRP2 CRP3
PANEL
POWER TRIP INTERLOCK
EQUIPMENT
SUPPLY TO REMOTE END
CB F86P F86S F87L F67 F87B

TC1 TC2 BLOCK 86P 86S 87L 21 OFF 87L Start Input Start DTT POTT OFF 87L
DC1 DC2 NAME FUNCTION
79 50BF
87L

21 ZONE 1 (Z1)

21 ZONE 2,3 (Z2,Z3)


F87L
(110 kV)
Unauthorized duplication prohibited without written consent

67/67N

50/51, 50/51N
CRP2

OFF 87L

67/67N (*)
F67
50/51, 50/51N
(110 kV)
59 LEVEL 2

F86P 86P

F86S 86S

87B & 50BF (*)


CRP3

F87B
50BF LEVEL 1
(110 kV)
50BF LEVEL 2

DTT FROM REMOTE END

POTT FROM REMOTE END


SIGNAL
OTHER

OFF 87L FROM REMOTE END

50BF LEVEL 2 FROM REMOTE END

LEGEND
(*): Interal initiate

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S TRIP MATRIX PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + A2
Job No. Drawing No. Page A2-6
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

XDC 1 WDC172 1 XDC 1 XDC 2


3 2 3 4

DC
Unauthorized duplication prohibited without written consent

MCBP
/B-2.2

MCBN
/B-2.2

3 1 12 14 3 1 12 14 3 1 12 14 3 1 12 14
FR1 FT1 FR2 FT2
10A 11 10A 11 10A 11 10A 11
4 2 4 2 4 2 4 2
/B-1.3

/B-1.5

/B-1.7

/B-1.9
XR1N

XR2N
XT1N

XT2N
XR1P

XR2P
XT1P

XT2P
B-11.1 /

B-11.1 /

B-7.1 /

B-7.3 /

B-13.1 /

B-13.1 /

B-7.6 /

B-7.8 /
XRTKP_MCB_2
/B-2.2

12 14 12 14 12 14 12 14
FR1 FT1 FR2 FT2
/B-1.3 11 /B-1.5 11 /B-1.7 11 /B-1.8 11

MCB_F_2
/B-2.2

Power supply for relay 1 Power supply for trip 1 circuit Power supply for relay 2 Power supply for trip 2 circuit

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S DC DISTRIBUTION PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-1
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20
Unauthorized duplication prohibited without written consent

MCBP
B-1.10 /

MCBN
B-1.10 /

3 1 12 14 3 1 12 14 3 1 12 14 3 1 12 14 3 1 12 14
FR3 FS FDS FMM FRTK
10A 11 10A 11 10A 11 10A 11 10A 11
4 2 4 2 4 2 4 2 4 2
/B-2.3

/B-2.4

/B-2.6

/B-2.7

/B-2.8
RTK
+/P -/N

XMMN
XMMP
XDSN
XR3N

XDSP
XR3P

XSN
XSP
B-15.1 /

B-15.1 /

B-6.6 /

B-6.8 /

B-7.2 /

B-7.7 /

B-18.3 /

B-18.3 /
XRTKP_MCB_2 XSP_MCB_1
B-1.9 / /B-3.2

12 14 12 14 12 14 12 14 12 14
FR3 FS FDS FMM FRTK
/B-2.3 11 /B-2.4 11 /B-2.5 11 /B-2.7 11 /B-2.8 11

MCB_F_2 XRTKP_FDC_OFF
B-1.9 / /B-26.2

Power supply for BCU Power supply for signal circuit Power supply for control circuit Power supply for multifunction meter Power supply for RTK annunciator

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S DC DISTRIBUTION PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-2
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

XAC 1 WAC172 1 XAC 1 2


3 2 3 4

AC1

1 3 12 14
FAC
10A 11
2 4

/B-3.3
XSP_MCB_1 XRTKP_MCB
B-2.10 / /B-5.10
XSP_MCB
Unauthorized duplication prohibited without written consent

/B-6.8

SKT
12 14 12 14
FAC FVTSP L N
/B-3.8 11 /B-9.9 11 SOCKET PE
230VAC
PE
XSP_FVTSP_ON G1
/B-22.8
XRTKP_FAC_OFF
/B-26.3

2 3 2 3 NO NO
STM C SHG %rF LS2 LS1
L L COM COM

E1 x1

x1 X1
R1 H1
x2 X2

x2

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S AC DISTRIBUTION PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-3
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

XDC 1 4

DC

WDCK172 1 2

XDC 1 4 XDC 2 5
Unauthorized duplication prohibited without written consent

3 1 12 14 3 1 12 14
FCB FDS
20A 11 20A 11
4 2 4 2
/B-4.4

/B-4.5
XDC 7 8 9 10 11
XDC 3

12 13 14 15 16
XDC 6

MK_XDSN_DS1

MK_XDSN_DS7
MK_XDSP_DS1

MK_XDSP_DS7
MK_XRTKP_F1
MK_XCBN
MK_XCBP

/B-5.2

12 14 12 14
FCB FDS
B-34.3 /

B-34.3 /

B-39.5 /

B-39.5 /

B-43.5 /

B-43.5 /
/B-4.3 11 /B-4.7 11

MK_XRTKP_F2
/B-5.2

+MK

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S DC DISTRIBUTION PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
FOR MARSHALLING KIOSK Job No. Drawing No. Page B-4
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20
XAC 1 WSACK172 1 XAC 1
2 2 2
3 3 3
4 4 4

AC1

1 3 12 14 1 3 5 7 12 14
FAC2 FAC1
10A 11 40A 11
2 4 2 4 6 8

/B-5.4

/B-5.4
NO NO 2 3
LS1 LS2 SHG %rF

COM COM L

X1 X1 x1

H1 H2 R1
X2 X2 x2
Unauthorized duplication prohibited without written consent

SKT
L N
SOCKET PE
230VAC
PE
G1
/B-34.3

/B-39.8

/B-39.6

/B-43.5

/B-39.8

/B-43.5

/B-39.6

/B-34.3
MK_XCB_A

MK_XES11_A

MK_XDS1_B

MK_XDS7_C

MK_XES11_N

MK_XDS7_N

MK_XDS1_N

MK_XCB_N
XAC 5 6 7 8 9

XAC 10 11 12 13 14

XAC 15 16 17 18 19

XAC 20 21 22 23 24

WSACKVT 2 XACN_MK_VTBOX
/B-10.10
1 XACC_MK_VTBOX
/B-10.10

MK_XRTKP_F1 XS 1 WKE_3 1 XRTK 1 XRTKP_CH1


B-4.6 / /B-26.5
XS 2 XRTKP_CB
/B-27.5
XS 3 XRTKP_DS1 XRTK 2 XRTKP_MCB
12 14 12 14 /B-28.6 /B-3.5
XS 4 XRTKP_DS7
FAC1 FAC2 /B-28.8
/B-5.6 11 /B-5.3 11

MK_XRTKP_F2 XS 5 2 XRTK 3 MCB_MK_OFF


B-4.6 / /B-26.4

+MK

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S AC DISTRIBUTION PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
FOR MARSHALLING KIOSK Job No. Drawing No. Page B-5
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

XSP XSN
B-2.4 / B-2.4 /

XS 1 XS 11
WKE_3 4 XSP_RS XSN_RS
/B-45.8 /B-31.4
XCB 1 XS 2 XS 12
XSP_MK_CB XSP_VTLBOX XSP_PRS XSN_KBP
B-22.1 / B-10.4 / /B-31.4 /B-37.4
XCB 2 XS 3 XS 13
XSP_MCB XSN_R1
/B-3.5 /B-20.1
XDS1 1 XS 4 XS 14
XSP_MK_DS1 XSP_SW87 XSN_MM
B-29.5 / /B-20.4 /B-29.2
XDS1 2 XS 5 XS 15
XSP_INI XSN_TEL
/B-22.9 /B-44.2
XDS7 1 XS 6 XS 16
XSP_MK_DS7 XSP_MAN_CL
B-29.7 / /B-22.3
XDS7 2 XS 7 XS 17
XSP_RME_21
/B-44.2
XES11 1 XS 8 XS 18
XSP_MK_ES11
B-30.3 /
XES11 2 XS 9 XS 19
Unauthorized duplication prohibited without written consent

XES71 1 XS 10 XS 20
XSP_MK_ES71
B-30.5 /
XES71 2

XES72 1
XSP_MK_ES72
B-30.7 /
XES72 2

3 XDSN_MK
/B-7.7
XDS1 3
XDSN_MK_DS1
B-39.4 /
XDS1 4

XDS7 3
XDSN_MK_DS7
B-43.4 /
XDS7 4

XES11 3
XDSN_MK_ES11
B-39.9 /
XES11 4

XES71 3
XDSN_MK_ES71
B-43.8 /
XES71 4

XES72 3
XDSN_MK_ES72
B-43.10 /
XES72 4

+MK

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S DC DISTRIBUTION PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
FOR SIGNAL CIRCUIT Job No. Drawing No. Page B-6
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

XDSP XDSN
B-2.5 / B-2.6 /

XDS 1 XDS 6
XDSP_INT XDSP_CTRL_L XDSN_MK XDSN_CTRL
B-33.6 / /B-38.2 B-6.6 / /B-38.2
XDS 2 XDS 7
XDSP_CTRL_R
/B-45.4
XDS 3 XDS 8
XDSP_BP
/B-37.2
XDS 4 XDS 9

XDS 5 XDS 10
Unauthorized duplication prohibited without written consent

XT1P XT1N XT2P XT2N


B-1.5 / B-1.5 / B-1.8 / B-1.9 /

XT1 1 XT1 11 XT2 1 XT2 11


XT1P_MK XT1N_MK XT2P_MK XT2N_MK
B-34.1 / B-34.2 / B-36.2 / B-36.2 /
XT1 2 XT1 12 XT2 2 XT2 12
XT1P_INT_R XT1P_F74 XT1N_F74 XT2P_F74 XT2N_F74
B-33.4 / /B-32.2 /B-32.2 /B-32.6 /B-32.6
XT1 3 XT1 13 XT2 3 XT2 13
XT1P_CTRL XT1N_CTRL XT2P_XG2 XT2N_F86S
/B-34.1 /B-34.1 /B-31.6 /B-31.6
XT1 4 XT1 14 XT2 4 XT2 14
XT1P_CTRL_L XT1N_CTRL_L
/B-34.7 /B-34.7
XT1 5 XT1 15 XT2 5 XT2 15
XT1P_CLO XT1N_F86P
/B-34.10 /B-31.2
XT1 6 XT1 16 XT2 6 XT2 16
XT1P_XG3
/B-31.2
XT1 7 XT1 17 XT2 7 XT2 17
XT1P_PLC
/B-45.2
XT1 8 XT1 18 XT2 8 XT2 18

XT1 9 XT1 19 XT2 9 XT2 19

XT1 10 XT1 20 XT2 10 XT2 20

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S DC DISTRIBUTION PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
FOR CONTROL & PROTECTION CIRCUIT Job No. Drawing No. Page B-7
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

Current transformer, ratio 400-600-800/1-1-1-1-1A


o
Đolnglường
dùng cun
dùngCLcuộn
0.5 CL 0.5 Bảo vệ dùng cuộn 5P20
CL 5P20 CL 0.5 CL 5P20 CL 5P20

1S1 1S4 2S1 2S4 4S1 4S4 5S1 5S4


CB side
+CT

1S1 1S4 2S1 2S4 4S1 4S4 5S1 5S4

1S1 1S4 2S1 2S4 4S1 4S4 5S1 5S4

1 2 3 4 5 6 7 8
WAA_1

WAA_1

WAA_1

WAA_1

WAA_1

WAA_1

WAA_1

WAA_1
1 2 3 4 5 6 7 8
WAB_1

WAB_1

WAB_1

WAB_1

WAB_1

WAB_1

WAB_1

WAB_1
1 2 3 4 5 6 7 8
WAC_1

WAC_1

WAC_1

WAC_1

WAC_1

WAC_1

WAC_1

WAC_1
Unauthorized duplication prohibited without written consent

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24
1

9
XA XA XA XA
+MK

PE PE PE PE
G1 G1 G1

WAK_1 1 2 3 4 WAK_2 1 2 3 4 WAK_3 1 2 3 4 WAK_B 1 2 3 4

XA 1 2 3 4 XA 5 6 7 8 XA 9 10 11 12 XA 13 14 15 16
XINMM
XIAMM

XICMM
XIBMM

XINBB
XINR1

XINR2

XIABB

XICBB
XIAR1

XICR1

XIAR2

XICR2

XIBBB
XIBR1

XIBR2
B-18.1 /

B-18.1 /

B-18.1 /

B-18.1 /

B-11.1 /

B-11.1 /

B-11.1 /

B-11.1 /

B-13.1 /

B-13.1 /

B-13.1 /

B-13.1 /

B-15.1 /

B-15.1 /

B-15.1 /

B-15.1 /
Current circuit for multifunction meter Current circuit for F87L Current circuit for F67 Current circuit for F87B

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S CURRENT CIRCUIT CONNECTION PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-8
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

XV 1 WVBP 1 XV 1 2
2 2 3 4
3 3 5 6
4 4 7 8

SPARE
Unauthorized duplication prohibited without written consent

1 3 12 14
FVTSP
2A 11
2 4

/B-3.3
XVNSP
XVPSP
B-13.1 /

B-13.1 /
Voltage circuit for F67, class 3P

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S VOLTAGE CIRCUIT CONNECTION PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-9
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20 VT line 110kV


A
B

/ B-5.10

/ B-5.10
C

+VT_LINE
CL:0.5 CL:3P CL:0.5 CL:3P CL:0.5 CL:3P
10VA 25VA 10VA 25VA 10VA 25VA

XACC_MK_VTBOX

XACN_MK_VTBOX
PE PE PE

VTA VTB VTC


PE PE PE
A1 N1 A3 N3 B1 N1 B3 N3 C1 N1 C3 N3

1 2 1 2 1 2 1 2 1 2 1 2

WVA_1

WVA_2

WVB_1

WVB_2

WVC_1

WVC_2
Unauthorized duplication prohibited without written consent

XAC 1 2

1 3

FAC
10A
2 4

XV 1 2 3 4 XV 7 8 9 10
2 3 x1
+VTL_BOX

5 11 SHG %rF R1
L x2
6 12

PE PE
14 11 /B-10.6
12
12 14 12 14 12 14
1 3 5 7 12 14 FVTP FAC FVTM 1 3 5 7 12 14
/B-10.8 /B-10.10 11 /B-10.3
FVTM 11 11 FVTP
2A 11 2A 11
2 4 6 8 2 4 6 8
/B-10.7

/B-10.5
XV 13 14 15 16 XS 1 3 XS 1 2 3 XV 17 18 19 20

WVE_1 1 2 3 4 WVTE 1 2 3 4 5 WVE_2 1 2 3 4

XV 9 10 11 12 XS 21 XRTK 4 5 6 XV 13 14 15 16
XSP_FVTP_ON
XSP_VTLBOX

FAC_VT_OFF
XRTKP_CH5
XVMN_MM
XVMA_MM

XVMC_MM
XVMB_MM

FVTM_ON

XVPN_R1
XVPA_R1

XVPC_R1
XVPB_R1
B-18.1 /

B-18.1 /

B-18.1 /

B-18.1 /

B-6.6 /

B-22.7 /

B-26.9 /

B-26.6 /

B-26.7 /

B-11.1 /

B-11.1 /

B-11.1 /

B-11.1 /
Voltage circuit for BCU Voltage circuit for F87L, F67

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S VOLTAGE CIRCUIT CONNECTION PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-10
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

F87L_T

XG1
XIAR1 1 2
IA
B-8.4 /
11 12
/B-52.1 IB
XIBR1 3 4
B-8.4 /
13 14
IC
XICR1 5 6
B-8.4 /
15 16

XINR1 7 8
IN
B-8.4 /
17 18

XG1
XVPA_R1 21 22
V1
B-10.8 /
1 2
/B-52.1 V2
XVPB_R1 23 24
B-10.8 /
3 4

XVPC_R1 25 26
V3
B-10.8 /
5 6

XVPN_R1
Unauthorized duplication prohibited without written consent

27 28
B-10.9 /

XVPA_R2
/B-13.1

XVPB_R2
/B-13.1

XVPC_R2
/B-13.1

XVPN_R2
/B-13.1

VS
7 8

F87L_PWS F87L_CPU

XG1
XR1P 13 14
B-1.3 / PORTE1
/B-52.1
XR1N
B-1.3 /
ETH
29 30 PORTE2

ETH
/B-12.6

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S F87L PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
CURRENT AND VOLTAGE CIRCUIT CONNECTION Job No. Drawing No. Page B-11
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

19-Jul-20

F87L_T1 F87L_T2

FUNCTION FUNCTION
1 1
BI1 /B-20.2 CB CLOSED BO1 /B-35.6 TRIP COIL 1
2 2
3 3
BI2 /B-20.3 MANUAL CLOSE FOR SOTF BO2 /B-31.4 TRIP F86P
4 4
5 5
BI3 /B-20.4 SW87L OFF BO3 /B-24.8 START 50BF
6 6
7 7
BI4 /B-20.5 POTT SIG BO4 /B-22.9 3PAR INITIATE
8 8
9 9
BI5 /B-20.6 F85 ALARM BO5 /B-44.3 F85 SIGNAL
10 10
11 11
BI6 /B-20.7 SPARE BO6 /B-28.2 F87L TRIP
12 12
13 13
BI7 /B-20.8 SPARE BO7 /B-49.10 F59 TRIP
14 14
15 15
BI8 /B-20.9 SPARE BO8 /B-50.1 F27 ALARM
16 16
17 17
Unauthorized duplication prohibited without written consent

BI9 /B-20.10 SPARE BO9 /B-50.2 21 ZONE 1 TRIP


18 18
21 21
BI10 /B-21.2 SPARE BO10 /B-50.3 21 ZONE 2 TRIP
22 22
23 23
BI11 /B-21.3 SPARE BO11 /B-50.4 21 ZONE 3 TRIP
24 24
25 25
BI12 /B-21.4 SPARE BO12 /B-50.4 21 ZONE 4 TRIP
26 26
27 27
BI13 /B-21.5 SPARE BO13 /B-50.5 67P1 TRIP
28 28
29 29
BI14 /B-21.6 SPARE BO14 /B-50.6 67N1 TRIP
30 30
31 31
BI15 /B-21.7 SPARE BO15 SPARE
32 32
33 33
BI16 /B-21.8 SPARE BO16 SPARE
34 34
35 35
BI17 /B-21.9 SPARE BO17 SPARE
36 36
37 37
BI18 /B-21.10 SPARE BO18 SPARE
38 38

F87L_PWS

FUNCTION

29
/B-11.4 POWER SUPPLY
30

1
RF1 2 /B-28.5 RELAY FAILURE 1
3
7
RF2 8 /B-50.10 RELAY FAILURE 2
9

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S F87L PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
IO BOARD Job No. Drawing No. Page B-12
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

F67_T

XG2
XIAR2 1 2
IA
B-8.6 /
17 18
/B-52.3 IB
XIBR2 3 4
B-8.6 /
19 20
IC
XICR2 5 6
B-8.6 /
21 22

XINR2 7 8
IN
B-8.7 /
23 24

25 26

XG2
XVPA_R2 21 22
V1
B-11.3 /
1 2
/B-52.3 V2
XVPB_R2 23 24
B-11.3 /
3 4

XVPC_R2 25 26
V3
B-11.3 /
5 6

XVPN_R2
Unauthorized duplication prohibited without written consent

27 28
B-11.3 /

XG2
XVPSP 9 10
VS
B-9.9 /
7 8
/B-52.3
XVNSP 11 12
B-9.9 /

F67_PWS F67_CPU

XG2
XR2P 13 14
B-1.7 / PORTE1
/B-52.3
XR2N
B-1.7 /
ETH
29 30 PORTE2

ETH
/B-14.6

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S F67 PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
CURRENT AND VOLTAGE CIRCUIT CONNECTION Job No. Drawing No. Page B-13
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

19-Jul-20

F67_T1 F67_T2

FUNCTION FUNCTION
1 1
BI1 /B-22.2 CB CLOSED BO1 /B-36.6 TRIP COIL 2
2 2
3 3
BI2 /B-22.3 MANUAL CLOSE FOR SOTF BO2 /B-31.8 TRIP F86S
4 4
5 5
BI3 /B-22.4 F79 ENABLE BO3 /B-24.9 START 50BF
6 6
7 7
BI4 /B-22.5 MANUAL CLOSE 25 BO4 /B-34.5 AR CMD
8 8
9 9
BI5 /B-22.6 F25 ENABLE BO5 /B-28.3 F85 SIGNAL
10 10
11 11
BI6 /B-22.7 FVTP MCB ON BO6 GEN TRIP FR
12 12
13 13
BI7 /B-22.8 FVTSP MCB ON BO7 /B-34.3 CB CLOSE CMD
14 14
15 15
BI8 /B-22.9 3PAR INITIATE BO8 /B-33.10 LINE NO VOLTAGE
16 16
17 17
Unauthorized duplication prohibited without written consent

BI9 /B-22.10 SPARE BO9 /B-49.5 SF6 LOW


18 18
21 21 /B-50.7
BI10 /B-23.2 SF6 LOW BO10 /B-49.6
SF6 LOCKOUT
22 22
23 23 /B-50.8
BI11 /B-23.3 SF6 LOCKOUT BO11 /B-49.7
SPRING DISCHARGED
24 24
25 25
BI12 /B-23.4 SPRING DISCHARGED BO12 /B-50.8 67P1 TRIP
26 26
27 27
BI13 /B-23.5 SPARE BO13 67N1 TRIP
28 28
29 29
BI14 /B-23.6 SPARE BO14 AR SUCCESSFUL
30 30
31 31
BI15 /B-23.7 SPARE BO15 SF6 LOW
32 32
33 33
BI16 /B-23.8 SPARE BO16 SPRING DISCHARGED
34 34
35 35
BI17 /B-23.9 SPARE BO17 SPARE
36 36
37 37
BI18 /B-23.10 SPARE BO18 SPARE
38 38

F67_PWS

FUNCTION

29
/B-13.4 POWER SUPPLY
30

1
RF1 2 /B-28.4 RELAY FAILURE 1
3
7
RF2 8 /B-50.10 RELAY FAILURE 2
9

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S F67 PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
IO BOARD Job No. Drawing No. Page B-14
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

F87B_S2

XG3
XIABB 1 2
IA
B-8.8 /
B3 B2
/B-52.5 IB
XIBBB 3 4
B-8.8 /
B6 B5
IC
XICBB 5 6
B-8.9 /
B9 B8
IC
XINBB 7 8
B-8.9 /
B12 B11

F87B_S6
Unauthorized duplication prohibited without written consent

PORTO1

/B-17.9
CHANNEL Y

PORTO2

/B-24.8
/B-17.9
CHANNEL X

X48P_STBF
+MK
F87B_S5
X48 1 2 3 4 5
E7
+48VDC Internal
E8 X48 1
X48P_MK_CB
B-24.5 /
X48 2
X48P_MK_DS1
B-24.1 /
X48 3
X48P_MK_DS7
B-24.3 /
X48 4

X48 5
XG3
XR3P 13 14
B-2.3 /
/B-52.5
XR3N
B-2.3 /

E1 E2

X48N_BB
/B-17.5 E9 /B-24.1
-48VDC Internal
E10

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S F87B - BAY UNIT PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
CURRENT AND VOLTAGE CIRCUIT CONNECTION Job No. Drawing No. Page B-15
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

15-Jul-20

F87B_S1 F87B_S2 F87B_S3

FUNCTION FUNCTION FUNCTION


A1 B3 C1
BI1 /B-24.2 DS1 CLOSED I1 /B-15.4 CURRENT PHASE A BI9 /B-25.2 SPARE
A2 B2 C2
A3 B6 C3
BI2 /B-24.3 DS1 OPENED I2 /B-15.4 CURRENT PHASE B BI10 /B-25.3 SPARE
A4 B5 C4
A5 B9 C5
BI3 /B-24.4 DS7 CLOSED I3 /B-15.4 CURRENT PHASE C BI11 /B-25.4 SPARE
A6 B8 C6
A7 B12 C7
BI4 /B-24.5 DS7 OPENED I4 /B-15.4 CURRENT PHASE N BI12 /B-25.5 SPARE
A8 B11 C8
A9 C9
BI5 /B-24.6 CB CLOSED BI13 /B-25.6 SPARE
A10 C10
A11 C11
BI6 /B-24.7 CB OPENED BI14 /B-25.7 SPARE
A12 C12
A13 C13
BI7 /B-24.8 START 50BF BI15 /B-25.8 SPARE
A14 C14
A15 C15
BI8 /B-24.9 SPARE BI16 /B-25.9 SPARE
A16 C16
Unauthorized duplication prohibited without written consent

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S F87B - BAY UNIT PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
IO BOARD Job No. Drawing No. Page B-16
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

19-Jul-20

F87B_S4 F87B_S5 F87B_S6

FUNCTION FUNCTION
D1
BO1 /B-36.6 TRIP COIL 2 E1
D2
/B-15.4 POWER SUPPLY
D3
BO2 /B-31.3 TRIP F86P E2 PORTO1
D4
D5 E11 /B-28.3
BO3 /B-44.5 TRIP TO REMOTE END RF RELAY FAILURE /B-15.5
D6 E12
CHANNEL Y
D7 E13
BO4 SPARE RH /B-50.9 RELAY HEALTHY
D8 E14
D9
PORTO2
BO5 SPARE
D10
/B-15.5
D11
BO6 /B-28.4 F87B TRIP CHANNEL X
D12
D15
BO7 D13 /B-49.8 RETRIP OR BACKTRIP COIL2
D14
D18
BO8 D16 50BF TRIP
Unauthorized duplication prohibited without written consent

/B-49.8
D17

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S F87B - BAY UNIT PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
IO BOARD Job No. Drawing No. Page B-17
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

M1 P1
PM800 Class 0.5 A1700

I1 XG4 IA
XIAMM 1 2
B-8.1 /
12 13 1 3
I2 /B-52.7 IB
XIBMM 3 4
B-8.2 /
14 15 4 6
I3 IC
XICMM 5 6
B-8.2 /
16 17 7 9
Unauthorized duplication prohibited without written consent

XINMM 7 8
B-8.2 /

VA XG4
XVMA_MM 21 22
VA
B-10.3 /
8 2
VB /B-52.7 VB
XVMB_MM 23 24
B-10.3 /
9 5
VC VC
XVMC_MM +/P -/N
25 26
B-10.3 /
10 8
VN
XVMN_MM 27 28
B-10.3 /
11 11

XMMP
B-2.7 /

XMMN
B-2.7 /

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S MULTIFUNCTION METER PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
CURRENT AND VOLTAGE CIRCUIT CONNECTION Job No. Drawing No. Page B-18
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

19-Jul-20

RTK RTK

FUNCTION FUNCTION
R1_1
CH1 1 /B-26.2 FDC RP FAIL R1 /B-51.6 FDC RP FAIL
R1_2
CH2 2 /B-26.3 FAC RP FAIL R2_1
R2 /B-51.7 FAC RP FAIL
R2_2
CH3 3 /B-26.4 MCB MK FAIL
R3_1
4 R3 MCB MK FAIL
CH4 /B-26.5 SPARE R3_2
COM
R4_1
CH5 1 /B-26.6 FAC VT FAIL R4 SPARE
R4_2
R5_1
CH6 2 /B-26.7 FVTM MCB ON R5 FAC VT FAIL
R5_2
CH7 3 /B-26.8 SPARE R6_1
R6 FVTM MCB ON
4 R6_2
CH8 /B-26.9 SPARE
COM R7_1
R7 SPARE
R7_2
CH9 1 /B-27.2 TRIP COIL1 FAIL
R8_1
CH10 2 /B-27.3 TRIP COIL2 FAIL R8 SPARE
R8_2
R9_1
Unauthorized duplication prohibited without written consent

CH11 3 /B-27.4 F86 OPERATED R9 /B-51.8 TRIP COIL1 FAIL


R9_2
4
CH12 /B-27.5 CB Spring Discharged R10_1
COM R10 /B-51.8 TRIP COIL2 FAIL
R10_2
CH13 1 /B-27.6 CB SF6 Alarm R11_1
R11 /B-51.9 F86 OPERATED
R11_2
CH14 2 /B-27.7 CB SF6 Lockout
R12_1
CH15 3 /B-27.8 CB LOCAL R12 /B-23.2 CB SF6 Alarm
R12_2
4 R13_1
CH16 /B-27.9 CB MCB FAIL R13 /B-23.3 CB SF6 Lockout
COM R13_2
R14_1
CH17 1 /B-28.2 F87L TRIP R14 /B-23.4 Spring Discharged
R14_2
CH18 2 /B-28.3 F67 TRIP R15_1
R15 /B-51.1 CB LOCAL
R15_2
CH19 3 /B-28.4 F87B TRIP
R16_1
4 R16 /B-51.2 CB MCB FAIL
CH20 /B-28.5 F87L/F67/F87B FAIL R16_2
COM
R17_1
CH21 1 /B-28.6 DS1 MCB FAIL R17 /B-49.9 F87L TRIP
R17_2
R18_1
CH22 2 /B-28.7 DS1 REMOTE R18 F67 TRIP
R18_2
CH23 3 /B-28.8 DS7 MCB FAIL R19_1
R19 F87B TRIP
4 R19_2
CH24 /B-28.9 DS7 REMOTE
COM R20_1
R20 F87L/F67/F87B FAIL
R20_2
R21_1
R21 /B-51.3 DS1 MCB FAIL
R21_2
R22_1
R22 /B-51.4 DS1 REMOTE
R22_2
R23_1
R23 /B-51.4 DS7 MCB FAIL
R23_2
R24_1
R24 /B-51.5 DS7 REMOTE
R24_2

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S ANNUNCIATOR PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
IO BOARD Job No. Drawing No. Page B-19
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

CB CLOSED MANUAL CLOSE FOR SOTF SW87L OFF POTT SIG F85 ALARM SPARE SPARE SPARE SPARE
Unauthorized duplication prohibited without written consent

/B-22.1

/B-22.3

/B-22.4

/B-44.8

/B-44.9
/B-6.8
XSP_SW87

POTT_SIG

F85_AL
XSP_CB_CL_87

XSP_CB_MCL_87

XSP_SW79

1
SW87
/B-52.8 2

F87L_T1
/B-12.3
1 3 5 7 9 11 13 15 17

BI1 BI2 BI3 BI4 BI5 BI6 BI7 BI8 BI9

2 4 6 8 10 12 14 16 18

XSN_R1 XSN_R1_1
B-6.10 / /B-21.1

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S F87L PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
INPUT CARD T1 CONNECTION Job No. Drawing No. Page B-20
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE


Unauthorized duplication prohibited without written consent

F87L_T1
/B-12.3
21 23 25 27 29 31 33 35 37

BI10 BI11 BI12 BI13 BI14 BI15 BI16 BI17 BI18

22 24 26 28 30 32 34 36 38

XSN_R1_1 XSN_R2
B-20.10 / /B-22.1

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S F87L PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
INPUT CARD T1 CONNECTION Job No. Drawing No. Page B-21
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

CB CLOSED MANUAL CLOSE FOR SOTF F79 ENABLE MANUAL CLOSE 25 F25 ENABLE FVTP MCB ON FVTSP MCB ON 3PAR INITIATE SPARE

XSP_MK_CB
B-6.1 /

W0_4 1
+CB_BOX
XSP_CB
/B-29.3
X1 233

63
BG1
/B-53.2 64

X1 234

W0_4 2
Unauthorized duplication prohibited without written consent

/B-20.2

/B-20.3

/B-20.4

/B-37.4

/B-10.5

/B-23.2
/B-6.8

/B-3.5

/B-6.8
XSP_CB_CL_87

XSP_MAN_CL

XSP_CB_MCL_87

XSP_SW79

XSP_FVTP_ON

XSP_FVTSP_ON

XSP_INI
XSP_SWBP

XSP_SIG_CB
3 7 3 7 1 1 F87L_T2 7

K10L K10R SW79 SW25 BO4


/B-12.6
/B-34.8 11 /B-34.3 11 /B-52.6 2 /B-52.8 2 3PAR INITIATE 8

+MK

XCB 3 2 6
K10L
/B-34.8 10
WKE_3 5

XS 22

F67_T1
/B-14.3
1 3 5 7 9 11 13 15 17

BI1 BI2 BI3 BI4 BI5 BI6 BI7 BI8 BI9

2 4 6 8 10 12 14 16 18

XSN_R2 XSN_R2_1
B-21.10 / /B-23.1

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S F67 PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
INPUT CARD T1 CONNECTION Job No. Drawing No. Page B-22
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

SF6 LOW SF6 LOCKOUT SPRING DISCHARGED SPARE SPARE SPARE SPARE SPARE SPARE
Unauthorized duplication prohibited without written consent

/B-22.9
XSP_SIG_CB

RTK R12_1 RTK R13_1 RTK R14_1


R12 R13 R14
/B-19.6 /B-19.6 /B-19.6
CB SF6 Alarm R12_2 CB SF6 Lockout R13_2 Spring Discharged R14_2

F67_T1
/B-14.3
21 23 25 27 29 31 33 35 37

BI10 BI11 BI12 BI13 BI14 BI15 BI16 BI17 BI18

22 24 26 28 30 32 34 36 38

XSN_R2_1
B-22.10 /

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S F67 PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
INPUT CARD T1 CONNECTION Job No. Drawing No. Page B-23
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

DS1 CLOSED DS1 OPENED DS7 CLOSED DS7 OPENED CB CLOSED CB OPENED START 50BF SPARE

X48P_MK_DS1 X48P_MK_DS7 X48P_MK_CB


B-15.9 / B-15.9 / B-15.9 /

W1_3 6 W7_3 6 W0_4 3

X1 1 3
+DS1A
1 2
SAUX
/B-53.5 3 4

X1 2 4

W1AB_3 6 5
Unauthorized duplication prohibited without written consent

X1 1 3 X1 1 3 X1 243 241

/B-15.8
+CB_BOX
+DS1B

1 2 1 2 73 71

+DS7
SAUX SAUX BG1
/B-53.7 3 4 /B-53.1 3 4 /B-53.2 74 72

X48P_STBF
X1 2 4 X1 2 4 X1 244 242

W1BC_3 6 5

W7_3 8 7 W0_4 5 4

X1 1 3 19 19
XG1 XG2
/B-52.1 /B-52.3
20 20
+DS1C

1 2
SAUX
/B-53.8 3 4

X1 2 4 F87L_T2 5 F67_T2 5
BO3 BO3
/B-12.6 /B-14.6
START 50BF 6 START 50BF 6
W1C_3 1 2
+MK

XDS1 7 8 XDS7 7 8 XCB 8 10

WKE_3 8 9 10 11 6 7

XS 23 24 25 26 27 28

F87B_S1
/B-16.1
A1 A3 A5 A7 A9 A11 A13 A15

BI1 BI2 BI3 BI4 BI5 BI6 BI7 BI8

A2 A4 A6 A8 A10 A12 A14 A16

X48N_BB X48N_BB_1
B-15.9 / /B-25.1

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S F87B - BAY UNIT PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
INPUT CARD CONNECTION Job No. Drawing No. Page B-24
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE


Unauthorized duplication prohibited without written consent

F87B_S3
/B-16.8
C1 C3 C5 C7 C9 C11 C13 C15

BI9 BI10 BI11 BI12 BI13 BI14 BI15 BI16

C2 C4 C6 C8 C10 C12 C14 C16

X48N_BB_1
B-24.10 /

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S F87B - BAY UNIT PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
INPUT CARD CONNECTION Job No. Drawing No. Page B-25
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

FDC RP FAIL FAC RP FAIL MCB MK FAIL SPARE FAC VT FAIL FVTM MCB ON SPARE SPARE
Unauthorized duplication prohibited without written consent

/B-2.10

/B-5.10

/B-5.10

/B-10.6

/B-10.7

/B-10.6
/B-3.5
XRTKP_FDC_OFF

XRTKP_FAC_OFF

MCB_MK_OFF

FAC_VT_OFF

FVTM_ON
XRTKP_CH1

XRTKP_CH5
RTK
/B-19.3
1 2 3 4 1 2 3 4

CH1 CH2 CH3 CH4 CH5 CH6 CH7 CH8

COM COM

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S RTK PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
INPUT CHANNEL 1-8 CONNECTION Job No. Drawing No. Page B-26
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

TRIP COIL1 FAIL TRIP COIL2 FAIL F86 OPERATED CB Spring Discharged CB SF6 Alarm CB SF6 Lockout CB LOCAL CB MCB FAIL
+MK

XRTKP_CB
B-5.6 /

W0_4 6
+CB_BOX

X1 870 X1 872 X1 960 X1 886 X1 852 X1 878 X1 884

1 22 24 22 24 1 1 15 19 41 F2
BD1 K9 K10 BW1 BW2 S4 S4 F1 F2
2 21 21 2 2 16 20 42 42

X1 871 X1 873 X1 961 X1 888 X1 895 X1 879 X1 885


Unauthorized duplication prohibited without written consent

W0_4 7 8 10 11 9
/B-32.3

/B-32.7

/B-32.2
F741_F

F742_F

XRTKP_CH9
30 31 30 31
F86P F86S
/B-31.4 3 /B-31.8 3

+MK

XCB 4 5 6 7 9

WKE_3 12 13 14 15 16

XS 29 30 31 32 33

RTK
/B-19.3
1 2 3 4 1 2 3 4

CH9 CH10 CH11 CH12 CH13 CH14 CH15 CH16

COM COM

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S RTK PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
INPUT CHANNEL 9-16 CONNECTION Job No. Drawing No. Page B-27
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

F87L TRIP F67 TRIP F87B TRIP F87L/F67/F87B FAIL DS1 MCB FAIL DS1 REMOTE DS7 MCB FAIL DS7 REMOTE
+MK +MK

XRTKP_DS1 XRTKP_DS7
B-5.6 / B-5.6 /

W1_3 7

X2 25 27 29 33

+DS1A
41 95 95 7
SA SA2 SA1 SBT
42 96 96 8

X2 26 28 30 34
W7_3 9

W1AB_3 8 7 9
F87B_S5 E11 F67_PWS 1 3 F87L_PWS 1 3
Unauthorized duplication prohibited without written consent

RF RF1 RF1
/B-17.5
RELAY /B-14.6 /B-12.6
E12 RELAY 2 RELAY 2
FAILURE
FAILURE 1 FAILURE 1 X2 25 27 29 33 X2 25 27 29 33

+DS1B
41 95 95 7 41 95 95 7

+DS7
SA SA2 SA1 SBT SA SA2 SA1 SBT
42 96 96 8 42 96 96 8

X2 26 28 30 34 X2 26 28 30 34

W1BC_3 8 7 9

W7_3 10 11

X2 25 27 29 33

+DS1C
41 95 95 7
SA SA2 SA1 SBT
F87L_T2 11 F67_T2 9 F87B_S4 D11 42 96 96 8
BO6 BO5 BO6
/B-12.6 /B-14.6 /B-17.1
F87L TRIP 12 F67 TRIP 10 F87B TRIP D12 X2 26 28 30 34

W1C_3 3 4
+MK

XDS1 5 6 XDS7 5 6

WKE_3 17 18 19 20

XS 34 35 36 37

RTK
/B-19.3
1 2 3 4 1 2 3 4

CH17 CH18 CH19 CH20 CH21 CH22 CH23 CH24

COM COM

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S RTK PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
INPUT CHANNEL 17-24 CONNECTION Job No. Drawing No. Page B-28
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

XSP_CB XSP_MK_DS1 XSP_MK_DS7


B-22.2 / B-6.1 / B-6.1 /
W1_3 8

X1 5 7

+DS1A
5 6
SAUX
/B-53.5 7 8

X1 6 8
W7_3 12

W1AB_3 11 10

X1 253 251 X1 5 7 X1 5 7
Unauthorized duplication prohibited without written consent

+CB_BOX

+DS1B
83 81 5 6 5 6

+DS7
BG1 SAUX SAUX
/B-53.2 84 82 /B-53.7 7 8 /B-53.1 7 8

X1 254 252 X1 6 8 X1 6 8

W1BC_3 11 10

W0_4 13 12 W7_3 14 13

X1 5 7

+DS1C
5 6
SAUX
/B-53.8 7 8

X1 6 8

W1C_3 5 6
+MK
/B-6.10

/B-31.4

XCB 11 12 XDS1 9 10 XDS7 9 10


XSN_MM

XSP_PLT

WKE_4 1 2 3 4 5 6

XS 38 39 40 41 42 43
3 1 3 1 3 1
SCB SCB SDS1 SDS1 SDS7 SDS7
3 /B-52.2 /B-52.2 /B-52.3 /B-52.3 /B-52.5 /B-52.5
4 2 4 2 4 2
PLT
/B-52.9
4

X1 X1 X1
5 9 /B-29.4
1 1 5 2 6 3 7
6 10 /B-29.6
13
2
KLT SCB KLT SDS1 KLT SDS7
/B-29.2 /B-52.2 /B-29.2 /B-52.3 /B-29.2 /B-52.5
KLT 7 11 /B-29.8 9 10 11
110VDC 14 3
X2 X2 X2
LAMP TEST 8 12
4
XSN_MM_1
/B-30.1

CB STATUS DS1 STATUS DS7 STATUS

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S CB, DS1, DS7 STATUS PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-29
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

XSP_MK_ES11 XSP_MK_ES71 XSP_MK_ES72


B-6.1 / B-6.1 / B-6.1 /
W11_3 3

X1 5 7

+ES11A
5 6
SAUX
/B-53.6 7 8

X1 6 8
W71_3 3 W72_3 3

W11AB_3 4 3

X1 5 7 X1 5 7 X1 5 7
Unauthorized duplication prohibited without written consent

+ES11B
5 6 5 6 5 6

+ES71

+ES72
SAUX SAUX SAUX
/B-53.7 7 8 /B-53.3 7 8 /B-53.4 7 8

X1 6 8 X1 6 8 X1 6 8

W11BC_3 4 3

W71_3 5 4 W72_3 5 4

X1 5 7
+ES11C

5 6
SAUX
/B-53.9 7 8

X1 6 8

W11C_3 1 2
+MK

XES11 5 6 XES71 5 6 XES72 5 6

WKE_4 7 8 9 10 11 12

XS 44 45 46 47 48 49

2 1 2 1 2 1

LD11 LD71 LD72

4 4 4

XSN_MM_1
B-29.9 /

ES11 STATUS ES71 STATUS ES72 STATUS

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S ES11, ES71, ES72 STATUS PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-30
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

RESET F86
XSP_PLT
B-29.2 /

XSP_PRS
B-6.8 /

PLC_RS_86
B-45.9 /

PRS
/B-52.9
4

5 9 /B-31.4
1
6 10 /B-31.8
13
2
Unauthorized duplication prohibited without written consent

KRS 7 11
110VDC 14 3
RESET F86 8 12
4
XSN_RS
B-6.10 /

XT1P_TR86 XT2P_TR86
/B-35.2 /B-36.2
XG1 /B-52.1 XG2 /B-52.3
15 16 XT2P_XG2 15 16
B-7.8 /
XG3 /B-52.5
XT1P_XG3 15 16
B-7.3 /

XT1P_TR87 XT2P_TR67
B-35.2 / B-36.2 /

F87B_S4 D3 F87L_T2 3 1 5 F67_T2 3 2 6


BO2 BO2 KRS BO2 KRS
/B-17.1 /B-12.6 /B-14.6
TRIP F86P TRIP F86P /B-31.6 9 TRIP F86S /B-31.6 10
D4 4 4

DTT_SIG
B-44.8 /

11 1 /B-34.3 11 1 /B-34.3
10 10
21 2 /B-35.5 21 2 /B-36.5
20 20
31 3 /B-27.4 31 3 /B-27.5
30 30
41 4 /B-34.6 41 4 /B-34.6
F86P B D 40 F86S B D 40
110VDC 51 5 110VDC 51 5
50 50
SET RESET 61 6 SET RESET 61 6
60 60
A C 71 7 A C 71 7
70 70
81 8 81 8
XT1N_F86P 80 XT2N_F86S 80
B-7.5 / B-7.10 /

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S TRIP AND LOCKOUT RELAY PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-31
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

XT1P_F74 XT2P_F74
B-7.3 / B-7.8 /

XRTKP_CH9
Unauthorized duplication prohibited without written consent

B-27.5 /

F74_1A 5 6 1 4 F74_2A 5 6 1 4
110VDC 110VDC

K1 K2 K1 K2

2 2
9 13 10 14 12 8 9 13 10 14 12 8

XT1N_F74 XT2N_F74
B-7.5 / B-7.10 /
F741_F

F742_F
X10_1

X12_1

X10_2

X12_2
X4_1

X8_1

X4_2

X8_2
B-27.2 /
B-34.5 /

B-35.6 /

B-35.7 /

B-35.7 /

B-27.3 /
B-34.5 /

B-36.6 /

B-36.7 /

B-36.7 /
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY
.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S TRIP CIRCUIT SUPERVISOR RELAY PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-32
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

/B-34.1
/ B-7.1

/ B-7.2
/ B-33.4

/ B-33.5

/ B-33.9

/ B-33.6

XT1P_INT_R

INT_L

XDSP_INT
Note:

IN_CB_R

IN_CB_L

IN_ES11

IN_DS
Khảo sát điểm đấu tại tủ MK 112

XT1 22
W1_3 9 10 11 W11_3 4 WKE_1 17 18 19

XCB 13 XCB 14

+MK

+MK
X1 9 11 15 19 X1 11 X1 21
XDS1 11 14 XCB 15 XDS7 16

=112+ES24
+ES11A
+DS1A

9 10 14 18 10 21
W0_4 14 W7_4 6
SAUX SAUX

IN_CB_R

IN_CB_L
/B-53.5 11 12 16 20 /B-53.6 12 22

X1 10 12 16 20 X1 12 X1 231 X1 22 X1 19

B-33.1 /

B-33.2 /
/ B-33.1

/ B-33.2

/ B-33.2

+CB_BOX
61 18

+DS7
W24 1 2
Unauthorized duplication prohibited without written consent

BG1 SAUX
W1AB_3 15 12 13 14 W11AB_3 5 /B-53.2 62 /B-53.1 20

DS1_CL_CBR

DS1_OP_CBR

DS1_OP_CBL

=112+MK
X1 232 XES24 10 XES24 10 X1 20
X1 9 11 15 19 X1 11

W0_4 15 WK112 1 2 W7_4 7


+ES11B
+DS1B

9 10 14 18 10
SAUX SAUX
/B-53.7 11 12 16 20 /B-53.7 12 XDS1 12 13 15 XCB 16 XES71 7 XES71 10 XDS7 17

+MK
X1 10 12 16 20 X1 12 XDS7 11 13 14 XES11 7 XES71 8 XES72 7 XDS1 16 XDS7 18

W7_4 3 1 2 W71_3 6 W72_3 6

W1BC_3 15 12 13 14 W11BC_3 5 XDS 14

X1 9 11 15 X1 11 X1 11

IN_ES11
/ B-33.2
/ B-33.3

IN_DS
X1 9 11 15 19 X1 11 9 10 14 10 10 F67_T2 15

+ES71

+ES72
+DS7

SAUX SAUX SAUX BO8


/B-14.6

DS1_OP_ES11
/B-53.1 /B-53.3 /B-53.4
+ES11C

LINE

ES11_OP_DS
11 12 16 12 12
+DS1C

9 10 14 18 10 16

B-33.2 /
B-33.3 /
SAUX SAUX NO VOLTAGE
/B-53.8 11 12 16 20 /B-53.9 12 X1 10 12 16 X1 12 X1 12

X1 10 12 16 20 X1 12
W7_4 5 4 W71_3 7 W72_3 7

XDS7 12 15 XES11 8 XES71 9 XES72 8 XDS1 17


+MK

W1C_3 7 8 9 10 W11C_3 3
DS1_OP_ES11
DS1_OP_CBR

DS1_OP_CBL

ES11_OP_DS
DS1_CL_CBR

XT1 21 XT1 23 XDS 11 XDS 12 XDS 13


CB_INT_R

ES11_INT

ES72_INT
DS7_INT

DS1_INT
INT_L1
B-33.4 /

B-33.4 /

B-33.5 /

B-33.9 /

B-33.5 /

B-34.1 /

B-34.1 /

B-37.4 /

B-37.3 /

B-37.6 /

B-37.8 /
Dùng output của F67 để check điện áp

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S HARD INTERLOCK FOR PRIMARY EQUIPMENT PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-33
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20
Remote close Local close
XT1P_CTRL XT1P_CTRL_L

/B-7.3
B-7.3 / B-7.3 /
1
SWEC

XT1P_CLO
/B-52.9 2
F67_T2 13 F67_T2 7
BO7 BO4

/B-45.2
CB_INT_R /B-14.6 /B-14.6
B-33.4 / CB CLOSE CMD 14 AR CMD 8 3
XT1P_SWL_O
/B-35.2 SW25
Thiếu tiếp điểm F74 /B-52.8

X10_1
4

PLC_CL_CB
10 11 40 41
F86P F86P 5 1 5 1 5
/B-31.4 /B-31.4
1 4 SCB K10L K10R

B-32.4 /
/B-52.2 6 /B-34.8 9 /B-34.3 9
10 11 40 41
5 9 /B-34.9
F86S F86S 1
/B-31.8 1 /B-31.8 4 6 10 /B-22.5
13

/B-32.7
2
K10L 7 11 /B-22.2
13 13 110VDC 14 3
8 12
KI_1 K10R 4 1 5

X10_2
110VDC 110VDC
14 14 KI_1
Unauthorized duplication prohibited without written consent

/B-34.3 9
XT1N_CTRL XT1N_CTRL_L XT1N_CTRL_O
B-7.5 / B-7.5 / /B-35.2

XT1P_MK
B-7.1 /
5 9 /B-34.9 5 9 /B-34.10 XT1 26 27
1 1
6 10 6 10 WKE_1 1 2 3
2 2
7 11 7 11 /B-22.3 +MK
3 3
8 12 8 12 XCB 22 23 24
4 4

W0_3 1 2 3
+MK +CB_BOX

X1 607 X1 531 X1 610

XT1P_CB
XT1 24 WKE_1 5 XCB 17 18 W0_3 5 X1 627

B-35.4 /
L R
1 5
S4
KBP2
/B-37.7 9

XT1 25 6 XCB 20 19 6 X1 602


INT_L1
INT_L

XT1N_MK 4 XCB 21 4 X1 625


B-7.3 / 11

12
B-33.5 /

B-33.5 /

MK_XCBP W0_1 1 X1 450


B-4.3 /
-Y1-B
Local interlock Power supply for motor
DS1 & DS7 opened MK_XCBN 2 X1 460
B-4.3 /
X1 626 XT1N_CB
/B-35.4

MK_XCB_A W0_2 1 X1 500


B-5.2 /

Power supply for heating and lighting


MK_XCB_N 2 X1 515
B-5.5 /

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S CB CLOSING CIRCUIT PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-34
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

XT1P_TR87
B-31.2 /

XT1P_TR86
B-31.5 /

PLC_OP_CB Open CB from PLC


B-45.3 /

XT1P_SWL_O
B-34.9 /

7 1 5 20 21 F87L_T2 1

SCB K00 F86P BO1


/B-12.6
/B-52.2 8 /B-35.3 9 /B-31.4 2 TRIP COIL 1 2
Unauthorized duplication prohibited without written consent

/B-32.4

/B-32.4

/B-32.5
5 9 /B-35.5
1
6 10 /B-36.5
13
2

X12_1

X4_1

X8_1
K00 7 11
110VDC 14 3
8 12
4

XT1 28 29 30 31 32 33
XT1N_CTRL_O
B-34.9 /
WKE_1 7 8 9 10

Repeat opening +MK


XCB 25 26 27 28

W0_3 7 8 9 10
+CB_BOX

X1 630 X1 689 X1 688 629

TC1

XT1P_CB X1 600
B-34.7 /

XT1N_CB X1 605
B-34.9 /

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S CB TRIPPING 1 CIRCUIT PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-35
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

XT2P_BB
B-36.2 /

XT2P_TR67
B-31.6 /

XT2P_TR86
B-31.9 /

XT2P_TEL
B-44.6 /

XT2P_BB
B-36.2 / 17
XG3
/B-52.5
18

2 6 20 21 F67_T2 1 F87B_S4 D1

K00 F86S BO1 BO1


/B-14.6 /B-17.1
/B-35.3 10 /B-31.8 2 TRIP COIL 2 TRIP COIL 2
2 D2
Unauthorized duplication prohibited without written consent

/B-32.8

/B-32.8

/B-32.8
X12_2

X4_2

X8_2
XT2 21 22 23 24 25 26

WKE_1 11 12 13 14
+MK
XCB 31 32 33 34

W0_3 11 12 13 14
+MK +CB_BOX

X1 730 X1 789 X1 788 729

TC2

XT2P_MK WKE_1 15 XCB 29 W0_3 15 X1 700


B-7.6 /

XT2N_MK 16 XCB 30 16 X1 705


B-7.8 /

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S CB TRIPPING 2 CIRCUIT PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-36
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

XDSP_BP
B-7.4 /

1 5 2 6 3 7 4 8
KBP1 KBP1 KBP1 KBP1
/B-37.6 9 /B-37.6 10 /B-37.6 11 /B-37.6 12

/B-33.10
/B-33.8

/B-33.7

/B-33.9
DS1_INT

DS7_INT

ES11_INT

ES72_INT
Unauthorized duplication prohibited without written consent

ES11_OK

ES72_OK
DS1_OK

DS7_OK
B-39.4 /

B-43.3 /

B-39.9 /

B-43.10 /
XSP_SWBP
B-22.5 /

1
SWBP
/B-52.6 2

13 13
KBP1 KBP2
110VDC 14 110VDC 14

XSN_KBP
B-6.10 /

5 9 /B-37.3 5 9 /B-34.2
1 1
6 10 /B-37.5 6 10
2 2
7 11 /B-37.7 7 11
3 3
8 12 /B-37.8 8 12
4 4

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S INTERLOCK FOR DS1, DS7, ES11, ES71, ES72 PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-37
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

Local control Remote control

XDSP_CTRL_L
B-7.4 /

5
SWEC
/B-52.9 6

XDSP_CTRL_L_1
Unauthorized duplication prohibited without written consent

/B-42.2

5 7

/B-45.4

/B-45.5
SDS1 SDS1
/B-52.3 6 /B-52.3 8

PLC_CL_DS1

PLC_OP_DS1
13 13
K11 K01
110VDC 14 110VDC 14

XDSN_CTRL XDSN_CTRL_1
B-7.9 / /B-42.2

DS1 closing DS1 opening


5 9 /B-39.2 5 9 /B-39.3
1 1
6 10 6 10
2 2
7 11 7 11
3 3
8 12 8 12
4 4

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S DS1 CONTROL CIRCUIT PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-38
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

/B-37.3

/B-37.7
/ B-6.1

/ B-4.7

/ B-4.8

/ B-5.3

/ B-5.5

/ B-5.3

/ B-5.4

/ B-6.1
+MK
DS1_OK

XDSN_MK_DS1

MK_XDSP_DS1

MK_XDSN_DS1

MK_XDS1_B

MK_XDS1_N

MK_XES11_A

MK_XES11_N

ES11_OK

XDSN_MK_ES11
9 9
K11 K01
/B-38.6 5 1 /B-38.8 5 1

XDS 15 16 17 18 XDS 19

WKE_2 1 2 3 4 WKE_2 5
+MK
XES11 10 ES71_OK
/B-43.7
XDS1 18 19 20 21 XES11 9
Unauthorized duplication prohibited without written consent

W1_3 3 5 4 1 2 W1_1 1 2 W1_2 1 2 W11_2 1 2 W11_3 1 2


W1AB_3 3 X1C
/B-40.1
4 X1O
/B-40.1
1 X1P
/B-40.1
2 X1N
/B-40.1
W1AB_1 1 X1MP W11AB_2 1 X11CP
/B-40.1 /B-40.8
2 X1MN 2 X11CN
/B-40.1 /B-40.8
W1AB_2 1 X1CP W11AB_3 1 X11MP
/B-40.1 /B-40.8
2 X1CN 2 X11MN
/B-40.1 /B-40.8

X2 22 23 21 13 14 X2 03 04 X2 17 18 X1 34 35 X1 36 37

1 3 1 3

K2A CSC K1E CSO F1 -QM1 -QF3


2 4 2 4

X1 4A

X1 4B
-K2A K1E
3 1
R R
X1 12
2
S2A S2A
X1 12A
17

X1 6
L1
K1E K1E OC OC CC CC KA4
18

K2A
KA4
M
S1E

S1E

+DS1A +ES11A

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S DS1A CONTROL CIRCUIT PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
ES11A HEATING AND LIGHTING CIRCUIT Job No. Drawing No. Page B-39
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20
Unauthorized duplication prohibited without written consent

X1C W1BC_3 3 X1C_1


B-39.7 / /B-41.1
X1O 4 X1O_1
B-39.7 / /B-41.1
X1P 1 X1P_1
B-39.7 / /B-41.1
X1N 2 X1N_1
B-39.7 / /B-41.1
X1MP W1BC_1 1 X1MP_1 X11CP W11BC_2 1 X11CP_1
B-39.7 / /B-41.1 B-39.10 / /B-41.8
X1MN 2 X1MN_1 X11CN 2 X11CN_1
B-39.7 / /B-41.1 B-39.10 / /B-41.8
X1CP W1BC_2 1 X1CP_1 X11MP W11BC_3 1 X11MP_1
B-39.7 / /B-41.1 B-39.10 / /B-41.8
X1CN 2 X1CN_1 X11MN 2 X11MN_1
B-39.7 / /B-41.1 B-39.10 / /B-41.8

X2 22 23 21 13 14 X2 03 04 X2 17 18 X1 34 35 X1 36 37

1 3 1 3

K2A CSC K1E CSO F1 -QM1 -QF3


2 4 2 4

X1 4A

X1 4B
-K2A K1E
3 1
R R
X1 12
2
S2A S2A
X1 12A
17

X1 6
L1
K1E K1E OC OC CC CC KA4
18

K2A
KA4
M
S1E

S1E

+DS1B +ES11B

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S DS1B CONTROL CIRCUIT PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
ES11B HEATING AND LIGHTING CIRCUIT Job No. Drawing No. Page B-40
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20
Unauthorized duplication prohibited without written consent

X1C_1
B-40.7 /
X1O_1
B-40.7 /
X1P_1
B-40.7 /
X1N_1
B-40.7 /
X1MP_1 X11CP_1
B-40.7 / B-40.10 /
X1MN_1 X11CN_1
B-40.7 / B-40.10 /
X1CP_1 X11MP_1
B-40.7 / B-40.10 /
X1CN_1 X11MN_1
B-40.7 / B-40.10 /

X2 22 23 21 13 14 X2 03 04 X2 17 18 X1 34 35 X1 36 37

1 3 1 3

K2A CSC K1E CSO F1 -QM1 -QF3


2 4 2 4

X1 4A

X1 4B
-K2A K1E
3 1
R R
X1 12
2
S2A S2A
X1 12A
17

X1 6
L1
K1E K1E OC OC CC CC KA4
18

K2A
KA4
M
S1E

S1E

+DS1C +ES11C

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S DS1C CONTROL CIRCUIT PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
ES11C HEATING AND LIGHTING CIRCUIT Job No. Drawing No. Page B-41
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

Local control Remote control

XDSP_CTRL_L_1
B-38.5 /
Unauthorized duplication prohibited without written consent

5 7

/B-45.6

/B-45.7
SDS7 SDS7
/B-52.5 6 /B-52.5 8

PLC_CL_DS7

PLC_OP_DS7
13 13
K17 K07
110VDC 14 110VDC 14

XDSN_CTRL_1
B-38.9 /

DS7 closing DS7 opening


5 9 /B-43.1 5 9 /B-43.2
1 1
6 10 6 10
2 2
7 11 7 11
3 3
8 12 8 12
4 4

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S DS7 CONTROL CIRCUIT PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-42
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

/B-39.10
/B-37.5

/B-37.8
/ B-6.1

/ B-4.8

/ B-4.8

/ B-5.4

/ B-5.4

/ B-6.1

/ B-6.1
+MK
DS7_OK

XDSN_MK_DS7

MK_XDSP_DS7

MK_XDSN_DS7

MK_XDS7_C

MK_XDS7_N

ES71_OK

XDSN_MK_ES71

ES72_OK

XDSN_MK_ES72
9 9
K17 K07
/B-42.6 5 1 /B-42.8 5 1

XDS 20 21 22 23 XDS 24

WKE_2 6 7 8 9 WKE_2 10
+MK

XDS7 19 20 21 22 XES71 11 XES72 9


Unauthorized duplication prohibited without written consent

W7_3 3 5 4 1 2 W7_1 1 2 W7_2 1 2 W71_3 1 2 W72_3 1 2

W71_2 1 W72_2 1
2 2

X2 22 23 21 13 14 X2 03 04 X2 17 18 X1 34 35 X1 36 37 X1 34 35 X1 36 37

1 3 1 3

K2A CSC K1E CSO F1 -QM1 -QF3


2 4 2 4

X1 4A

X1 4B
-K2A K1E
3 1
R R R
X1 12
2
S2A S2A
X1 12A
17 17

X1 6
L1 L1
K1E K1E OC OC CC CC KA4 KA4
18 18

K2A
KA4
M
S1E

S1E

+DS7 +ES71 +ES72

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S DS7 CONTROL CIRCUIT PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
ES71, ES72 HEATING AND LIGHTING CIRCUIT Job No. Drawing No. Page B-43
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

XSP_RME_21 XT2P_TEL
B-6.8 / B-36.2 /

Nguồn dương cho mạch POTT và F85 alarm

Nguồn dương cho mạch trip 86S


F87L_T2 9 F87B_S4 D5
BO5 BO3
/B-12.6 /B-17.1
Unauthorized duplication prohibited without written consent

F85 SIGNAL 10 TRIP TO REMOTE END D6

XT3 1 XT3 3 XT3 4 XT3 5

WTEL 1 2 3 4

TEL+RP

XT172 1 XT172 3 XT172 4 XT172 5

XT172 2 XT172 6 XT172 7 XT172 8

WTEL 5 6 7 8

XT3 2 XT3 6 XT3 7 XT3 8

XSN_TEL
B-6.10 /

POTT_SIG

DTT_SIG

F85_AL
B-20.5 /

B-31.6 /

B-20.6 /
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY
.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S SIGNAL TO TELEPROTECTION PANEL PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-44
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

/B-7.3

/B-7.4

/B-6.8
XT1P_PLC

XDSP_CTRL_R

XSP_RS
7 11
SWEC SWEC
/B-52.9 8 /B-52.9 12

XT3 9 12 17
Unauthorized duplication prohibited without written consent

PLC PANEL

Nguồn dương điều khiển máy cắt Nguồn dương điều khiển dao cách ly Nguồn dương reset tín hiệu F86

XT3 10 11 13 14 15 16 18

PLC_OP_DS1

PLC_OP_DS7
PLC_CL_DS1

PLC_CL_DS7
PLC_OP_CB
PLC_CL_CB

PLC_RS_86
B-34.7 /

B-35.2 /

B-38.6 /

B-38.8 /

B-42.6 /

B-42.8 /

B-31.4 /
Close CB from PLC Open CB from PLC Close DS1 from PLC Open DS1 from PLC Close DS7 from PLC Open DS7 from PLC Reset F86 from PLC

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S CONTROL OUTPUT FROM PLC PANEL PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-45
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20 Note:
Khảo sát điểm đấu từ mosaic board

+MOSAIC X1 13

WMOS 1
+MK

XCB 35 36 XDS1 22 23 XDS7 23 24 XES11 11 12 XES71 12 13 XES72 10 11

W1_3 12 W11_3 5

X1 21 23 X1 21 23

+ES11A
+DS1A
21 22 21 22
SAUX SAUX
/B-53.5 23 24 /B-53.6 23 24
Unauthorized duplication prohibited without written consent

X1 22 24 X1 22 24
W0_5 1 W7_4 8 W71_3 8 W72_3 8

W1AB_3 16 17 W11AB_3 6 7

X1 263 261 X1 21 23 X1 21 23 X1 21 23 X1 21 23 X1 21 23
+CB_BOX

+ES11B
+DS1B

93 91 21 22 21 22 21 22 21 22 21 22

+ES71

+ES72
+DS7
BG1 SAUX SAUX SAUX SAUX SAUX
/B-53.2 94 92 /B-53.7 23 24 /B-53.1 23 24 /B-53.7 23 24 /B-53.3 23 24 /B-53.4 23 24

X1 264 262 X1 22 24 X1 22 24 X1 22 24 X1 22 24 X1 22 24

W1BC_3 16 17 W11BC_3 6 7

W0_5 3 2 W7_4 9 10 W71_3 9 10 W72_3 9 10

X1 21 23 X1 21 23

+ES11C
+DS1C

21 22 21 22
SAUX SAUX
/B-53.8 23 24 /B-53.9 23 24

X1 22 24 X1 22 24

W1C_3 11 12 W11C_3 4 5
+MK

XCB 37 38 XDS1 24 25 XDS7 25 26 XES11 13 14 XES71 14 15 XES72 14 15

WMOS 2 3 4 5 6 7 8 9 10 11 12 13
+MOSAIC

XCB 1 2 XDS1 1 2 XDS7 1 2 XES11 1 2 XES71 1 2 XES71 3 4

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S PRIMARY EQUIPMENT STATUS FOR MOSAIC BOARD PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-46
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20 Note:
Khảo sát điểm đấu từ plc panel

+PLC X1 13

WPLC_1 1
+MK

XCB 39 40 XDS1 26 27 XDS7 27 28 XES11 15 16 XES71 16 17 XES72 12 13

W1_3 13 W11_3 6

X1 25 27 X1 25 27

+ES11A
+DS1A
25 26 25 26
SAUX SAUX
/B-53.5 27 28 /B-53.6 27 28
Unauthorized duplication prohibited without written consent

X1 26 28 X1 26 28
W0_5 4 W7_4 11 W71_3 11 W72_3 11

W1AB_3 18 19 W11AB_3 8 9

X1 283 281 X1 25 27 X1 25 27 X1 25 27 X1 25 27 X1 25 27
+CB_BOX

+ES11B
+DS1B

113 111 25 26 25 26 25 26 25 26 25 26

+ES71

+ES72
+DS7
BG1 SAUX SAUX SAUX SAUX SAUX
/B-53.2 114 112 /B-53.7 27 28 /B-53.1 27 28 /B-53.7 27 28 /B-53.3 27 28 /B-53.4 27 28

X1 284 282 X1 26 28 X1 26 28 X1 26 28 X1 26 28 X1 26 28

W1BC_3 18 19 W11BC_3 8 9

W0_5 6 5 W7_4 12 13 W71_3 12 13 W72_3 12 13

X1 25 27 X1 25 27

+ES11C
+DS1C

25 26 25 26
SAUX SAUX
/B-53.8 27 28 /B-53.9 27 28

X1 26 28 X1 26 28

W1C_3 13 14 W11C_3 6 7
+MK

XCB 41 42 XDS1 28 29 XDS7 29 30 XES11 17 18 XES71 18 19 XES72 16 17

WPLC_1 2 3 4 5 6 7 8 9 10 11 12 13
+PLC

XCB 1 2 XDS1 1 2 XDS7 1 2 XES11 1 2 XES71 1 2 XES71 3 4

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S PRIMARY EQUIPMENT STATUS FOR PLC PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-47
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20 Note:
Khảo sát điểm đấu từ plc panel

+PLC X1 13

WPLC_2 1

XT3 19

/B-50.1
XPLCP
Unauthorized duplication prohibited without written consent

7 5 3 3 3 F67_T2 17 F67_T2 21 F67_T2 23 F87B_S4 D15D14 F87B_S4 D18D17 RTK R17_1 F87L_T2 13

SWEC SW25 SWBP SW87 SW79 BO9 BO10 BO11 BO7 BO8 R17 BO7
/B-14.6 /B-14.6 /B-14.6 /B-17.1 /B-17.1 /B-19.6 /B-12.6
/B-52.9 8 /B-52.8 6 /B-52.6 4 /B-52.8 4 /B-52.6 4 SF6 LOW SF6 LOW SPRING RETRIP 50BF TRIP F87L TRIP F59 TRIP
18 22 24 D13 D16 R17_2 14
DISCHARGED OR BACKTRIP
COIL2

SF6 Lockout to computer system


SF6 Low computer system
Switch bypass enable

F87B signal for PLC

50BF signal for PLC

F87L signal for PLC


Switch 87L enable

F59 signal for PLC


Spring discharged
Switch 25 enable

Switch 79 enable
Bay remote ctrl

XT3 20 21 22 23 24 25 26 27 28 29 30 31

WPLC_2 2 3 4 5 6 7 8 9 10 11 12 13
+PLC

X1 13 13 13 13 13 13 13 13 13 13 13 13

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S 172 BAY STATUS FOR PLC PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-49
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20 Note:
Khảo sát điểm đấu từ plc panel

+PLC

/B-49.10

/B-51.1
XPLCP

XPLCP1
Unauthorized duplication prohibited without written consent

F87L_T2 15 F87L_T2 17 F87L_T2 21 F87L_T2 23 F87L_T2 25 F87L_T2 27 F87L_T2 29 F67_T2 21 F67_T2 23 F67_T2 25 F87B_S5 E13 F87L_PWS 7 9 F67_PWS 7 9
BO8 BO9 BO10 BO11 BO12 BO13 BO14 BO10 BO11 BO12 RH RF2 RF2
/B-12.6 /B-12.6 /B-12.6 /B-12.6 /B-12.6 /B-12.6 /B-12.6 /B-14.6 /B-14.6 /B-14.6 /B-17.4 /B-12.6 /B-14.6
F27 ALARM 16 21 ZONE 1 18 21 ZONE 2 22 21 ZONE 3 24 21 ZONE 4 26 67P1 TRIP 28 67N1 TRIP 30 67P1 TRIP 22 67N1 TRIP 24 AR 26 RELAY E14 RELAY 8 RELAY 8
SUCCESSFUL HEALTHY FAILURE 2 FAILURE 2

Autoreclose command to Computer system


F87L - F21 zone 1 trip

F87L - F21 zone 2 trip

F87L - F21 zone 3 trip

F87L - F21 zone 4 trip


F27 signal for PLC

F87L - F67N1 trip


F87L - F67P1 trip

F67N1 trip
F67P1 trip
XT3 32 33 34 35 36 37 38 39 40 41 42 43 44

WPLC_2 14 15 16 17 18 19 20 WPLC_3 1 2 3 4 5 6
+PLC

X1 13 13 13 13 13 13 13 13 38 39 36 37 38

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S 172 BAY STATUS FOR PLC PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-50
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20 Note:
Khảo sát điểm đấu từ plc panel

+PLC

/B-50.10
XPLCP1
Unauthorized duplication prohibited without written consent

RTK R15_1 RTK R16_1 RTK R21_1 RTK R22_1 RTK R23_1 RTK R24_1 R1_1 R2_1 R9_1 R10_1 R11_1
R15 R16 R21 R22 R23 R24 R1 R2 R9 R10 R11
/B-19.6 /B-19.6 /B-19.6 /B-19.6 /B-19.6 /B-19.6 /B-19.6 /B-19.6 /B-19.6 /B-19.6 /B-19.6
CB LOCAL R15_2 CB MCB FAIL R16_2 DS1 MCB FAIL R21_2 DS1 REMOTE R22_2 DS7 MCB FAIL R23_2 DS7 REMOTE R24_2 FDC RP FAIL R1_2 FAC RP FAIL R2_2TRIP COIL1 FAIL R9_2TRIP COIL2 FAIL R10_2 F86 OPERATED R11_2

XT3 45 46 47 48 49 50 51 52 53 54 55

WPLC_3 7 8 9 10 11 12 13 14 15 16 17
+PLC

X1 13 X1 13 X1 13 X1 13 X1 13 X1 13 X1 13 X1 13 X1 13 X1 13 X1 13

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S 172 BAY STATUS FOR PLC PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-51
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20
XG1 XG2 XG3 XG4

PRS
GREEN
1 2 /B-11.3 1 2 /B-13.3 1 2 /B-15.3 1 2 /B-18.7
3 4 /B-11.3 3 4 /B-13.3 3 4 /B-15.3 3 4 /B-18.7
5 6 /B-11.3 5 6 /B-13.3 5 6 /B-15.3 5 6 /B-18.7 3 4 /B-31.6

7 8 /B-11.3 7 8 /B-13.3 7 8 /B-15.3 7 8 /B-18.7


9 10 9 10 /B-13.3 9 10 9 10
11 12 11 12 /B-13.3 11 12 11 12
13 14 /B-11.3 13 14 /B-13.3 13 14 /B-15.3 13 14 PLT
YELLOW
15 16 /B-31.3 15 16 /B-31.7 15 16 /B-31.3 15 16
17 18 17 18 17 18 /B-36.6 17 18
3 4 /B-29.2
19 20 /B-24.8 19 20 /B-24.9 19 20 19 20
21 22 /B-11.3 21 22 /B-13.3 21 22 21 22 /B-18.7
23 24 /B-11.3 23 24 /B-13.3 23 24 23 24 /B-18.7
Unauthorized duplication prohibited without written consent

25 26 /B-11.3 25 26 /B-13.3 25 26 25 26 /B-18.7


27 28 /B-11.3 27 28 /B-13.3 27 28 27 28 /B-18.7

SCB SDS1 SDS7 SWBP SW87 SWEC


2 3 2 3 2 3 1 1 1 2

1 1 1 0 0
0 0 0

CONTACT

CONTACT

CONTACT
POSITION POSITION POSITION POSITION POSITION POSITION
CONTACT

CONTACT

CONTACT
0 1 2 3 0 1 2 3 0 1 2 3 0 1 0 1 1 2
1-2 /B-37.6 1-2 /B-20.4 1-2 /B-34.8

X1-X2 /B-29.4 X1-X2 /B-29.6 X1-X2 /B-29.8 3-4 /B-49.3 3-4 /B-49.4 3-4 /B-38.3
1-2 /B-29.5 1-2 /B-29.7 1-2 /B-29.9 5-6 5-6 5-6 /B-45.2
3-4 /B-29.4 3-4 /B-29.6 3-4 /B-29.8 7-8 7-8 7-8 /B-49.1

5-6 /B-34.8 5-6 /B-38.3 5-6 /B-42.3 9-10 /B-45.4


SW79 SW25
7-8 /B-35.3 7-8 /B-38.4 7-8 /B-42.4 11-12
1 1 2
9-10 9-10 9-10 13-14
11-12 11-12 11-12 0 15-16

CONTACT

CONTACT
POSITION POSITION

0 1 1 2
1-2 /B-22.4 1-2 /B-22.5
3-4 /B-49.4 3-4 /B-34.9
5-6 5-6 /B-49.2
7-8 7-8

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S ACCESSORIES PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-52
PLA2_DNI_172
DATE STAMP 1 2 3 4 5 6 7 8 9 10

20-Jul-20

BG1 BG2 SAUX SAUX SAUX

61 62 /B-33.6 201 202 1 3 /B-24.2 1 3 /B-24.2 1 3 /B-24.2


63 64 /B-22.2 203 204 2 4 /B-24.3 2 4 /B-24.3 2 4 /B-24.3
71 72 /B-24.7 211 212 5 7 /B-29.6 5 7 /B-29.6 5 7 /B-29.6
73 74 /B-24.6 213 214 6 8 /B-29.7 6 8 /B-29.7 6 8 /B-29.7
81 82 /B-29.5 221 222 9 11 /B-33.1 9 11 /B-33.1 9 11 /B-33.1
83 84 /B-29.4 223 224 10 12 /B-33.2 10 12 /B-33.2 10 12 /B-33.2
91 92 /B-46.2 231 232 13 15 13 15 13 15
93 94 /B-46.1 233 234 14 16 /B-33.2 14 16 /B-33.2 14 16 /B-33.2
+CB_BOX

+CB_BOX

+DS1A

+DS1C
+DS1B
111 112 /B-47.2 17 19 17 19 17 19
113 114 /B-47.1 18 20 /B-33.2 18 20 /B-33.2 18 20 /B-33.2
21 23 /B-46.3 21 23 /B-46.3 21 23 /B-46.3
22 24 /B-46.3 22 24 /B-46.3 22 24 /B-46.3
25 27 /B-47.3 25 27 /B-47.3 25 27 /B-47.3
26 28 /B-47.3 26 28 /B-47.3 26 28 /B-47.3
29 31 29 31 29 31
30 32 30 32 30 32
33 35 33 35 33 35
Unauthorized duplication prohibited without written consent

34 36 34 36 34 36
37 39 37 39 37 39
38 40 38 40 38 40

SAUX SAUX SAUX SAUX SAUX SAUX

1 3 /B-24.4 1 3 1 3 1 3 1 3 1 3
2 4 /B-24.5 2 4 2 4 2 4 2 4 2 4
5 7 /B-29.8 5 7 /B-30.5 5 7 /B-30.7 5 7 /B-30.3 5 7 /B-30.3 5 7 /B-30.3
6 8 /B-29.9 6 8 /B-30.6 6 8 /B-30.8 6 8 /B-30.4 6 8 /B-30.4 6 8 /B-30.4
9 11 /B-33.4 9 11 9 11 9 11 9 11 9 11
10 12 /B-33.4 10 12 /B-33.7 10 12 /B-33.7 10 12 /B-33.3 10 12 /B-33.3 10 12 /B-33.3
13 15 13 15 13 15 13 15 13 15 13 15
14 16 /B-33.5 14 16 14 16 14 16 14 16 14 16

+ES11A

+ES11C
+ES11B
17 19 17 19 17 19 17 19 17 19 17 19
+ES71

+ES72
+DS7

18 20 /B-33.9 18 20 18 20 18 20 18 20 18 20
21 23 /B-46.4 21 23 /B-46.8 21 23 /B-46.9 21 23 /B-46.6 21 23 /B-46.6 21 23 /B-46.6
22 24 /B-46.5 22 24 /B-46.8 22 24 /B-46.10 22 24 /B-46.7 22 24 /B-46.7 22 24 /B-46.7
25 27 /B-47.4 25 27 /B-47.8 25 27 /B-47.9 25 27 /B-47.6 25 27 /B-47.6 25 27 /B-47.6
26 28 /B-47.5 26 28 /B-47.8 26 28 /B-47.10 26 28 /B-47.7 26 28 /B-47.7 26 28 /B-47.7
29 31 29 31 29 31 29 31 29 31 29 31
30 32 30 32 30 32 30 32 30 32 30 32
33 35 33 35 33 35 33 35
34 36 34 36 34 36 34 36
37 39 37 39 37 39 37 39
38 40 38 40 38 40 38 40

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY


.
t Project = DNI_172
A FOR APPROVAL 10.04.20 12.04.20 EI S ACCESSORIES PHAN LAM 2 SOLAR POWER PLANT
B FOR FACTORY 18.05.20 20.05.20 + RP
Job No. Drawing No. Page B-53
PLA2_DNI_172