Вы находитесь на странице: 1из 27

SIP Title Research and process improvement of manufacturing and engineering companies in India

SIP Status on 31/05 Introduction and Basic Research on Manufacturing and Engineering sector companies in India and making a list of it.

WEEK WORK DONE DURING THE WEEK

01/06 to 07/06

Studying the application of our product in the sectors alloted i.e. Engineering and Iron &steel sectors.
Introduction of the product to the potential clients.

08/06 to 14/06 Continued the search of potential clients for our product. Also researching on the process improvment tools which can be applies to increase the efficiency of the ongoing process.
SIP Title Research on manufacturing and engineering companies in India

SIP Status on 31/05 Introduction and Basic Research on Manufacturing and Engineering domains and relevance with respect to company's business.

WEEK WORK DONE DURING THE WEEK

01/06 to 07/06
1. Understanding the Product Range offered by the company and the
Business Practice and Strategies for overall Business Development. 2. Data
formation of companies identifying the potential clients.
08/06 to 14/06
SIP Title Research on Manufacturing and engineering companies in india.

SIP Status on 31/05 Did Research about the companies under Automobile and Logistics Sector and study where the application of our product in that sector.

WEEK WORK DONE DURING THE WEEK

01/06 to 07/06

Did basic research about the companies in automobile and logistics sector.
Finding the Information about potential clients by Using various tools.
SIP Title PLEASE LIST YOUR TITLE HERE

SIP Status on 31/05 PLEASE MENTION STATUS HERE


PLEASE MENTION STATUS HERE
WEEK WORK DONE DURING THE WEEK

01/06 to 07/06
SIP Title Challanges and opportunities for 3PL service providers in Pharma supply chain.

SIP Status on 31/05 Not recieved.

WEEK WORK DONE DURING THE WEEK

01/06 to 07/06

1. Sent research proposal 2. Read secondary data such as research papers


and articles.
SIP Title To study how SCM works for manufacturing company, from being manufactured till it reaches the end consumer.

SIP Status on 31/05 1.Completed Master class in Logistics


2. Searched info about company online.
WEEK WORK DONE DURING THE WEEK

01/06 to 07/06

Gained information about raw material being supplied to company


SIP Title Reverse Auction

SIP Status on 31/05 PLEASE MENTION STATUS HERE


1. Studied about the company(Elpee Chemicals Pvt Ltd). 2) Studied and Analyzed the data
WEEK WORK DONE DURING THE WEEK

01/06 to 07/06

1) Done pareto analysis for the given data. 2)Sorted Chemicals according to
ABC-XYZ Analysis. 3)Read and Learnt Basic things about Reverse Auction.
SIP Title To Explore the Application of AI in the area of SCM (Inventory Control, Warehousing, Strategic Sourcing, Procurement) in Retail/ Automobile Sector.

SIP Status on 31/05 Studied modern technology deployment in warehouse functioning and acquainted smart warehousing practices.
PLEASE MENTION STATUS HERE
WEEK WORK DONE DURING THE WEEK

01/06 to 07/06

1) Analyzed the requirement of AI in SCM. 2) Read research papers and


case studies related to the AI tools.
SIP Title Cut Down the Deficiency of Material’s on the Shop Floor

SIP Status on 31/05 1)Introduction of company and manufacturing process of the. 2) Addressed with Raw Materials, Supplementary Materials and Spares Material
PLEASE MENTION STATUS HERE
WEEK WORK DONE DURING THE WEEK

01/06 to 07/06

1)Practical work related maing PR, Quotations, Comparatives, and purchase order. 2)Current Production Planning process
SIP Title sip at schmersal india: understanding master data validation on SAP R/3.

SIP Status on 31/05 project yet to start.


PLEASE MENTION STATUS HERE
WEEK WORK DONE DURING THE WEEK

01/06 to 07/06

Made reserch proposal for institutional project, as well as done little reserch
on supply chain risk management in fmcg sector.
SIP Title Reverse Auction

SIP Status on 31/05 PLEASE MENTION STATUS HERE


Studied the chemicals and its components and the factors that affects the purchasing in API industries.
WEEK WORK DONE DURING THE WEEK

01/06 to 07/06

Done Pareto analysis with the help of ABC-XYZ analysis of chemicals


required by company.
SIP Title Improve the Sales & Marketing process using Six Sigma Techniques

SIP Status on 31/05 Introduction to tools used for managing sales data for tracking clients & leads

WEEK WORK DONE DURING THE WEEK

Introduction to Automation studio software basics, enough to let prospects


01/06 to 07/06 know about the product. Introduction to Maximizer CRM for future extraction of
relevant data. The week spent in actual understanding of how the day gets
divided and also about the company policies, etc.

Started with project charter and SIPOC. Data extraction is going on


08/06 to 14/06 simultaneously. Data segregation and client interaction was also done this
week.
SIP Title PLEASE LIST YOUR TITLE HERE

SIP Status on 31/05 PLEASE MENTION STATUS HERE


PLEASE MENTION STATUS HERE
WEEK WORK DONE DURING THE WEEK

01/06 to 07/06
SIP Title To work on raw materials using Kanban system.

SIP Status on 31/05 Not received yet


PLEASE MENTION STATUS HERE
WEEK Did online course of Advanced excel on Udemy. Working on another online course of Blockchain technology

01/06 to 07/06

Confirmed SIP at SIGMA Toolings. Get to know about company's all the
information such as products, suppliers, customers, supply chain processes.
Also learning about how to use kanban system. Started discussion with
company. Side by side doing online course of supply chain analytics and
sourcing.
SIP Title To study Warehouse Management System (WMS)

SIP Status on 31/05 Just started learning WMS software


Reading the fuctions of warhouse management and implimentation of WPS
WEEK WORK DONE DURING THE WEEK

I have collected secondary data from the research papers and related
01/06 to 07/06
articles.
SIP Title To study the supply chain management of fruits and vegetables (perishables) with new agricultural reforms in place

SIP Status on 31/05 I studied different supply chains of the perishable goods, non-perishable goods, grocery stores, etc

WEEK WORK DONE DURING THE WEEK

01/06 to 07/06

1. I have collected all the required secondary data like research papers and
news articles
SIP Title To integrate a traditional bookstore business into an e-commerce setup and analyze the necessary supply chain elements

SIP Status on 31/05 Requirement gathered from company and shared with developer. Did research on costing of application for android and iOS. UI/UX finalized of website and andorid application.

WEEK WORK DONE DURING THE WEEK

1.) First draft of website and android application completed and submitted to
01/06 to 07/06 the company 2.) Website hosted on demo server. 3.) Report made on
changes required by the company and submitted to the developer.

1.) Bug report created alongwith the report of changes required and
submitted to the developer. 2.) Did a competitors analysis and SWOT
analysis for the company. 3.) Created and Floated a google form for
research purposes to check about the reach of the company and which book
08/06 to 14/06 categories are famous and need to be highlighted on the website.
SIP Title "Digital Twin: Supply Chain"

SIP Status on 31/05 Not received

WEEK WORK DONE DURING THE WEEK

Read different articles and reports about need of supply chain digitization.
01/06 to 07/06
Gathered information about traditional ERP and its shortcomings.

Read and analysed different articles and blogs about "Digital Twin"
08/06 to 14/06
technology
SIP Title Managing the sourcing events like RFI, RFP and Auctions for client company using SAP Ariba cloud solution for procurement process

SIP Status on 31/05 My training was going on under the guidance of consultant alloted by company. Under which I got training regarding Upstream events like RFI and RFP with SAP Ariba.
As well as i went through some reading materials and Videos for getting overview of SAP Ariba cloud solution.
WEEK WORK DONE DURING THE WEEK

01/06 to 07/06

1) Created RFI as per the requirement of client company. 2) Created RFP


as per requirement of client company. 3) Learned about supplier
registration process on SAP - Ariba platform. 4) went through reading
material regarding different types of auction process in SAP - Ariba
08/06 to 14/06 went through training about Auction Types and Read about SAP ARIBA Applications.
SIP Title SCM Model of Excellence

SIP Status on 31/05 Introduction to topic


Searching Keywords related to the topic
WEEK
Searching and reading research papers related to topic SCM Excellence
model and collecting the information about how to achieve Supply chain
01/06 to 07/06 excellence in the industry and identifying the enablers which impacts
SCM performance.

Making the summary of all the research papers/ industry articles and
identifying the factors like enablers, foundation and pillars for building a
08/06 to 15/06
supply chain excellence house.

Learning about the house of quality (QFD) and Manufacturing


Excellence.
SIP Title Blockchain Technology for Shipping Industry & Study on TradeLens- A platform by Maersk and IBM

SIP Status on 31/05 Submitted Proposal for the topic- Blockchain Technology for Logistics Industry & Study on TradeLens- A platform by Maersk and IBM

WEEK WORK DONE DURING THE WEEK

01/06 to 07/06

1. Reframed topic from Blockchain for Logistics to Blockchain for Shipping


industry.2 Studied blockchain technology in detail and its applications. 3.
Read news and articles related to TradeLens
SIP Title To implement DDMRP using excel model for automotive industry.

SIP Status on 31/05 Introduction to the DDMRP Concept

WEEK Reading the material regarding the necessity of DDMRP

Reading material regarding the factors considered for deciding the position
01/06 to 07/06 for decoupling buffers, calculation of buffer zones and dynamic adjustment
of the buffer.
08/06 to 14/06 Read the next part of the process regarding buffer adjustment and net flow equation, supply order generation, started with pilot excel model
SIP Title To study the RFID technique in inventory management

SIP Status on 31/05 Studied and submitted the reserach proposal in consulatation with the internal guide.
PLEASE MENTION STATUS HERE
WEEK WORK DONE DURING THE WEEK

1) Read some articles about the RFID technology. 2) Read some reserach
01/06 to 07/06
papers about the sectors that have implemented the RFID technology.

1) reading and collecting more information about the RFID and its
08/06 to 14/06 implementation. 2) Studying the basics of inventory management
SIP Title TO DEVELOP DDMRP USING EXCEL MODEL FOR AUTOMOBILE INDUSTRY

SIP Status on 31/05 UNDERSTANDING BASIC CONCEPT OF DDMRP , DECOUPLING

WEEK STUDY MATERIAL OF DDMRP

01/06 to 07/06

STUDY MATERIAL OF DDMRP COMPONENTS, RULES USED IN


DDMRP, STRATEGIC INVENTORY POSITION AND BUFFER ZONES.
8/06 to 14/06 READING MATERIAL ON DYNAMIC ADJUSTMENTS AND NET FLOW EQUATION
SIP Title SIP at Schmersal India Pvt Ind, To study about Master Data Validation on SAP R/3

SIP Status on 31/05 Project Confirmation will be done shortly

WEEK WORK DONE DURING THE WEEK

Completed two certification in Supply Chain Logistics and Supply chain


01/06 to 07/06 Operations, (Started form 22nd May). Institue Project-: Gathered various articles
related to logistics managment.
SIP Title Intelligent warehousing -using RFID and UWB for inventory Management

SIP Status on 31/05 just started to learn about the RFID and UWB techniques
Reading the material of inventory management
WEEK Work done this week

01/06 to 07/06

I have made the research proposal for Intelligent warehousing -using RFID
and UWB for inventory Management and collecting the data for the same.
SIP Title IMPACT OF CORONAVIRUS ON WAREHOUSING

SIP Status on 31/05 INTRODUCTION OF THE TOPIC AND A FEW EFFECTS OF COVID-19 ON WAREHOUSING

WEEK WORK DONE DURING THE WEEK

01/06 to 07/06

1-READ A FEW ARTICLES ON THE TOPIC


2-LISTED FEW MORE EFFECTS OF CORONAVIRUS ON
WAREHOUSING

Вам также может понравиться