Date Area Job Type Length Width Total Amt Remarks Brick Work 5" 10
Brick work 10" 5 19 95 665 Brick Work 10" 7
Brick work 10" 3 5 15 105 Plaster 9
Brick work 10" 1 4 4 28 PCC 4" 6.5
1 1-Jun-20 TFH Brick work 10" 4 22 88 616 Sand Cutting 50
Soil Cutting 18 3 45 6300 Soil Cutting 140
Soil Cutting 18 3 45 6300 Slab fitting 8
Soil Cutting 13 3 33 4550
Brick work 10" 4 22 88 616
2 2-Jun-20 TFH
Brick work 10" 2 18 36 252
PCC 4" 19 15 855 5558 3 portions
3 3-Jun-20 Canteen PCC 4" 37 15 555 3608
Brick work 15" 17 2 34 578
Plaster 48 6 289 2603
Brick work 15" 34 3 85 1445
4 4-Jun-20 TFH
PCC 4" 15 3 38 244
PCC 4" 16 3 40 260
Plaster 48 6 289 2603
Brick work 15" 15 3 38 638
Canteen
Brick work 15" 16 3 40 680
5 5-Jun-20
PCC 4" 20 1 17 108
Plaster 60 6 360 3240
TFH
Plaster 4 4 16 144
Plaster 22 4 88 792
TFH
Plaster 19 6 114 1026
6 6-Jun-20 PCC 4" 54 1 45 292
Canteen PCC 4" 18 1 15 97.5
PCC 4" 26 1 22 141
Brick work 15" 25 3 63 1063
PCC 4" 20 1 17 108
Canteen
PCC 4" 53 1 44 289
PCC 4" 19 0.33 6 42
Plaster 19 6 115 1036.8
7 7-Jun-20
Plaster 22 6 133 1198.8
TFH
Plaster 19 6 114 1026
Plaster 8 6 47 421.2
Brick work 9" 8 5 40 280
Boundary Wall
Brick work 9" 8 5 40 280
49232.081
19 326
3 11.09.20
Supply Laxman
Description No. of Person Time In
Block shifting from cooling tower & ceramic outside for boundary extention 5 helper 8:00 AM
Filling near drain side of main shed 1 Helper 3:00 PM
3 Reja
Block shifting from cooling tower to boundary 4 helper 9:00 AM
Time Out
04.00 PM
5:00 PM
01.00 PM
Sada+Sushanth+Kunu+Bikas Ceramics - -
Bharat+Rupa+Rana Compressor ACM Bag Filter Vibro Screen