Sl.No.

Date Area Job Type Length Width Total Amt Remarks Brick Work 5" 10
Brick work 10" 5 19 95 665 Brick Work 10" 7
Brick work 10" 3 5 15 105 Plaster 9
Brick work 10" 1 4 4 28 PCC 4" 6.5
1 1-Jun-20 TFH Brick work 10" 4 22 88 616 Sand Cutting 50
Soil Cutting 18 3 45 6300 Soil Cutting 140
Soil Cutting 18 3 45 6300 Slab fitting 8
Soil Cutting 13 3 33 4550
Brick work 10" 4 22 88 616
2 2-Jun-20 TFH
Brick work 10" 2 18 36 252
PCC 4" 19 15 855 5558 3 portions
3 3-Jun-20 Canteen PCC 4" 37 15 555 3608
Brick work 15" 17 2 34 578
Plaster 48 6 289 2603
Brick work 15" 34 3 85 1445
4 4-Jun-20 TFH
PCC 4" 15 3 38 244
PCC 4" 16 3 40 260
Plaster 48 6 289 2603
Brick work 15" 15 3 38 638
Canteen
Brick work 15" 16 3 40 680
5 5-Jun-20
PCC 4" 20 1 17 108
Plaster 60 6 360 3240
TFH
Plaster 4 4 16 144
Plaster 22 4 88 792
TFH
Plaster 19 6 114 1026
6 6-Jun-20 PCC 4" 54 1 45 292
Canteen PCC 4" 18 1 15 97.5
PCC 4" 26 1 22 141
Brick work 15" 25 3 63 1063
PCC 4" 20 1 17 108
Canteen
PCC 4" 53 1 44 289
PCC 4" 19 0.33 6 42
Plaster 19 6 115 1036.8
7 7-Jun-20
Plaster 22 6 133 1198.8
TFH
Plaster 19 6 114 1026
Plaster 8 6 47 421.2
Brick work 9" 8 5 40 280
Boundary Wall
Brick work 9" 8 5 40 280
49232.081

19 326

Sl.No. Date Area Job Type Length Width Total Amt


Plaster 50 14
20 13
Parafit 10'' 50 1
1 1-Jul-20 Canteen 20 1
Parafit plaster 50 1 2 side
20 1 2 side
front pcc4" 15'.2" 4'.10''
Gali pcc 4'' 23' 2'
2 2-Jul-20
30' 3'

3 3-Jul-20 TFH Ramp casting 4'' 26' 5'

Bricks wall 10'' 42' 1'.8''


wall plaster 42' 1'.8'' 2 side
4 4-Jun-20 Transformer

Linter 71' 6''


Store 2
70' 6''
5 5-Jun-20
Linter plaster 71' 6'' 2 side
70' 6'' 2 side

Linter 74' 6''


Pump house
wall plaster 74' 8' 2 side
6 6-Jun-20 floor pcc 4'' 30' 14'

Block bricks 90' 2'


Boundry

pcc6'' 4'.8'' 12'


7 7-Jun-20
pcc4'' 4'.8'' 12'
Meter room

600 kl dyke Bricks wall 10'' 13' 4'.5''


wall 5' 4'
wall plaster 13' 4'.5'' 0
5' 4'

ceramics dryer casting 1' 4'.8'' 12'


20' 2'.8''

Rod binding 300 kg


Gate fixing 3 nos
Summary Item Unit Rate Qty Total Rate
1 Brick Work 5" 10 0 0
2 Brick Work 10" 7 326 2282
Brick Work 15" 17 259 4403
3 Plaster 9 1565.6 14090
4 PCC 4" 6.5 1653.336 10747
5 Sand Cutting 50 0 0
6 Soil Cutting 140 122.5 17150
7 Brick work 9" 7 80 560
49232.08
Supply Laxman
Sl.No. Date
1 12.09.20
2 11.09.20

3 11.09.20
Supply Laxman
Description No. of Person Time In
Block shifting from cooling tower & ceramic outside for boundary extention 5 helper 8:00 AM
Filling near drain side of main shed 1 Helper 3:00 PM
3 Reja
Block shifting from cooling tower to boundary 4 helper 9:00 AM
Time Out
04.00 PM
5:00 PM

01.00 PM
Sada+Sushanth+Kunu+Bikas Ceramics - -
Bharat+Rupa+Rana Compressor ACM Bag Filter Vibro Screen

Suren+Ranjan 500KL Tank SS Conveyor Sliding Gate

Kunal+Himanshu Oleo Ladder Resin Piping 250KL Heat Tracer

Pappu+Gopal Filter Press loading Shed Ladder Pipe Line Testing

Neti Piping Maintenance -

Deepak ACM Hood Bio Diesel Frame Fire Fighting line

Manesh Rack Colony Sheeting Tray

Mantra Store 1&2