Lean Management of Environmental Consulting

Daniel R. Ball1 and John Maleyeff 2

Abstract: Lean management has traditionally been adopted by manufacturing industries to improve operations through the identification
and elimination of all forms of waste. Encouraged by the successful integration of lean principles in service industries, this article provides
an investigation into the applicability of lean management principles to improve business operations in an environmental consulting
company. An organized approach of applying the five fundamental concepts of lean management 共specify value, identify the value stream,
Downloaded from ascelibrary.org by New York University on 05/13/15. Copyright ASCE. For personal use only; all rights reserved.

flow, pull, and perfection兲 is presented in a manner that environmental managers may use as a model to achieve specific operational goals.
Examples are presented to illustrate how lean concepts were applied at two environmental consulting firms.
DOI: 10.1061/共ASCE兲0742-597X共2003兲19:1共17兲
CE Database keywords: Consulting services; Management; Environmental engineering.

Introduction size employee productivity. However, this emphasis may indi-


rectly encourage unnecessary project work, the development of a
Lean management is a total business approach designed to iden- project backlog, systemic underdelegation, and result in a loss of
tify and eliminate forms of waste in the process of producing focus on the customer’s goals. The implementation of lean man-
goods, services, or combinations of both. Typical forms of waste agement principles in service businesses may increase efficiency
include defects, rework, transportation, overproduction, waiting, and reduce project costs but may consequently reduce revenues
unnecessary processing, unnecessary movement, inventory, be- 共due to reduced billability兲 unless the firm is able to capitalize on
haviors 共Emiliani 1998兲, and systemic underdelegation where a its newly available resources and attract additional work.
task could have been done by someone more junior and less Five fundamental concepts have been established to define the
costly 共Maister 1993兲. The elimination of waste will enable busi- philosophy and implementation of lean management: 共1兲 specify
nesses to improve quality, lower costs, and sustain market com- value; 共2兲 identify the value stream; 共3兲 flow; 共4兲 pull; and 共5兲
petitiveness while at the same time adding customer value and perfection 共Womack and Jones 1996兲. Initially, customers must
responsiveness, increasing employee morale, and improving cus- provide the definition of value, which is how the customer deter-
tomer satisfaction. mines whether or not the service provided satisfies their needs.
A lean management system can be contrasted with the tradi- Once the value desired by the customer has been appropriately
tional philosophy that emphasizes economies of scale to gain specified, the value stream, consisting of all actions 共encompass-
competitive advantages. For example, a batch-and-queue manu- ing the problem-solving, information management, and physical
facturing system, where large quantities of a part are produced at transformation tasks兲 required to produce value, must be accu-
one stage then moved as an entire batch to wait in the queue at the rately identified. It is at this step that operational modifications
next stage of production 共Womack and Jones 1996兲, is oriented will be made to identify and eliminate all actions that may not
toward the production of large volumes for sale at a lower unit create value to the customer. The concept of flow is then applied
cost than competitors. Although the introduction of lean manage- to the new value stream to enhance the efficient addition of value
ment principles may improve operations and business potential, through the operational stages and ultimately to the customer. The
some perceived benefits of the current operations will be compro- newly created value stream can then be used to shift from
mised and the implementation of lean principles should be evalu- ‘‘push,’’ where production and delivery instructions originate
ated on a situation-specific basis. For example, implementing lean from upstream supplier locations regardless of downstream cus-
management principles in place of batch-and-queue processes tomer conditions, to pull, where cascading production and deliv-
will eliminate certain wastes encountered during the production ery instructions are implemented at upstream supplier locations
process and reduce the lead times for the production of a product only when signaled by downstream customers 共Womack and
but may sacrifice the security provided by an inventory buffer. Jones 1996兲. In other words, the system will accommodate the
Likewise, a consulting business may be oriented toward maintain- production of the good or service in response to the customer
ing a high level of client-chargeable time 共billability兲 and empha- demand as opposed to the traditional batch-and-queue mass pro-
duction system, where production takes place in anticipation of
1
PhD Candidate, Univ. of Massachusetts, Amherst, MA. demand. The final fundamental concept in lean management is the
2
Associate Professor, Lally School of Management & Technology, continual striving to achieve perfection through radical and con-
Rensselaer Polytechnic Institute, Troy, NY. tinuous improvement efforts in the generation and delivery of the
Note. Discussion open until June 1, 2003. Separate discussions must
product or service to the customer.
be submitted for individual papers. To extend the closing date by one
month, a written request must be filed with the ASCE Managing Editor. The development of lean management principles originated in
The manuscript for this paper was submitted for review and possible Japanese manufacturing companies during the post-World War II
publication on September 5, 2001; approved on July 11, 2002. This paper era 共Emiliani 1998兲. Led by Eiji Toyoda and Taiichi Ohno of the
is part of the Journal of Management in Engineering, Vol. 19, No. 1, Toyota Motor Co. and Shigeo Shingo, the lean production phi-
January 1, 2003. ©ASCE, ISSN 0742-597X/2003/1-17–24/$18.00. losophy was established in response to the deficiency in human,

JOURNAL OF MANAGEMENT IN ENGINEERING / JANUARY 2003 / 17

J. Manage. Eng. 2003.19:17-24.


Downloaded from ascelibrary.org by New York University on 05/13/15. Copyright ASCE. For personal use only; all rights reserved.

Fig. 1. Typical project flow chart

material, and financial resources 共Emiliani 1998兲. Although lean institutions. The staffing makeup of an environmental consulting
management systems have since been predominantly imple- firm may include project managers and field personnel with
mented in manufacturing industries, such as automotive 共Womack strong technical backgrounds 共engineering, environmental sci-
and Jones 19962; Andel 1999; Vasilash 2000兲, aerospace 共Wom- ence, biology, chemistry, geology, hydrogeology, toxicology兲 and
ack and Jones 1996兲, molding 共Womack and Jones 1996兲, plastics skills 共construction, electrical兲, computer aided drawing 共CAD兲
共Moore 1999兲, computers 共Frynes and Ennis 1994兲, and electron- specialists, accountants, government program reimbursement spe-
ics 共Erkanat 1997兲, it has been reported that service industries cialists, and administrative personnel.
such as airline 共Cromm 1999; Sanchez 1993; Palmer, 1994兲, edu- Projects are primarily awarded to a company through either
cation 共Cromm 1999兲, and lodging 共Cromm 1999兲, have similarly word-of-mouth direct hiring or through a bidding process in
been improved using lean management systems. This paper will which more than one firm develops a work scope and provides a
explore the applicability of lean management principles to im- cost estimate for the desired service. During a bidding process,
prove business operations in the environmental consulting indus- the firm providing the service at the lowest cost to the client will
try. typically be awarded the project. Once the project has been
awarded, the project manager will coordinate efforts throughout
the company to successfully complete the desired service within
Environmental Consulting Industry the allotted budget. An example of a typical project flow chart is
included as Fig. 1.
Environmental consulting companies provide services that may Project costs are usually billed to the client on a unit cost
include the following: environmental site assessments; soil and 共lump sum payment兲, pay-for-performance 共fixed payment
groundwater remediation design and system installations; hazard- amounts at the successful completion of various stages of a
ous material 共lead, asbestos兲 monitoring and abatement oversight; project, regardless of the costs incurred to complete the respective
regulatory compliance and permitting; site development 共wet- stage兲 or a time and materials basis. In addition, some time and
lands delineation兲; industrial compliance; municipal services material costs may be eligible for reimbursement under state
共water supply and landfill monitoring兲; drilling; underground stor- sponsored insurance programs. It is readily apparent that if
age tank removal and installation oversight; and laboratory ser- projects can be accomplished more quickly or less costly, in-
vices. These services are provided to an extensive range of clien- creased profits will result for projects billed with either a unit cost
tele, including independent property owners, major oil or pay-for-performance structure. Firms that engage in contracts
corporations, real estate developers, insurance companies, mu- billed primarily on a time and materials basis will likely experi-
nicipalities, governmental organizations, law firms, and lending ence reduced financial benefits with lean management systems.

18 / JOURNAL OF MANAGEMENT IN ENGINEERING / JANUARY 2003

J. Manage. Eng. 2003.19:17-24.


Table 1. Examples of Waste in Environmental Consulting Industry
Waste form Examples and situations where waste is encountered
Defects • Report preparation 共errors兲
• Environmental sampling events 共incorrect sample locations or techniques兲
• Equipment usage 共equipment malfunctions兲
• Remedial system pilot testing 共errors in data collection; insufficient scope; inappropriate test type兲
• Field monitoring 共collecting incorrect or insufficient data兲
• Project management 共insufficient budget tracking兲
Rework • Report preparation 共revisions and reviews兲
• Environmental sampling events 共resampling兲
• Remedial system design and maintenance 共revisions to design; repeat maintenance events兲
• Development of computer drawings 共drawing revisions兲
• Accounting services 共billing; tracking invoices and purchase orders兲
Downloaded from ascelibrary.org by New York University on 05/13/15. Copyright ASCE. For personal use only; all rights reserved.

Transportation • Unnecessary site visits


• Inefficient scheduling 共travel time between sites that are not in close proximity to each other兲
• Interoffice transport of documents and field notes
Overproduction • Preparation of reports 共or sections in reports兲 that are not required
• Collection of unnecessary environmental samples
• Maintaining duplicate project files
• Conducting any work that has not been requested
Waiting • Preparation for fieldwork 共loading and calibrating equipment; securing appropriate vehicles兲
• Development of reports 共waiting for sections if using multiple authors; report reviews兲
• Waiting for approval to begin next project phase
• Unnecessary interruptions during meetings
Unnecessary processing • Generation of reports that are either overly complicated or not required
• Maintenance of excess project files
Unnecessary movement • Preparation of reports that include multiple authors or are subject to excess reviewers or revisions
• Unnecessary site visits
• ‘‘Last minute’’ scheduling changes 共unnecessary fieldwork preparation兲
• Locating information and equipment that is not properly organized
Inventory • Excess equipment and supplies
• Time associated with tracking down equipment not properly organized
• Inability to charge client for equipment usage due to either inefficient field operations and project
management, or inadequate equipment billing rates
• Project work backlog
Behaviors • Confusion regarding project scopes
• Negativity due to miscommunication or consistent occurrence of other forms of waste
• Other examples are provided by Emiliani 共1998兲
Systemic underdelegation • Inefficient task distribution 共requiring highly-priced staff to locate files or prepare reports that a more
junior employee could do; not utilizing skilled field technicians to fullest potential兲

However, benefits may include a lower cost to conduct business; Applying Five Fundamental Concepts
enhanced reputation for word-of-mouth direct hiring; increased
competitiveness when bidding for new projects; increased re- The same five fundamental concepts used in manufacturing and
source capacity; and robust buffering against potential fluctua- other service industries may be used to provide a framework for
tions in governmental reimbursement allotments or insurance ad- the implementation of lean management in an environmental con-
justments. sulting company. This section will address how lean management
Operations of an environmental consulting company are prone principles would be applied to an environmental consulting busi-
to the typical forms of waste experienced by other businesses. ness.
These forms of waste include the aforementioned defects, rework,
transportation, overproduction, waiting, unnecessary processing,
Specify Value
unnecessary movement, inventory, behaviors 共Emiliani 1998兲 and
systemic underdelegation 共Maister 1993兲 and may occur at any Typically, a client will conduct business with an environmental
stage within the project duration. Examples and situations where consulting company with the goal of achieving some level of
each of these forms of waste may be encountered in the environ- regulatory environmental compliance quickly and at minimal
mental consulting industry are included in Table 1. Applying the cost. This compliance status may be achieved through value-
five fundamental concepts 共specify value, identify the value creating processes ranging from obtaining permits to the remedia-
stream, flow, pull, and perfection兲 to the operations of an environ- tion of complex hazardous waste spills.
mental consulting company should enable the firm to eliminate Although the concept of specifying value may appear evident,
the sources of waste presented in Table 1 and achieve the benefits it is not uncommon for a company’s operations to be tailored
of lean management. toward maximizing employee productivity to achieve some de-

JOURNAL OF MANAGEMENT IN ENGINEERING / JANUARY 2003 / 19

J. Manage. Eng. 2003.19:17-24.


sired profit margin. This approach may unintentionally result in sible situations and examples of each form of waste that may be
employees losing sight of the customer’s goal and conducting identified during the analysis of the value stream for an environ-
unnecessary work to increase client-chargeable time 共billability兲 mental consulting firm were previously presented in Table 1. In
and, therefore, company revenues. In addition, project managers addition to the specific actions and interactions that contribute to
in a scientific and engineering based consulting company may these wastes, the existing organizational and project management
often become so absorbed with the scientific nature of a project structures may not fully support lean operations. For example, an
that the possibility exists of losing sight of the customer’s end analysis of the value stream may indicate that an organization
goal and conducting unnecessary assessment investigations, re- segregated into functional departments 共accounting, administra-
medial activities, report preparations, or engineering design speci- tive, scientific/technical departments兲 may not be as effective at
fications. Whereas these actions may be required in some in- producing value as one aligned in accordance with specific value-
stances, an operation must be able to maintain its focus on the creating processes 共drilling, engineering services, industrial com-
client’s ultimate goal of establishing environmental compliance pliance, site assessment兲. In addition, the current project manage-
quickly and at minimal cost without compromising scientific in- ment structure may in fact hinder the ability to efficiently share
tegrity. necessary resources 共information兲 and accurately track project
Downloaded from ascelibrary.org by New York University on 05/13/15. Copyright ASCE. For personal use only; all rights reserved.

In complex situations, one approach that may be used to aid in progress and costs, regardless of the organizational structure.
specifying value is to utilize quality function deployment 共QFD兲, Thus, the current value stream may be used as a tool toward
a visual decision-making procedure that may be used by inter- identifying actions and interactions, as well as organizational and
functional disciplines to develop product design specifications project management structures that may contribute waste to a
consistent with those desired by the customer 共Womack and Jones project. With the sources of waste identified, a desired value
1996; Chase et al. 1998; Tan and Shen 2000兲. An alternative ap- stream can then be created and used as a guide to institute leaner
proach is the integration of Kano’s model to illustrate the rela- operations that eliminate as much waste as possible.
tionship between customer satisfaction and the performance of a
product or service with respect to the following three distinct
categories: 1D attributes; attractive attributes; and must-be at- Flow
tributes 共Tan and Shen 2000兲. These techniques provide a means The concept of flow is then applied to the desired value stream to
to translate customer requirements into the development of a enhance the efficient addition of value through each stage of the
product or service by integrating the perspectives and efforts of project and ultimately to the customer. This concept may be ap-
each discipline. For example, QFD techniques may distinguish a plied to all aspects of a company’s operations, from the entire
difference in value desired by a property owner striving to de- organizational and project management structures to specific tasks
velop a brownfield site for industrial use with that of a party necessary to collect environmental samples. The concept of flow
responsible for ensuring the cleanup of contaminated groundwater should be applied in two phases for an environmental consulting
in the vicinity of a public drinking water source. organization: 共1兲 develop organizational and project management
structures capable of supporting lean operations, and 共2兲 modify
Identify Value Stream operations to improve flow within these structures.
Because of the highly specialized backgrounds of individuals
After value is specified, the current value stream should be iden- typically present within an environmental consulting company,
tified. Depending on the specific goals of the lean initiatives, this the organizational structure should be devised to capitalize on the
value stream may encompass all actions and interactions currently efficiencies of each individual’s area of expertise while maintain-
conducted during all phases of a project 共including project man- ing an effective level of project management. This organizational
agement; engineering design; and field, accounting, and adminis- structure may consist of various value-creating divisions with re-
trative services兲, or may target one specific value-creating process spect to each staff member’s background. For example, one group
共site assessment; engineering design兲 or task 共flow of information may be trained to conduct environmental site assessments effi-
from field technician to project manager兲. ciently while another may excel in the engineering design of com-
Although the value stream may be documented in a manner plex remediation systems.
consistent with a manufacturing process 共Rother and Shook In order to maintain sufficient project flow, the management
1999兲, some aspects of the value stream will differ due to the structure should allow a project manager to retain both responsi-
service-oriented nature of an environmental consulting firm. For bility and control throughout the duration of a project, regardless
example, process time 共measure of efficiency兲, average billing of the project phase. Often a project will begin in one phase 共site
rates 共identify underdelegation兲, and total process costs may be assessment兲 and transfer to another phase 共remediation兲. In these
better performance metrics than those used in traditional manu- cases, it is not uncommon for the original project manager in one
facturing operations 共including cycle time, changeover time, and value-creating division to retain responsibility for the project 共en-
production batch sizes兲. The performance metrics chosen may suring that established budgets are adhered to兲 while members of
relate better to the typical improvement goals that an environmen- another division control the project’s activities. This separate
tal consulting company may develop for its operations. In addi- responsibility/control management structure may contribute to
tion, the flow of a project through the organization may follow waste due to inhibited flow of information between the divisions
different paths depending on the respective project goal 共some and a lack of centralized budgetary control by the project man-
projects in an engineering value-creating process may require re- ager. In addition, frustration may arise when the project manager
mediation system design and subsequent installation, whereas is held responsible for the financial and performance outcomes of
others may only require remediation system performance moni- the project, but may not have the control over specific activities or
toring兲. As a result, the appropriate value stream will depend on be properly informed of the project status. In order to support a
the specific goals of the project. lean environment, it is important that both responsibility and con-
Once the current value stream has been identified, a detailed trol be granted to the project manager. Maintaining responsibility
analysis may be conducted to determine sources of waste. Pos- and control will enable the project manager to be aware of the

20 / JOURNAL OF MANAGEMENT IN ENGINEERING / JANUARY 2003

J. Manage. Eng. 2003.19:17-24.


Table 2. Examples of Flow Techniques
Flow techniques Examples of usage
Kaikaku • Organizational realignment 共value-creating divisions; constant project management; effective utilization of
staff and respective billing rates–reduce/eliminate underdelegation兲
• Report structure 共elimination of unnecessary sections兲
• Report flow process 共eliminate unnecessary authors and reviewers; develop and track templates for general,
non site-specific sections; logical order regarding preparation of sections, especially if using multiple authors兲
• Environmental sampling and remedial pilot testing protocol 共eliminate unnecessary sampling locations and
analyses, and pilot testing tasks兲
• Accounting system 共develop purchase order tracking system; institute modern software to reduce manual
entries; improve timeliness of invoicing procedures; monitor accounts payable/receivable statistics兲
• Project management and budgetary tracking system 共develop and adhere to focused scopes of work; maintain
accurate budgets; update and record all costs; require project management approval for all project-related
Downloaded from ascelibrary.org by New York University on 05/13/15. Copyright ASCE. For personal use only; all rights reserved.

purchases; maintain centralized proposal/contract files兲


• Filing system 共eliminate duplicate copies of field notes, reports, and correspondence; attain timely flow of field
notes to files兲
• Fieldwork scheduling system 共link together jobs in same locale to reduce travel time; provide scheduling
flexibility for last minute jobs; reduce unnecessary fieldwork preparation by changing schedule only when
absolutely necessary兲
• Equipment reservation policies 共centralized reservation log for interdepartment shared equipment; maintain
sufficient supply of equipment兲
• Inventory policies 共develop standard equipment and supply ordering criteria; track costs/profits due to
purchased equipment and inventory兲
Poka-yoke • Report checklists 共completed sections if using multiple authors; organized review process; confirmation of
review; schedule of report deadlines; monitor report deliverable statistics兲
• Project phase checklists 共plume delineation; risk assessment; system design criteria兲
• Inventory inspections 共maintain proper level of supplies; reduce amount of excess inventory兲
• Fieldwork preparation guidelines 共ensure proper equipment兲
• Itemized fieldwork scopes 共ensure focused work; ensure essential tasks are completed; reduce probability of
nonessential tasks兲
• Equipment maintenance 共routine calibrations; functionality checks兲
• Invoice checklists 共ensure proper billing of equipment and supplies兲
• Purchase order tracking system 共maintain control of accounting system兲
• Remediation system operation and maintenance 共status sheets to ensure required data is collected; produce
organized field notes兲
5Ss • Equipment and inventory organization 共layout geared to reduce fieldwork preparation time兲
• Filing system 共centralized files to reduce time to access information兲

current project status and encourage the close monitoring of all at frequent intervals to maintain a workplace in perfect condi-
stages of the value stream to maximize flow and reduce the po- tion兲; and 共5兲 shitsuke 共to form the habit of always following seiri,
tential for situations that may result in waste, such as underdel- seiton, seiso, and seiketsu兲. Examples of how each of these tech-
egation. If a situation arises where a change in the project man- niques may be used are included in Table 2. The flow techniques
ager will result in enhanced quality and accelerate the production and examples presented in Table 2 are potential methods that may
of the value to the client, then both project responsibility and be used to achieve flow in an environmental consulting company.
control should be assigned to the new project manager. Because the organizational and project management structures
Although it may appear that an effective organizational and and operating procedures may differ for each company, the cur-
project management structure alone will result in a lean operation, rent situation of the firm must be evaluated before implementing
it is also important to examine the desired value stream and de- any of the flow techniques.
velop systems to allow the individual tasks to flow adequately.
This step may include the use of some of the traditional manu-
Pull
facturing techniques such as kaikaku, which are radical improve-
ments of an activity to eliminate waste 共Womack and Jones Once the organizational and project management structures have
1996兲, poka-yoke, which are mistake-proofing devices designed to been put in place to accommodate lean operations, and systems
prevent product defects and improve quality 共Shingo 1986; Wom- have been developed to achieve flow within the desired value
ack and Jones 1996兲, and the 5 S’s 共Womack and Jones 1996兲, stream, the entire system can be set up to allow for a pull-oriented
which refer to the creation of a workplace suited for visual control project flow. Essentially, no services would be produced at up-
and lean production and include: 共1兲 seiri 共to separate needed stream stages until triggered by the downstream customer. This
tools, parts, and instructions from unneeded materials and to re- pull-oriented philosophy will enable the company to reduce the
move the unneeded materials兲; 共2兲 seiton 共to neatly arrange and amount of waste caused by conducting unnecessary work 共sched-
identify parts and tools for ease of use兲; 共3兲 seiso 共to conduct a uling field personnel solely to maintain chargeable goals兲 or re-
cleanup campaign兲; 共4兲 seiketsu 共to conduct seiri, seiton, and seiso taining excess levels of inventory items, and will allow the opera-

JOURNAL OF MANAGEMENT IN ENGINEERING / JANUARY 2003 / 21

J. Manage. Eng. 2003.19:17-24.


tion to better accommodate shifts in demand. A close examination acceptable timeline. These efforts to achieve perfection may in-
of the current and desired operations may reveal additional as- clude further organizational realignment, modifications to the
pects of the value stream and flow concepts that should be im- value-creating processes, or even changes to the services offered
proved to attain successfully a pull-oriented system. These areas to current and prospective clients. Although absolute perfection in
of improvement may become evident when viewing the system the operations of the firm will never be achieved, the constant
either internally to improve specific value processes or externally attention to sources of waste will allow the organization to con-
to improve service directly. tinually improve operations and produce the value desired by the
As with the concept of flow, techniques traditionally used in a client at reduced operational costs to the firm.
manufacturing environment, such as a kanban system, which uti-
lizes a simple card to regulate pull in an operating system by
signaling upstream production and delivery 共Womack and Jones Implementation Approach
1996兲, may be employed to help an environmental consulting
company achieve a pull-oriented project flow. A kanban may be An environmental consulting company should follow an orga-
used to regulate the flow of report preparations, initiate field work
Downloaded from ascelibrary.org by New York University on 05/13/15. Copyright ASCE. For personal use only; all rights reserved.

nized approach in order to effectively utilize the five fundamental


activities, or trigger the ordering of various inventory items. For concepts and successfully implement lean management prin-
example, a kanban system may include a ticket or card used to ciples. This approach includes: identifying areas of improvement
maintain an appropriate level of inventory items 共granular acti- and establishing management support; organizing a lean manage-
vated carbon treatment units兲 required at job sites. This use of a ment committee; applying the lean concepts to an isolated value-
kanban system will ensure that sufficient inventory items are creating process or task; expanding lean initiatives to other value-
available to maintain project continuity, while reducing the in- creating processes and tasks; and appropriately adjusting the
vestment of unnecessary inventory. company business strategy.
With an effective project management system in place, a pull- Initially, management must identify motivating factors for
oriented project flow will enable the project manager to maintain modifying the company’s current operations. These factors may
control over operations and ensure that the project proceeds in include the inability to achieve expected profit margins, maintain
accordance with the established work scope and budget. This in- proper project budgets, or successfully complete projects within a
creased level of project control will enable the company to effec- specified timeframe. With a desire to improve operations by mini-
tively complete projects and also identify additional areas for con- mizing waste, the company should designate a lean management
tinual improvement. A pull-oriented system should also allow for committee dedicated to improving the current operations through
enough operational flexibility to accommodate specific shifts in lean principles. This committee would be facilitated by a change
customer demand. This demand may impact all aspects of the agent, who is responsible for educating employees about the un-
organization ranging from accounting 共immediate invoice re- derlying principles of lean management and integrating the con-
sponse兲 to field services 共emergency spill responses兲. The in- cepts into the standard business practices. The committee should
creased level of customer service that is provided with a pull- encourage input from all employees at each level of the organi-
oriented system will help to retain current customers and zation to gain a better idea of potential sources of waste from
potentially increase its customer base through word-of-mouth rec- each person’s perspective and garner a sense of inclusion in the
ommendations. improvement efforts from each employee.
The committee should then identify one value-creating process
Perfection or task that needs improvement to be designated as the starting
point area. For example, lean initiatives may be implemented to
The company must now apply the final fundamental concept in improve the flow of information 共field notes兲 from field techni-
lean management and continually strive to achieve perfection in cians to project managers in the engineering services division.
the generation and delivery of the service to the customer. This The five fundamental concepts should be applied to this process
concept will require the development of systems designed to ac- while the rest of the organization continues to operate in accor-
curately measure and evaluate the effects of the lean initiatives. dance with current procedures. Success in this process will gen-
For example, a lean accounting system may be developed to in- erate interest across the company and encourage implementation
clude a value-stream/product-based costing system to accurately in other value-creating processes. This approach is similar to that
track costs at each stage of the value stream 共Womack and Jones used in the Toyota Production System where design changes can
1996兲. be made in one part of the organization without unduly affecting
Management will be required to continually evaluate the value other parts 共Spear and Bowen 1999兲. As a result, implementation
stream for each product and the performance measurement sys- and feedback can occur quickly and, if the results indicate suc-
tems and determine areas that may require improvements through cess, managers initially skeptical of the operational changes may
either kaikaku or kaizen techniques, which consist of continuous, be more willing to adopt the new practices. Thus, the success of
incremental improvements of an activity to create more value the lean initiatives in the starting point area will then serve to
with less waste 共Womack and Jones 1996兲. In order to remain encourage its expansion to other areas in the division and, ulti-
focused in the transition of these areas to lean, management mately, the entire company.
should utilize the concept of policy deployment 共known in Japa- Once lean principles have been integrated into various value-
nese as hoshin kanri兲, which refers to a strategic decision-making creating processes throughout the company, the lean management
tool used by management to focus the resources and critical ini- committee should expand to include representatives from each
tiatives necessary to accomplish the desired business objectives value-creating division to report on progress 共successes and diffi-
共Womack and Jones 1996兲. In environmental consulting compa- culties兲, develop periodic plans for improvement, and continually
nies, policy deployment would determine and prioritize goals, train employees about lean concepts and skills. Although unnec-
select projects necessary to achieve these goals, designate re- essary meetings would contribute to waste, the designated change
quired people and resources, and establish target levels and an agent would monitor the progress of lean implementation efforts

22 / JOURNAL OF MANAGEMENT IN ENGINEERING / JANUARY 2003

J. Manage. Eng. 2003.19:17-24.


throughout the company and facilitate meetings with the commit- separate departments providing their unique skills 共assessment,
tee on an as-needed basis to identify new applications for kaikaku remediation, etc.兲 to achieve project goals. In Firm 2, the organi-
and kaizen techniques. zation was client-based with each department responsible for ser-
Finally, because the successful implementation of lean man- vicing a similar group of clients with all tasks required being
agement will result in an increase in the amount of available performed within the department.
resources, the company should be prepared to modify its existing The function-based organization at Firm 1 took advantage of
business plan and develop a growth strategy to capitalize on the each worker’s individual skills. Project management was origi-
potential opportunities that may exist. These modifications may nally decentralized with responsibility shifting from one manager
include increased marketing efforts aimed at attracting additional to the next as tasks were completed. This structure led to tasks
work from current and prospective clients, the expansion of the being done in series and resulted in long project durations. In an
company into new geographical markets, or the diversification of effort to reduce the project durations, one centralized project man-
services provided into related areas. ager was given the responsibility to oversee an entire project. To
minimize project duration, schedules were developed that in-
volved performing multiple tasks concurrently. However, this
Downloaded from ascelibrary.org by New York University on 05/13/15. Copyright ASCE. For personal use only; all rights reserved.

Implementation Examples schedule format resulted in some tasks being performed unneces-
sarily or being reworked after subsequent information became
Lean concepts were applied to two environmental consulting available. One of the main causes of inefficiency was information
firms in an effort to improve client satisfaction. In order to ensure disconnect that often existed between project manager and the
confidentiality, the firms will be referred to as Firm 1 and Firm 2. group performing the work.
In this section, the implementation of the five fundamental lean At the client-based organization 共Firm 2兲, projects were as-
concepts will be discussed. For both firms, petroleum industry signed to a single staff member who was responsible for coordi-
clients made up their primary customers. A typical request would nating all tasks required for project completion. This structure
be to perform the environmental services associated with the re- allowed for reduced project misinformation and unnecessary
moval of underground storage tanks at a gasoline station. These work and fostered a cross-disciplined employee skill growth.
services would begin with a soil quality test and then, if petro- However, some tasks took longer than necessary, especially when
leum impact is detected, a subsequent full-scale site assessment a problem arose that was beyond the scope of expertise for the
would be performed, potentially leading to the design, installa- staff member. In this case, rework was performed or delay oc-
tion, and operation and maintenance of a subsurface remediation curred while assistance was requested from other staff members,
system. Other client requests follow similar patterns of site as- who had the necessary expertise to solve the problem.
sessment, design, installation, and maintenance. This work would The experiences of the two firms illustrate what happens when
typically be documented as part of a governmental regulatory competitive pressures motivate organizations to apply lean con-
reporting system. The motivation for considering the application cepts. In Firm 1, in an effort to reduce lead times, project man-
of lean concepts was primarily to reduce costs and ensure client agement responsibility was changed, but some new forms of
satisfaction in what is a very competitive industry. waste materialized. In Firm 2, a structure that generally is thought
to be required for lean systems fell short at times. It appears that
the hybrid organizational structure that consists of cross-trained
Specify Value workers can be effective. However, to be effective, personnel
For both firms, the primary focus is to ensure client satisfaction must have quick access to workers with specialized skills and
by accurately achieving all regulatory standards in a timely fash- operate in such a way that no tasks would be performed unnec-
ion at a minimal cost. The firms’ secondary focus is to ensure that essarily. The methods described in the next section can be used to
the intent of the regulatory standards is met in a manner that help encourage reduced lead times and project costs without un-
protects the health and safety of the public. The latter focus may necessary tasks being performed.
only be in effect in the rare case where a particular client is
motivated to deceive or otherwise violate the intent of the appli- Pull
cable standard.
At both firms, significant improvements in operations were ob-
tained through the implementation of a pull system. Some of the
Identify Value Stream operational changes that followed a pull methodology are de-
The framework presented in Fig. 1 describes the main value- scribed below:
added tasks that were identified as making up the value stream for • A kanban system for controlling the inventory of field granular
the two firms. Using the gasoline station client as an example, the activated carbon treatment units was implemented. This sys-
tasks would typically consist of a subset of the following: 共1兲 tem reduces inventory and ensures that enough carbon is on
outline scope of work; 共2兲 project bidding; 共3兲 schedule develop- site or available at the office stockyard. In this system, a small
ment; 共4兲 overseeing of tank excavation; 共5兲 site assessment; 共6兲 inventory of units is available at each site. When only one unit
remediation services; 共7兲 postremedial monitoring; and 共8兲 site remains on-site, a card containing specific characteristics of
closure. the unit and ordering quantity is delivered to a centralized
inventory manager, who immediately places an order to re-
plenish the inventory. Prior to the implementation of this sys-
Flow
tem, some sites included unnecessarily high inventory levels
The organizational and project management structures of the two while other sites experienced frequent project delay due to an
firms differed and thus provide a means for comparing their struc- inadequate supply of units. The kanban system ensures avail-
ture impact on providing value to clients and supporting lean ability while minimizing inventory levels and simplifying in-
operations. In Firm 1, the organization was function-based with ventory management.

JOURNAL OF MANAGEMENT IN ENGINEERING / JANUARY 2003 / 23

J. Manage. Eng. 2003.19:17-24.


• The work order system was redesigned to ensure that the prevents the companies from being too focused on internal issues
worker will the appropriate level of expertise is assigned to that may or may not directly impact client satisfaction.
each job task. This system reduces underdelegation of tasks,
reduces rework of mistakes, and ultimately lowers project
costs. Summary
• A pull system for preparing quarterly and semiannual site
monitoring reports was implemented. In this system, each site The intent of this study was to explore the applicability of lean
has a specific file where field notes are inserted upon comple- management principles to improve business operations in an en-
tion. Copies of lab reports are inserted as soon as they are vironmental consulting company. Although the lean philosophy
completed and a document tracking sheet is added to signal
was originally applied to manufacturing industries, other service
that the subsequent task is ready to be performed. The contents
industries have successfully integrated lean management to im-
of the reports were reduced to minimize unnecessary textual
prove operations. This study has presented the five fundamental
writings and deliver only the information desired by the client.
concepts of lean management so that environmental consulting
• A formalized system for initiating each main job task was
Downloaded from ascelibrary.org by New York University on 05/13/15. Copyright ASCE. For personal use only; all rights reserved.

firms can use them to reduce waste and enhance their business
implemented to ensure that no work would be completed prior
operations. In addition to this framework, an organized imple-
to the completion of predecessor tasks. In this system, written
mentation approach must be developed on a case-specific basis
work orders are required before a task is performed. The sys-
for each company, depending on its respective current operational
tem reduces the amount of unnecessary work conducted on a
status and designated goals. Because these lean management prin-
project and ensures that the project manager has control of the
ciples appear to be applicable to an environmental consulting
project. Also, work is only conducted if signaled by the down-
company, it would seem likely that other companies of a similar
stream source, including the requirement of a signed project
scientific and technical nature may also benefit from the lean
contract or change order from the client. The system also
management model presented in this study.
makes it easier to identify operational problems when review-
ing project costs in the billing worksheet.
• A standardized checklist was developed for site assessments
and remediation system operation and monitoring events to References
ensure that all tasks were performed when required. This fool-
proofing mechanism reduces the number of oversights and re- Andel, T. 共1999兲. ‘‘Accentuate Heijunka, eliminate junk.’’ Material han-
sulting site visits necessary to complete tasks that should have dling engineering, 54共8兲.
been performed during an earlier visit. Chase, R. B., Aquilano, N. J., and Jacobs, F. R. 共1998兲. Production and
operations management: Manufacturing and services, 8th Ed.,
McGraw-Hill, Boston, 90–92.
Perfection Comm, C. L. 共1999兲. ‘‘Marketing lean initiatives in service industries.’’ J.
Prof. Serv. Market., 18共2兲, 59– 64.
In the two firms, monitoring and control systems were put into Emiliani, M. L. 共1998兲. ‘‘Lean behaviors.’’ Manage. Decision, 36共9兲,
place to track performance relative to providing value to custom- 615– 631.
ers. To supplement accounting systems that provided cost control, Erkanat, J. 共1997兲. ‘‘Adding value without adding cost.’’ Electronic Bus.
systems were developed to control project duration times. For Today, 23共2兲, 47–50.
each project, a new system keeps track of deliverable dates and Fynes, B., and Ennis, S. 共1994兲. ‘‘From lean production to lean logistics:
whether or not due dates are met. Another system keeps track of The case of Microsoft Ireland.’’ Eur. Manage. J., 12共3兲, 322–331.
the results of client reviews, which are now required for each Maister, D. H. 共1993兲. Managing the professional service firm, Simon and
completed project. This system allows the firms to directly moni- Schuster, New York, 41–50, 195.
Moore, S. 共1999兲. ‘‘Lean operations are future of processing for Asian
tor and control the satisfaction level of clients. The information
companies.’’ Mod. Plast., 29共8兲, 44 – 47.
from these systems provides insights into where operations were Palmer, J. 共1994兲. ‘‘The British are coming.’’ Barron’s, Dec 12.
effective and where improvements are needed. Rother, M., and Shook, J. 共1999兲. Learning to see, Version 1.2, The Lean
Other facets of the system to control and monitor performance Enterprise Institute, Brookline, Mass.
included the development of standardized monthly project billing Sanchez, J. 共1993兲. ‘‘Southwest Air shakes up its competitors airlines:
worksheets to track costs with respect to budgets and periodic Cheap fares and a blistering expansion are forcing bigger airlines to
staff meetings for obtaining qualitative input on performance. For take notice, a federal study says.’’ The Los Angeles Times, May 12.
example, through these meetings, the positive effect of the kanban Shingo, S. 共1986兲. Zero quality control: Source inspection and the poka-
system for controlling the ordering of granular activated carbon yoke system, Productivity Press, Stamford, Conn., 42– 46, 48.
treatment units was evident in terms of less frustration by workers Spear, S., and Bowen, H. K. 共1999兲. ‘‘Decoding the DNA of the Toyota
production system.’’ Harvard Business Review.
who previously would have to either go back to the office to pick
Tan, K. C., and Shen. 共2000兲. ‘‘Integrating Kano’s model in the planning
up a unit or shut down the system due to a shortage of units. At
matrix of quality function deployment.’’ Total quality management,
these meetings, other applications of the kanban control system 11共8兲, 1141–1151.
and foolproofing were discussed. Vasilash, G. S. 共2000兲. ‘‘Standardized lean.’’ Auto. Manuf. Product.,
On an annual basis, policy deployment plans are developed, 112共2兲, 52–54.
thus ensuring that plans continue to be focused on how to more Womack, J. P., and Jones, D. T. 共1996兲. Lean thinking, Simon and
aggressively achieve the goals of clients. This periodic activity Schuster, New York.

24 / JOURNAL OF MANAGEMENT IN ENGINEERING / JANUARY 2003